TOP 55 ENGINEERING COMPANIES |
||
Rank | Firm | 2015 Revenue |
1 | WSP | Parsons Brinckerhoff | $507,779,000 |
2 | Fluor Corp. | $234,170,000 |
3 | Arup | $170,601,562 |
4 | Jensen Hughes | $126,307,878 |
5 | KJWW / TTG | $121,000,000 |
6 | Vanderweil Engineers | $110,028,000 |
7 | Syska Hennessy Group | $99,432,587 |
8 | Henderson Engineers | $94,551,747 |
9 | Simpson Gumpertz & Heger | $83,125,000 |
10 | Walter P Moore | $72,264,662 |
11 | BR+A Consulting Engineers | $61,000,000 |
12 | Smith Seckman Reid | $59,586,203 |
13 | Environmental Systems Design | $52,394,670 |
14 | ME Engineers | $51,400,000 |
15 | Magnusson Klemencic Associates | $49,483,828 |
16 | TLC Engineering for Architecture | $47,855,690 |
17 | Glumac | $47,014,670 |
18 | DeSimone Consulting Engineers | $44,112,915 |
19 | Mazzetti | $37,140,683 |
20 | Coffman Engineers | $35,436,712 |
21 | Interface Engineering | $34,242,040 |
22 | RDK Engineers | $31,646,583 |
23 | I. C. Thomasson Associates | $31,100,000 |
24 | JBA Consulting Engineers | $29,307,908 |
25 | ThermalTech Engineering | $28,900,000 |
26 | Heapy Engineering | $26,580,153 |
27 | Newcomb & Boyd | $24,172,156 |
28 | Bala Consulting Engineers | $23,500,000 |
29 | M/E Engineering | $23,442,000 |
30 | H.F. Lenz Company | $23,283,392 |
31 | Loring Consulting Engineers | $23,000,000 |
32 | Dunham Associates | $22,050,000 |
33 | P2S Engineering | $20,318,446 |
34 | Bridgers & Paxton Consulting Engineers | $19,475,834 |
35 | KLH Engineers | $17,838,026 |
36 | Robins & Morton | $17,540,000 |
37 | Cardno Haynes Whaley | $17,284,271 |
38 | Wallace Engineering | $17,000,000 |
39 | Spectrum Engineers | $15,596,896 |
40 | Karpinski Engineering | $14,448,500 |
41 | CJL Engineering, Inc. | $14,261,252 |
42 | Peter Basso Associates | $14,005,342 |
43 | Global Engineering Solutions | $13,100,000 |
44 | GHT Limited | $12,810,000 |
45 | Allen & Shariff Corp. | $11,052,241 |
46 | JQ Engineering | $10,632,000 |
47 | Zak Companies | $8,915,552 |
48 | Baird, Hampton & Brown | $8,591,793 |
49 | Wick Fisher White | $7,777,200 |
50 | dbHMS | $7,680,000 |
51 | OLA Consulting Engineers | $6,872,851 |
52 | Kamm Consulting | $6,600,763 |
53 | William Tao & Associates | $6,307,788 |
54 | Leidos | $5,707,000 |
55 | G & W Engineering Corp. | $5,001,286 |
56 | Architectural Engineers | $3,235,745 |
57 | KCL Engineering | $2,570,959 |
58 | Yates Companies, The | $300,000 |
RETURN TO THE GIANTS 300 LANDING PAGE
Related Stories
| Aug 11, 2010
PBK, DLR Group among nation's largest K-12 school design firms, according to BD+C's Giants 300 report
A ranking of the Top 75 K-12 School Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
Turner Building Cost Index dips nearly 4% in second quarter 2009
Turner Construction Company announced that the second quarter 2009 Turner Building Cost Index, which measures nonresidential building construction costs in the U.S., has decreased 3.35% from the first quarter 2009 and is 8.92% lower than its peak in the second quarter of 2008. The Turner Building Cost Index number for second quarter 2009 is 837.
| Aug 11, 2010
AGC unveils comprehensive plan to revive the construction industry
The Associated General Contractors of America unveiled a new plan today designed to revive the nation’s construction industry. The plan, “Build Now for the Future: A Blueprint for Economic Growth,” is designed to reverse predictions that construction activity will continue to shrink through 2010, crippling broader economic growth.
| Aug 11, 2010
Section Eight Design wins 2009 Open Architecture Challenge for classroom design
Victor, Idaho-based Section Eight Design beat out seven other finalists to win the 2009 Open Architecture Challenge: Classroom, spearheaded by the Open Architecture Network. Section Eight partnered with Teton Valley Community School (TVCS) in Victor to design the classroom of the future. Currently based out of a remodeled house, students at Teton Valley Community School are now one step closer to getting a real classroom.
| Aug 11, 2010
High-profit design firms invest in in-house training
Forty-three percent of high-profit architecture, engineering, and environmental consulting firms have in-house training staff, according to a study by ZweigWhite. The 2008-2009 Successful Firm Survey reports that only 36% of firms overall have in-house training staff. In addition, 52% of high-profit firms use an online training system or service.
| Aug 11, 2010
Help Wanted: Architect for $100 million 'Discovery Park' in Union City, Tennessee
The Robert E. and Jenny D. Kirkland Foundation is identifying architects interested in designing a 50-acre, multi-million dollar complex in Union City, TN. Discovery Park of America will be a world-class, multi-faceted venue presenting exhibits and interactive experiences about history, nature, art, and science.