flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Tallest tower in Miami to begin construction in January 2019

Mixed-Use

Tallest tower in Miami to begin construction in January 2019

The tower will reach a height of 1,049 feet, the maximum height permitted by the FAA in Miami.


By David Malone, Associate Editor | February 27, 2017

Rendering courtesy of ODP Architects

One Bayfront Plaza, a mixed-use development overlooking Biscayne Bay and comprising over 3 million sf, has been given the tentative date of January 2019 for construction to begin.

The tower, which will rise to the maximum height allotted by the FAA in Miami of 1,049 feet, will provide, 532,000 sf of Class A office space, 200,000 sf of retail on the bottom floors, a 200-room luxury convention hotel, and 1,052 apartment units. The amount of apartments and the space available for retail were both upwardly revised by Tibor Hollo, the founder of Florida East Coast Realty, the project’s developer, in an interview with Miami Today, according to TheNextMiami.com. Originally, the project called for 902 residences and 103,959 sf of retail space.

The office space will take its design cues from New York City buildings and provide columnless, open floor plans. The retail aspect will feature three pool decks and a green roof and will also include a pedestrian bridge that connects to the Bayfront Park Metro Mover Station.

The tower will make use 95 stories to reach the maximum height of 1,049 feet and will become the tallest tower in Miami. The project is expected to take a little over three years to complete, giving it an approximate completion date of mid-year 2022. Kohn Pedersen Fox Associates is the design architect and ODP Architects is the architect of record.

 

Rendering courtesy of ODP Architects.

 

Rendering courtesy of ODP Architects.

 

Rendering courtesy of ODP Architects.

Related Stories

| Jan 15, 2012

Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.

The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.

| Dec 27, 2011

Ground broken for adaptive reuse project

Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.

| Dec 19, 2011

Chicago’s Aqua Tower wins international design award

Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.

| Dec 12, 2011

Mojo Stumer takes top honors at AIA Long Island Design Awards

Firm's TriBeCa Loft wins "Archi" for interior design.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 3, 2011

Hardin Construction tops out Orlando Embassy Suites

The project began in April 2011 and is expected to open in fall 2012.

| Sep 30, 2011

Kilbourn joins Perkins Eastman

Kilbourn joins with more than 28 years of design and planning experience for communities, buildings, and interiors in hospitality, retail/mixed-use, corporate office, and healthcare.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021