Toronto developers Mattamy Homes and QuadReal Property Group have launched The Clove, the first phase in the Cloverdale, a $6 billion multi-tower development. The project will transform Cloverdale Mall, a 32-acre shopping center in Toronto, into a mixed-use urban neighborhood.
The project’s flagship development, The Clove, will include a 33-story tower and an adjoining nine-story midrise building with a total of more than 600 condos ranging from studios to three-bedroom units.
The Clove’s design by Giannone Petricone Associates, which also led the design of the Cloverdale master plan, aims to evoke movement and a connection with the outdoors. The sense of movement will be emphasized by fluttering, horizontal bands. The Clove will appear either to step down or climb up, depending on the viewer’s perspective. Its cascading terraces will overlook the new Cloverdale development.
“The team has worked hard to design a tower that will serve as a gateway to the rest of the development, while offering a striking presence on Toronto’s west-end skyline,” Niall Haggart, president, GTA Urban Division, Mattamy Homes, said in a statement.
During the extensive public engagement process, QuadReal gathered feedback from more than 15,000 local constituents. As a result of the feedback, the developers will ensure the shopping center’s services and amenities remain in operation throughout the project. For example, a grocery store will reopen in the new space the day its existing site closes.
When complete, the Cloverdale will feature new retail, residential, and green spaces. The development will provide more than 5,000 condo and rental units, over 180,000 sf of retail space, and over 20,000 sf of community amenities, in addition to over nine acres of public space including two parks.
Cloverdale Mall was built in 1956 as an open-air plaza with a central pedestrian promenade. It was expanded and converted to an enclosed mall in the 1980s and renovated in 2006. The new development will focus on sustainable design as well as integration with transit and the surrounding neighborhood.
On the Building Team:
Developers: Mattamy Homes and QuadReal Property Group for The Clove; QuadReal for the Cloverdale master plan
Design architect: Giannone Petricone Associates for The Clove and the Cloverdale master plan
Architect of record: Turner Fleischer
MEP engineer: Smith + Andersen
Structural engineer: Read Jones Christoffersen Ltd.
Construction manager: Mattamy Homes
Related Stories
Hotel Facilities | Apr 29, 2015
OMA unveils design for the Netherlands' largest hotel
Once completed, and if approved, the structure will add three stacked cubes to the Amsterdam skyline.
High-rise Construction | Apr 23, 2015
Size matters in NYC, where several projects vie for the city’s tallest building honor
The latest renderings of 217 West 57th Street show a tower that would rise higher than the World Trade Center’s pinnacle, when elevations are included.
High-rise Construction | Apr 22, 2015
Architects propose sustainable ‘vertical city’ in the Sahara
Designers aim to make the 1,476-foot tower sustainable, relying on rainwater collection, solar power, and geothermal energy.
Hotel Facilities | Apr 13, 2015
Figure-eight shaped hotel to open around PyeongChang 2018 Winter Olympics Facility
Just three miles away from the Olympic stadiums, the hotel will be a hub of its own.
Mixed-Use | Apr 7, 2015
$100 billion 'city from scratch' taking shape in Saudi Arabia
The new King Abdullah Economic City was conceived to diversify the kingdom's oil-dependent economy by focusing more in its shipping industry.
High-rise Construction | Mar 24, 2015
Timber high-rise residential complex will tower over Stockholm waterfront
The four towers, 20 stories each, will be made entirely out of Swedish pine, from frame to façade.
Mixed-Use | Mar 13, 2015
Dubai announces mega waterfront development Aladdin City
Planned on 4,000 acres in the Dubai Creek area, the towers will be covered in gold lattice and connected via air-conditioned bridges.
High-rise Construction | Mar 11, 2015
Must see: Firm proposes skyscraper with a ‘twist’ in downtown Tulsa
Tulsa, Okla.-based architecture practice Kinslow, Keith & Todd released renderings of a skyscraper concept that takes the shape of a tornado.
Modular Building | Mar 10, 2015
Must see: 57-story modular skyscraper was completed in 19 days
After erecting the mega prefab tower in Changsha, China, modular builder BSB stated, “three floors in a day is China’s new normal.”
Transit Facilities | Mar 4, 2015
5+design looks to mountains for Chinese transport hub design
The complex, Diamond Hill, will feature sloping rooflines and a mountain-like silhouette inspired by traditional Chinese landscape paintings.