flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

SOM to lead the design of the 2026 Milan-Cortina Olympic Village

Mixed-Use

SOM to lead the design of the 2026 Milan-Cortina Olympic Village

The project is part of the updated Porta Romana railway yard master plan.


By David Malone, Managing Editor | July 16, 2021
SOM Olympic Village aerial
SOM Olympic Village aerial

Following an international competition that featured 27 groups comprised of 71 studios from nine different countries, SOM has been selected to design the Olympic Village for the 2026 Milan-Cortina Olympics.

The new Olympic Village will transform the Porta Romana district, creating a sustainable urban community and offer a new model for Olympic facilities to serve post-Olympic social goals. The village encompasses a set of public green spaces, the transformation of two historic structures, and six new mass timber residential buildings that will serve Olympic athletes in the short term.

 

SOM Olympic Village

 

After the Olympics, the athletes homes will be reused for student housing; the park and railway side buildings near the Olympic Square will be used for affordable housing; and the Olympic Village Plaza will become a neighborhood square with shops, bars, restaurants, and cafes planned at street level, along with outdoor space for farmers’ markets and other community events.

“Rather than ceasing to be of use after the Olympics, the Porta Romana Olympic Village will ultimately become a vibrant, self-sustaining neighborhood built around the principles of social equity, environmental commitment, wellness, and inclusivity,” said SOM Design Partner Colin Koop, in a release. “The village adopts the rhythm of the area’s streetscape, creating a porous urban block with a variety of public spaces and communal anchors that will enhance Milan’s vibrant tapestry of ground floor experiences.”

 

SOM Olympic Village square

 

The new buildings take architectural inspiration from the historic buildings of Milan, featuring contemporary materials and communal terraces. Shaded by vertical plantings, these terraces serve as bridges between the buildings, becoming signature gathering spaces and outdoor study rooms for students. The integration of greenery within the outdoor areas will contribute to the neighborhood’s climate resilience while also creating space for urban farms that enable on-site for production.

 

SOM retail/cafe

 

The village’s mechanical systems will tie in to the precinct’s loops, with passive cooling strategies, solar panels, and rooftop gardens ensuring more than 30% of the energy used will be produced on site. Stormwater will be collected on site and reused, with a reduction in the use of drinking water by 50% and CO2 reduction of 40% for heating and cooling. The village will target minimal environmental impact in accordance with Nearly Zero Energy Building requirements.

Construction of the Olympic Village is slated to be completed by July 2025.

 

SOM Olympic Village terraces

Tags

Related Stories

Wood | Apr 13, 2022

Mass timber: Multifamily’s next big building system

Mass timber construction experts offer advice on how to use prefabricated wood systems to help you reach for the heights with your next apartment or condominium project. 

Office Buildings | Apr 11, 2022

SOM-designed office tower aims to promote health and wellness

Skidmore, Owings & Merrill (SOM) recently completed work on 800 Fulton Market, a new mixed-use office building in Chicago’s historic Fulton Market/West Loop neighborhood.

Multifamily Housing | Mar 29, 2022

Here’s why the U.S. needs more ‘TOD’ housing

Transit-oriented developments help address the housing affordability issue that many cities and suburbs are facing.

Multifamily Housing | Feb 24, 2022

First new, mixed-use high-rise in Detroit’s central business district in nearly 30 years opens

City Club Apartments completed two multifamily projects in 2021 in downtown Detroit including the first new, mixed-use high-rise in Detroit’s central business district in nearly 30 years.

Office Buildings | Feb 23, 2022

The Beam on Farmer, Arizona’s first mass timber, multi-story office building tops out

The Beam on Farmer, Arizona’s first mass timber, multi-story office building, topped out on Feb. 10, 2022.

Mixed-Use | Feb 9, 2022

David Chipperfield Architects to design Schützenstraße mixed-use development in Munich

The firm recently won a competition for the project.

Mixed-Use | Jan 13, 2022

Details unveiled for Atlanta’s Campus 244 mixed-use development

S9 Architecture is designing the project.

Mixed-Use | Jan 10, 2022

Mixed-use Arsenal Yards completes in Watertown’s East End

PCA master-planned the seven-building, one million sf destination and designed the urban village, residences, and open spaces.

Mixed-Use | Jan 5, 2022

Waterfront Station II breaks ground in Washington, D.C.

The mixed-use project will include 30% affordable housing.

Mixed-Use | Dec 21, 2021

Riverside Wharf will be Miami’s newest entertainment complex

Cube3 Architects is designing the project.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021