flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Step(1) housing: A new approach to sheltering unhoused people in Redwood City, Calif.

Multifamily Housing

Step(1) housing: A new approach to sheltering unhoused people in Redwood City, Calif.

This modular housing development features individual sleeping units, private bathrooms, shared services, and community spaces. 


By Peter Fabris, Contributing Editor | February 1, 2023
The San Mateo County Navigation Center represents the first built instance of the Office of Charles F. Bloszies’s “Step1” interim supportive housing system
The San Mateo County Navigation Center represents the first built instance of the Office of Charles F. Bloszies’s “Step1” interim supportive housing system. With the exception of two larger structures for gathering spaces and communal dining, all buildings are composed of prefabricated modules, according to the firm. All renderings and drawings courtesy Office of Charles F. Bloszies FAIA

A novel solution to homelessness will open soon in Redwood City, Calif. The San Mateo County Navigation Center is a compact residential campus that employs modular units to create individual sleeping units, most with private bathrooms. The 240 units of housing will be accompanied by shared services and community spaces. Instead of the congregate dorm-style shelters found in many U.S. cities, this approach gives each resident a private, lockable, conditioned sleeping space.

The project's architect, Charles F. Bloszies, FAIA, calls the design concept the "Step1” interim supportive housing system. “This idea is novel, but not experimental,” he says. “It stems from listening to unhoused people themselves and the social service providers who have devoted their careers to taking on one of society’s most intractable problems: homelessness.”

Metrics from studies by social service groups, including Menlo Park-based LifeMoves, operator of the facility, show this type of supportive setting works very well, with average resident stays of three to six months. The project has been developed and managed by the San Mateo County Project Development Unit (PDU) under a design-build contract employed for all construction undertaken by the county.

Step1 supportive housing concept

According to San Mateo County’s last count, over 1,500 people there are homeless. Redwood City determined that in early 2022 over 100 unhoused people lived in 25 encampments. About half of those unhoused people told city officials they became homeless during the pandemic.

The new Redwood City solution is hailed as “revolutionary” by County Executive Officer Michael Callagy, who said, “This will change the face of homelessness in our county. This is a tremendous opportunity to help our entire community by ensuring that every homeless individual who wants shelter can find it and is treated with dignity and respect. These are real people with real issues and these funds will change lives.

For a prior 100-unit project in Mountain View, Calif., also designed by the Office of Charles F. Bloszies, FAIA, Gov. Gavin Newsom said it “is exactly the kind of project that needs to be replicated, using modular prefabricated buildings that can be stood up at blazing fast speeds and at a fraction of the cost of normal housing.”

On the project team: 
Owner and/or developer: San Mateo County Project Development Unit (PDU)
Design architect: the Office of Charles F. Bloszies FAIA
Architect of record: the Office of Charles F. Bloszies FAIA
MEP engineer: Meyers+ Engineers (design)
Structural engineer: the Office of Charles F. Bloszies FAIA
General contractor/construction manager:  XL Construction
Modular subcontractor/vendor: Silver Creek Industries

The San Mateo County Navigation Center represents the first built instance of the Office of Charles F. Bloszies’s “Step1” interim supportive housing system

The San Mateo County Navigation Center represents the first built instance of the Office of Charles F. Bloszies’s “Step1” interim supportive housing system

The San Mateo County Navigation Center represents the first built instance of the Office of Charles F. Bloszies’s “Step1” interim supportive housing system

The San Mateo County Navigation Center represents the first built instance of the Office of Charles F. Bloszies’s “Step1” interim supportive housing system

The San Mateo County Navigation Center represents the first built instance of the Office of Charles F. Bloszies’s “Step1” interim supportive housing system

Related Stories

Multifamily Housing | Jul 23, 2019

Is prefab in your future?

The most important benefit of offsite construction, when done right, is reliability.

Multifamily Housing | Jul 17, 2019

What multifamily developers are saying about Ori Living's robotic interior system

This robotically controlled, space-saving furniture system can add more than 100 square feet of usable space to apartment units.

Multifamily Housing | Jul 17, 2019

Robotic interiors: How to make a studio apartment feel as big as a one-bedroom unit

Meet Ori Living's robotically controlled, space-saving furniture system. 

Multifamily Housing | Jul 17, 2019

Cost of living: Apartment construction costs for 2019

Using RSMeans data from Gordian, here are the most recent construction costs for low-rise and mid-rise apartment buildings across 10 U.S. cities.

Multifamily Housing | Jul 15, 2019

Call for entries: Student housing roundup

We're looking for the best new "student housing" communities for our Fall Issue of Multifamily Design+Construction.

Multifamily Housing | Jul 15, 2019

7 new multifamily developments to track this summer

Ballpark living in Anaheim, Calif., and a water-friendly apartment complex in Seattle highlight the noteworthy multifamily developments to open in 2019. 

Multifamily Housing | Jun 27, 2019

David Baker Architects wins 2019 HUD 'best in affordable housing' honor

The firm's Williams Terrace project is the first dedicated housing for Charleston, S.C.’s low-income seniors. It's one of four developments to win 2019 AIA/HUD housing awards. 

Building Tech | Jun 26, 2019

Modular construction can deliver projects 50% faster

Modular construction can deliver projects 20% to 50% faster than traditional methods and drastically reshape how buildings are delivered, according to a new report from McKinsey & Co.

Design Innovation Report | Jun 25, 2019

2019 Design Innovation Report: Super labs, dream cabins, office boardwalks, façades as art

9 projects that push the limits of architectural design, space planning, and material innovation.

Multifamily Housing | Jun 25, 2019

Historic New York hospital becomes multifamily development

CetraRuddy designed the project and Delshah Capital is the developer.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021