flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Tech school designed to prepare students for high-wage, high-skill careers

Projects

Tech school designed to prepare students for high-wage, high-skill careers

A Florida high school gets a space whose design serves its disciplines.


By Novid Parsi, Contributing Editor | March 31, 2022
KRAI ext
KRAI is not supposed to look like any other school you have seen before.

In Wesley Chapel, Fla., a half-hour north of Tampa, Kirkland Ranch Academy of Innovation (KRAI) is “not going to look like anything you’ve ever seen before,” Kim Moore, assistant superintendent at Pasco County Schools, said in a statement. “This is going to be a cool school.”

Set to open for the 2022-23 school year, the 180,000-square-foot building will focus on Career and Technical Education (CTE), preparing students for high-wage, high-skill, and high-demand careers. It will offer hands-on, interactive learning that teaches skills more than theory—equipping students with the competencies they need to transition from high school to careers or college.

KRAI ext 2
The school is set to open for the 2022-2023 school year.

The purpose-built CTE high school will enroll more than 1,000 students, studying disciplines ranging from digital technology and engineering to biomedical science, cybersecurity, building construction, robotics, and more. Like the high-tech interdisciplinary buildings found on university campuses, KRAI is designed to fuel innovation, entrepreneurship, and career preparedness.

KRAI’s modern architecture and cantilevered entry canopy—hovering atop two simple columns—nod to the building sciences field, one of the school’s study areas. In addition to an open-air interior courtyard, the building will feature bridges, stairways, seating, and informal gathering areas—including a stage—that encourage incidental meetings and gatherings.

Every space is engineered to foster community and collaboration. A two-story collaboration hub, for instance, will include flexible furniture to support large gatherings and smaller-scale collaborations among students and outside partners. Like every space in the building, it will be bright, open, and reconfigurable.

KRAI ext 3
The space is meant to foster collaboration and community.

Each CTE classroom is designed to function as a makerspace, filled with professional-grade equipment, technology, and tools. These malleable spaces can change as career demands evolve.

CTE classroom
CTE classroom is a makerspace.

TRAI ext 3

Owner/developer: Pasco County Schools

Design architect: CannonDesign

Architect of record: Hepner Architects

MEP engineer: Engineering Matrix 

Structural engineer: DeCaroWillson

General contractor/construction manager: Creative Contractors

Related Stories

| May 1, 2013

World’s tallest children’s hospital pushes BIM to the extreme

The Building Team for the 23-story Lurie Children’s Hospital in Chicago implements an integrated BIM/VDC workflow to execute a complex vertical program.

| Apr 22, 2013

Top 10 green building projects for 2013 [slideshow]

The AIA's Committee on the Environment selected its top ten examples of sustainable architecture and green design solutions that protect and enhance the environment.

| Feb 28, 2013

Greeening Silicon Valley: Samsung's new 1.1 million-sf HQ

Samsung Electronics' new 1.1 million sf San Jose campus will support at least 2,500 sales and R&D staff in the company's semiconductor and display businesses.

| Feb 27, 2013

Bronx residents get LEED Platinum public housing complex, rooftop farm

The New York City Housing Authority has opened Arbor House, a 124-unit LEED Platinum complex in the Morrisania neighborhood of the Bronx.

| Feb 22, 2013

Starbucks pilot program rolls out small, modular stores

Coffee giant Starbucks is rolling out mini-stores with maximum local flavor, as part of an international pilot program.

| Oct 23, 2012

Transwestern to develop industrial complex in Houston’s Energy Corridor

Transwestern, a commercial real estate firm, has acquired 30 acres in Houston’s Energy Corridor for a 384,900-sf industrial project, the company announced.

| Jul 25, 2012

Contract awarded for Gaillard Municipal Auditorium renovations in Charleston, S.C.

Seeking LEED Silver certification, the project will begin in August and is slated for completion in December 2014.

| Jul 24, 2012

Dragon Valley Retail at epicenter of Yongsan International Business District

Masterplanned by architect Daniel Libeskind, the Yongsan IBD encompasses ten city blocks and includes a collection of high-rise residences and commercial buildings.

| Jul 24, 2012

$20 Million expansion at New Orleans casino announced

150-room hotel project to include suites, fitness center, and meeting space.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021