flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

A sports entertainment district is approved for downtown Orlando

Mixed-Use

A sports entertainment district is approved for downtown Orlando

This $500 million mixed-use development will take up nearly nine blocks.


By John Caulfield, Senior Editor | April 23, 2024
Rendering of Sports Entertainment District in downtown Orlando
Orlando, Fla.'s recently approved sports entertainment district has been in the works for several years. Images credit: JMA Ventures

Orlando, Fla., will be the next city to ride the wave of sports and entertainment districts rising up in urban centers across the country.

City officials on Monday approved plans for the redevelopment of an 8.5-acre block in downtown Orlando for a 900,000-sf mixed-use community hub named Westcourt.  Adjacent to the Kia Center arena that is home to the Orlando Magic NBA franchise, the new sports entertainment district will include a 260-key hotel with a 16,000-sf meeting area; 270 residential units, a 3,500-person capacity live entertainment venue,  up to 300,000 sf of Class A office space with a 17,000-sf rooftop amenity and a 6,000-sf glass-enclosed event space; and 120,000 sf of retail space, supported by a 1,140-stall parking garage and a 1.5-acre outdoor green space with a 28,000-sf “urban living room.”

Also see: 12 U.S. markets where entertainment districts are under consideration or construction.

The Orlando sports entertainment district is scheduled to begin construction later this year and to be completed by March 2027. It is being developed by a joint venture that includes the DeVos family (which owns the Magic), JMA Ventures LLC, SED Development LLC, and Machete Group, an advisory firm providing venue development, transactional, and organizational strategy services to industry-leading clients in sports, entertainment, and real estate development. Machete’s arena portfolio includes Chase Center in San Francisco and Barclays Center in Brooklyn, N.Y.

At presstime, the development team had not chosen a general contractor for this project. The developers did not disclose the cost of the new district. But early-stage reports about this project—which dates back at least a decade—pegged the investment at $500 million. WESH 2 News reported that the DeVos family has owned this land for 11 years. Orlando city commissioners recently approved incentives to move this project forward, including up to $40 million in property tax refunds, called a Tax Increment Recapture; and up to $2.5 million toward an event space.

Leveraging the arena’s drawing power

 

An outdoor “urban living room” will be one of the district's amenities.

San Francisco-based JMA Ventures, whose portfolio leans toward hospitality projects, is the master developer of the Orlando district. It will provide overall asset and construction management, and establish a hotel partnership with a national hotel operator.

JMA states that the district would leverage its adjacency to Kia Center, which hosts more than 200 arena events each year that attract more than 1.7 million visitors. The downtown location already has a weekday office population of 95,000, and the district’s access would benefit from its proximity to Interstate 4 and bus and light rail lines.

“Orlando Sports Entertainment District will be a catalyst for redefining downtown Orlando,” JMA states. “It will transform an empty lot into a fully activated, vibrant urban core that promotes foot traffic and collaboration.”

Editor's note: New information from the developer was added to this article on April 24.

Related Stories

Mixed-Use | Oct 7, 2024

New mixed-use tower by Studio Gang completes first phase of San Francisco waterfront redevelopment

Construction was recently completed on Verde, a new mixed-use tower along the San Francisco waterfront, marking the end of the first phase of the Mission Rock development. Verde is the fourth and final building of phase one of the 28-acre project that will be constructed in several phases guided by design principles developed by a design cohort led by Studio Gang.

Affordable Housing | Oct 4, 2024

3 new affordable housing projects for October 2024

As affordable housing continues to grow, more projects are looking to diversify their footprint by adding mixed-use components, community areas, and more.

Mixed-Use | Sep 19, 2024

A Toronto development will transform a 32-acre shopping center site into a mixed-use urban neighborhood

Toronto developers Mattamy Homes and QuadReal Property Group have launched The Clove, the first phase in the Cloverdale, a $6 billion multi-tower development. The project will transform Cloverdale Mall, a 32-acre shopping center in Toronto, into a mixed-use urban neighborhood.

Mixed-Use | Sep 10, 2024

Centennial Yards, a $5 billion mixed-use development in downtown Atlanta, tops out its first residential tower

Centennial Yards Company has topped out The Mitchell, the first residential tower of Centennial Yards, a $5 billion mixed-use development in downtown Atlanta. Construction of the apartment building is expected to be complete by the middle of next year, with first move-ins slated for summer 2025.

Codes and Standards | Sep 3, 2024

Atlanta aims to crack down on blighted properties with new tax

A new Atlanta law is intended to crack down on absentee landlords including commercial property owners and clean up neglected properties. The “Blight Tax” allows city officials to put levies on blighted property owners up to 25 times higher than current millage rates.

Building Technology | Aug 23, 2024

Top-down construction: Streamlining the building process | BD+C

Learn why top-down construction is becoming popular again for urban projects and how it can benefit your construction process in this comprehensive blog.

Mixed-Use | Aug 21, 2024

Adaptive reuse of a Sears store becomes luxury mixed-use housing

6 Corners Lofts at 4714 W Irving Park Road, Chicago, Ill., opened in March of 2024 as a 394,000-sf adaptive reuse project born out of a former Sears store.

Curtain Wall | Aug 15, 2024

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

Adaptive Reuse | Aug 14, 2024

Adaptive reuse revives a former warehouse in St. Louis

The Victor, as the building is now called, has nearly 400 residential apartments.

Adaptive Reuse | Aug 14, 2024

KPF unveils design for repositioning of Norman Foster’s 8 Canada Square tower in London

8 Canada Square, a Norman Foster-designed office building that’s currently the global headquarters of HSBC Holdings, will have large sections of its façade removed to create landscaped terraces. The project, designed by KPF, will be the world’s largest transformation of an office tower into a sustainable mixed-use building.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021