Taco Bell Defy, an innovative new Taco Bell restaurant design that will “defy norms and define the future,” is set to break ground in Brooklyn Park, Minn., later this year.
The 3,000-sf, two-story restaurant concept features a first-of-its-kind Vertical Works-licensed design with a footprint that will be smaller than or equal to existing store footprints but have the ability to serve more customers. The project will reimagine the traditional drive-thru experience to create a new, contactless pickup experience that will be the fastest way ever to get Taco Bell.
The new drive-thru experience will feature four lanes, three of which are dedicated to mobile or delivery order pickups for customers who order through the Taco Bell app and third-party delivery services. The three lanes will supplement one traditional lane to ease the flow of traffic and ensure the speedy experience.
SEE ALSO: Chick-fil-A introduces modular building program for rebuilding and remodeling existing restaurants
Digital check-in screens will allow mobile order customers to scan in their order via a unique QR code. Customers can then pull forward to receive their food courtesy of a proprietary lift system that integrates two-way audio and video technology so customers can interact directly with the team members above in real time. This elevated kitchen design will optimize and streamline operations for the benefit of both team members and customers.
In addition to Vertical Works, Taco Bell Defy is also made possible by Border Foods, one of the largest privately held Taco Bell franchisees in America. Taco Bell Defy is slated to open to the public by summer 2022.
Related Stories
| Feb 8, 2012
Mega-malls expanding internationally
Historically, malls have always been the icons of America – the first mall ever was built in Minneapolis in 1956.
| Jan 15, 2012
Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.
The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.
| Jan 6, 2012
New Walgreen's represents an architectural departure
The structure's exterior is a major departure from the corporate image of a traditional Walgreens design.
| Jan 6, 2012
Summit Design+Build completes Park Place in Illinois
Summit was responsible for the complete gut and renovation of the former auto repair shop which required the partial demolition of the existing building, while maintaining the integrity of the original 100 year-old structure, and significant re-grading and landscaping of the site.
| Nov 29, 2011
Suffolk Construction breaks ground on Boston residential tower
Millennium Place III is a $220 million, 256-unit development that will occupy a full city block in Boston’s Downtown Crossing.
| Nov 29, 2011
Report finds credit crunch accounts for 20% of nation’s stalled projects
Persistent financing crunch continues to plague design and construction sector.
| Nov 22, 2011
Jones Lang LaSalle completes construction of two new stores in Manhattan
Firm creates new global design standard serving as project manager for Uniglo’s 89,000-sf flagship location and, 64,000-sf store.
| Oct 26, 2011
Shawmut Design and Construction awarded Tag Heuer build in Aventura, Fla.
New store features 1,200 sf fit out at Aventura Mall.
| Oct 3, 2011
Magellan Development Group opens Village Market in Chicago’s Lakeshore East neighborhood
Magellan Development Group and Hanwha Engineering & Construction are joint-venture development partners on the project. The Village Market was designed for Silver LEED certification by Loewenberg Architects and built by McHugh Construction.