Teeple Architects, in association with Stantec, has completed the $84.5-million, 230,000-sf renovation and expansion project of the existing Edmonton Public Library (EPL) main branch into an innovative and welcoming civic hub.
Now named the Stanley A. Milner Library, the facility originally opened as Edmonton’s Centennial Library in 1967. The renovation and expansion project actively supports the library’s position as a social and creative destination at its prominent downtown location on Sir Winston Churchill Square.
The original scope of the project included replacing the building’s exterior precast panels with a new energy efficient zinc building envelope with expanses of glazing, upgrading several aging building systems, activating the civic space around the building, and creating a new architectural identity to foster greater community engagement.
The public is invited inside the building via colored skylights, glazing panels, EPL signage, and a new plaza with clear views into the library’s programming, transforming the new library into a welcoming portal between Sir Winston Churchill Square and Centennial Square.
After collaboration with EPL and the City of Edmonton the project was expanded to include a comprehensive interior renovation. Visitors enter into a bright six-story atrium defined by a new “reading ramp” and a two-story interactive display wall. Basement lobby space for the the building’s theater and event rooms is now visible through voids in the floor.
New amenities spaces include large galleria spaces, a cafe, a multi-functional children’s library, maker spaces, a gaming space, a teaching kitchen, meeting spaces, administrative offices, and the PÎYÊSÎW WÂSKÂHIKAN (Thunderbird House), an Indigenous gathering and smudging space designed in consultation with local Cree Elders and their communities.
The Shelley Milner Children’s Library nearly triples the size of the original children’s area and hosts the Gwyn Morgan & Patricia Trottier Foundation Early Literacy Centre, the Brown Family Playspace, and the Al & Fran Olson Children’s Makerspace for ages 6-12.
The Makerspace on the second floor is for ages 12 and up and encompasses 10,000 sf. It comprises 3D printers, a heat press, a vinyl cutter, a sewing and serving center, a book binding area, a fully equipped Fab Lab with a laser cutter, a computer lab, a digital conversion services center, and recording studios.
The Stanley A. Milner Library Renewal project was completed in 2020.
Related Stories
Libraries | Jun 8, 2022
Welcome to the hybrid library
Libraries have grown to become the intellectual and social hubs of campus, where, prior to March 2020, students, researchers, and faculty gathered to collaborate and connect.
K-12 Schools | Mar 8, 2022
Design delivers new media messages for schools
Media centers are no longer physically confined to one room.
University Buildings | Feb 18, 2022
On-campus performing arts centers and museums can be talent magnets for universities
Cultural facilities are changing the way prospective students and parents view higher education campuses.
University Buildings | Feb 18, 2022
UPenn converts a library past its prime to a tech-integrated learning and maker
In September 2021, Penn reopened its renovated and expanded library as an open center for cross-disciplinary learning, prototyping, and collaboration. Now called Biotech Commons, the 17,000-sf building supports new modes of research by offering a range of spaces and services that is free to be scheduled by any student or faculty member.
Libraries | Nov 22, 2021
Atlanta’s Central Library completes its $50 million renovation
Cooper Carry in association with Vines Architecture designed the project.
Giants 400 | Nov 19, 2021
2021 Cultural Facilities Giants: Top architecture, engineering, and construction firms in the U.S. cultural facilities sector
Gensler, AECOM, Buro Happold, and Arup top BD+C's rankings of the nation's largest cultural facilities sector architecture, engineering, and construction firms, as reported in the 2021 Giants 400 Report.
Libraries | Sep 22, 2021
Three libraries in California were built in less than two years under a P3 contract
A nonprofit with tax advantages funded the project.
Giants 400 | Aug 30, 2021
2021 Giants 400 Report: Ranking the largest architecture, engineering, and construction firms in the U.S.
The 2021 Giants 400 Report includes more than 130 rankings across 25 building sectors and specialty categories.
Libraries | Aug 26, 2021
Fort Worth’s first public library for children opens
KAI designed the project.
Resiliency | Aug 19, 2021
White paper outlines cost-effective flood protection approaches for building owners
A new white paper from Walter P Moore offers an in-depth review of the flood protection process and proven approaches.