Stellar, an architecture, engineering, construction and mechanical services firm, has won four Excellence in Construction awards from the Florida First Coast Chapter of the Associated Builders and Contractors (ABC).
ABC's Excellence In Construction program is the industry’s leading award competition, recognizing outstanding construction projects in a variety of categories. Evaluation criteria include personnel management, quality control, scheduling, value analysis, obstacles overcome in the course of the project, and more.
Winners were recognized August 10 at an awards celebration at the Omni Hotel Jacksonville on the Riverwalk. All four of Stellar’s nominations won awards. The winning projects are:
Joint Base Myer-Henderson Hall
Stellar completed design and construction of the 65,000-sf addition and renovation to the Marine Corps Exchange (MCX) at Joint Base Myer-Henderson Hall in Alexandria, Virginia. The MCX, a general merchandise retail store, remained open for business throughout construction. Extensive subsurface foundations and underpinning for existing structures immediately adjacent to the project further challenged the construction sequencing. Stellar began work in April 2010 and completed the project October 2011.
Leilehua Golf Course
Serving as design-builder, Stellar renovated Leilehua Golf Course, a military-owned public course on the Hawaiian Island of Oahu. The project brought the nearly 70-year-old course up to United States Golf Association standards. The course is now being hailed as one of the military’s top courses worldwide. Construction began January 2011 and was complete March 2012.
St. Mark’s Episcopal Church and Day School
Stellar provided pre-construction and construction management services for the renovation and expansion of St. Mark’s Episcopal Church and Day School. The project united the school campus and church campus, previously divided by Oxford Avenue, and included creation of a new campus green; addition and renovation of the 1968 vintage chapel; a new 10,000-sf commons building; and 7,400-sf of new covered walkways and a drop-off pavilion. Construction began June 2011 and was complete May 2012.
Warrior Zone
Stellar provided architectural, engineering and construction services for a state-of-the-art recreational center called the Warrior Zone, located at Joint Base Lewis-McChord near Tacoma, Washington. Construction began on the 29,000-sf building in September 2010 and was complete October 2011. Stellar worked with the military’s Morale, Welfare, & Recreation branch to help develop the concept for this high-tech facility. In additional to a theatre, restaurant, and billiards, entertainment includes online games played individually or remotely with others using Alienware computers. +
Related Stories
Government Buildings | May 10, 2024
New federal buildings must be all-electric by 2030
A new Biden Administration rule bans the use of fossil fuels in new federal buildings beginning in 2030. The announcement came despite longstanding opposition to the rule by the natural gas industry.
Sustainable Development | May 10, 2024
Nature as the city: Why it’s time for a new framework to guide development
NBBJ leaders Jonathan Ward and Margaret Montgomery explore five inspirational ideas they are actively integrating into projects to ensure more healthy, natural cities.
Mass Timber | May 8, 2024
Portland's Timberview VIII mass timber multifamily development will offer more than 100 affordable units
An eight-story, 72,000-sf mass timber apartment building in Portland, Ore., topped out this winter and will soon offer over 100 affordable units. The structure is the tallest affordable housing mass timber building and the first Type IV-C affordable housing building in the city.
Architects | May 8, 2024
Ivan O’Garro, AIA joins LEO A DALY as a vice president
Integrated design firm LEO A DALY welcomes Ivan O’Garro, AIA, as a vice president and managing principal of its Atlanta studio.
K-12 Schools | May 7, 2024
World's first K-12 school to achieve both LEED for Schools Platinum and WELL Platinum
A new K-12 school in Washington, D.C., is the first school in the world to achieve both LEED for Schools Platinum and WELL Platinum, according to its architect, Perkins Eastman. The John Lewis Elementary School is also the first school in the District of Columbia designed to achieve net-zero energy (NZE).
Healthcare Facilities | May 6, 2024
Hospital construction costs for 2024
Data from Gordian breaks down the average cost per square foot for a three-story hospital across 10 U.S. cities.
Biophilic Design | May 6, 2024
The benefits of biophilic design in the built environment
Biophilic design in the built environment supports the health and wellbeing of individuals, as they spend most of their time indoors.
MFPRO+ Special Reports | May 6, 2024
Top 10 trends in affordable housing
Among affordable housing developers today, there’s one commonality tying projects together: uncertainty. AEC firms share their latest insights and philosophies on the future of affordable housing in BD+C's 2023 Multifamily Annual Report.
Retail Centers | May 3, 2024
Outside Las Vegas, two unused office buildings will be turned into an open-air retail development
In Henderson, Nev., a city roughly 15 miles southeast of Las Vegas, 100,000 sf of unused office space will be turned into an open-air retail development called The Cliff. The $30 million adaptive reuse development will convert the site’s two office buildings into a destination for retail stores, chef-driven restaurants, and community entertainment.
Codes and Standards | May 3, 2024
New York City considering bill to prevent building collapses
The New York City Council is considering a proposed law with the goal of preventing building collapses. The Billingsley Structural Integrity Act is a response to the collapse of 1915 Billingsley Terrace in the Bronx last December.