flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

SOM’s Salt Lake City skyscraper uses innovative structural system to suspend itself over a neighboring building

High-rise Construction

SOM’s Salt Lake City skyscraper uses innovative structural system to suspend itself over a neighboring building

The hat truss-supported office tower was topped off in January, rising 25 stories above the Salt Lake City streets.


By BD+C Editors | March 28, 2016

Rendering © Skidmore, Owings & Merrill LLP

Located in the heart of downtown Salt Lake City, 111 Main is the freshest face on the Crossroads of the West’s skyline. The building, whose roof hat truss structure was just topped off in January, transferred its loads from a temporary shoring support system to the permanent structural system during a 12-hour period.

The building’s architect and structural engineer, Skidmore Owings & Merrill, had to find a solution to a complex problem brought on by the building site's location: how to suspend a portion of the building over an adjacent structure.

111 Main is on a contiguous parcel with the new Salt Lake County Center for the Arts’ George S. and Dolores Doré Eccles Theater, which overlaps on the lower four stories and basement level of the tower footprint. To accommodate the Eccles Theater under the southern portion of 111 Main’s tower, a structural system was required that did not extend columns below the fifth level of the tower on the south side.

SOM designed the penthouse roof level of the 387-foot-tall building to be comprised of a balanced two-way steel hat truss system that supports the office tower’s 18 perimeter columns in an integrated load-balanced structure. The central reinforced concrete core walls provide the only connection of the tower to its foundation and resist all gravity loads, as well as wind and seismic vertical and lateral loads. In fact, 111 Main was designed and built to withstand a 2,500-year earthquake event.

 

Photo: City Creek Reserve, Inc.; Rendering: SOM 

 

Conventional long-span, composite-steel floor framing construction connects the central core walls to the perimeter steel frame and suspended columns, providing open office spaces free of interior columns and a completely column-free lobby at the tower’s base.

111 Main is looking to achieve LEED Gold certification by using less energy and water and reducing greenhouse gas emissions. Building operation is targeted to operate 15% below Utah’s energy codes and will utilize fully automated, under-floor energy conserving HVAC systems with 16-inch raised floors.

The aforementioned lobby will consist of 35-foot-tall clear glass and span 5,876 sf. Overall, there will be approximately 440,000 sf available to rent.

Because of the unique hat truss structural system that allows for a column-free floor design throughout, the use of floor-to-ceiling glass offices stands out even more. One of the more unique amenities is the building lobby’s connection to the Eccles Theater Grand Lobby, the building that 111 Main hovers over and fits with like a Tetris piece.

A combination of five low-rise elevators, four high-rise elevators, and one freight elevator will be used to get people where they need to go within the structure. 111 Main will feature state-of-the-art fiber infrastructure, redundant data feeds, and electricity sourced from two substations.

Joining SOM on the Building Team is Oakland Construction (GC) and City Creek Reserve (Developer).

The anticipated completion date for 111 Main is August 2016.

Related Stories

High-rise Construction | Sep 15, 2015

Developers tap crowdfunding investors to finance construction and renovation projects

The world’s first crowdfunded skyscraper is near completion in Colombia.

High-rise Construction | Sep 10, 2015

New York’s Central Park Tower loses its spire but still adds some height

This building, the tallest under development at the moment, is the latest manifestation of the city’s luxury residential construction boom. 

High-rise Construction | Sep 3, 2015

Rafael Viñoly's 'Walkie-Talkie' tower named U.K.'s worst new building

The curved, glass tower at 20 Fenchurch Street in London has been known to reflect intense heat onto the streets below (in one instance damaging a car) and cause severe wind gusts. 

High-rise Construction | Sep 2, 2015

Nashville officials and residents weigh the pros and cons of taller, thinner skyscrapers

One developer proposes building a 38-story tower on a half-acre of land. 

Retail Centers | Aug 31, 2015

Urban developers add supermarkets to the mixes

Several high-rise projects include street-level Whole Foods Markets.

Multifamily Housing | Aug 27, 2015

Architects propose shipping container tower to replace slums

The firm says approximately 2,500 containers would be needed to complete the design, which aims to accommodate as many as 5,000 people.

Multifamily Housing | Aug 25, 2015

London multifamily building to have transparent swimming pool designed by Arup

Residents and visitors will be able to swim 10 stories above ground, and see views of London.

High-rise Construction | Aug 14, 2015

Pei Cobb Freed designs ‘glass sail’ tower for Shenzhen

The 29-story tower won’t be the tallest in the city, but it will set itself apart from surrounding, glimmering towers with gently curved façades, resembling sails blown by the wind.

High-rise Construction | Aug 12, 2015

Construction begins for Kengo Kuma-designed twisted Rolex tower in Dallas

Japanese architect Kengo Kuma designs tower with gradually rotating floor plates for Rolex's new office in Dallas.

High-rise Construction | Aug 11, 2015

Calatrava's Turning Torso wins CTBUH's 10 Year Award

The 623-foot, 57-story tower was the world's first twisting skyscraper. Completed in 2005, the building, designed by Santiago Calatrava, rotates 90 degrees along its height. 

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021