flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Tallest tower in Miami to begin construction in January 2019

Mixed-Use

Tallest tower in Miami to begin construction in January 2019

The tower will reach a height of 1,049 feet, the maximum height permitted by the FAA in Miami.


By David Malone, Associate Editor | February 27, 2017

Rendering courtesy of ODP Architects

One Bayfront Plaza, a mixed-use development overlooking Biscayne Bay and comprising over 3 million sf, has been given the tentative date of January 2019 for construction to begin.

The tower, which will rise to the maximum height allotted by the FAA in Miami of 1,049 feet, will provide, 532,000 sf of Class A office space, 200,000 sf of retail on the bottom floors, a 200-room luxury convention hotel, and 1,052 apartment units. The amount of apartments and the space available for retail were both upwardly revised by Tibor Hollo, the founder of Florida East Coast Realty, the project’s developer, in an interview with Miami Today, according to TheNextMiami.com. Originally, the project called for 902 residences and 103,959 sf of retail space.

The office space will take its design cues from New York City buildings and provide columnless, open floor plans. The retail aspect will feature three pool decks and a green roof and will also include a pedestrian bridge that connects to the Bayfront Park Metro Mover Station.

The tower will make use 95 stories to reach the maximum height of 1,049 feet and will become the tallest tower in Miami. The project is expected to take a little over three years to complete, giving it an approximate completion date of mid-year 2022. Kohn Pedersen Fox Associates is the design architect and ODP Architects is the architect of record.

 

Rendering courtesy of ODP Architects.

 

Rendering courtesy of ODP Architects.

 

Rendering courtesy of ODP Architects.

Related Stories

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 23, 2012

Summit Design+Build selected as GC for Chicago restaurant

Little Goat will truly be a multifunctional space.  Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.

| Apr 30, 2012

HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project

HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.

| Apr 20, 2012

Shawmut completes Yard House Restaurant in Boston

12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.

| Apr 6, 2012

Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning

The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.

| Apr 4, 2012

JCJ Architecture designs New York City's first casino

Aqueduct Racetrack complex transformed into modern entertainment destination.

| Apr 3, 2012

Luxury hotel 'groundscraper' planned in abandoned quarry

Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.

| Mar 16, 2012

Temporary fix to CityCenter's Harmon would cost $2 million, contractor says

By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021