Toronto developers Mattamy Homes and QuadReal Property Group have launched The Clove, the first phase in the Cloverdale, a $6 billion multi-tower development. The project will transform Cloverdale Mall, a 32-acre shopping center in Toronto, into a mixed-use urban neighborhood.
The project’s flagship development, The Clove, will include a 33-story tower and an adjoining nine-story midrise building with a total of more than 600 condos ranging from studios to three-bedroom units.
The Clove’s design by Giannone Petricone Associates, which also led the design of the Cloverdale master plan, aims to evoke movement and a connection with the outdoors. The sense of movement will be emphasized by fluttering, horizontal bands. The Clove will appear either to step down or climb up, depending on the viewer’s perspective. Its cascading terraces will overlook the new Cloverdale development.
“The team has worked hard to design a tower that will serve as a gateway to the rest of the development, while offering a striking presence on Toronto’s west-end skyline,” Niall Haggart, president, GTA Urban Division, Mattamy Homes, said in a statement.
During the extensive public engagement process, QuadReal gathered feedback from more than 15,000 local constituents. As a result of the feedback, the developers will ensure the shopping center’s services and amenities remain in operation throughout the project. For example, a grocery store will reopen in the new space the day its existing site closes.
When complete, the Cloverdale will feature new retail, residential, and green spaces. The development will provide more than 5,000 condo and rental units, over 180,000 sf of retail space, and over 20,000 sf of community amenities, in addition to over nine acres of public space including two parks.
Cloverdale Mall was built in 1956 as an open-air plaza with a central pedestrian promenade. It was expanded and converted to an enclosed mall in the 1980s and renovated in 2006. The new development will focus on sustainable design as well as integration with transit and the surrounding neighborhood.
On the Building Team:
Developers: Mattamy Homes and QuadReal Property Group for The Clove; QuadReal for the Cloverdale master plan
Design architect: Giannone Petricone Associates for The Clove and the Cloverdale master plan
Architect of record: Turner Fleischer
MEP engineer: Smith + Andersen
Structural engineer: Read Jones Christoffersen Ltd.
Construction manager: Mattamy Homes
Related Stories
High-rise Construction | Jul 7, 2015
Bjarke Ingels designs Frankfurt skyscraper with a surprise in the middle
Several levels in the center of the 185-meter tower are shifted outward to allow for terraces with city views.
Cultural Facilities | Jun 10, 2015
Artists turn oil tankers into architecture
Four Dutch artists propose transforming tankers into monuments with mixed-use space.
Wood | Jun 2, 2015
Michael Green Architecture designs world's tallest wood building for Paris competition
“Just as Gustave Eiffel shattered our conception of what was possible a century and a half ago, this project can push the envelope of wood innovation with France in the forefront," said architect Michael Green of the project.
Smart Buildings | May 28, 2015
4 ways cold-climate cities can make the most of their waterfronts
Though cold-climate cities pose a unique challenge for waterfront development, with effective planning waterfront cities with freezing winter months can still take advantage of the spaces year-round.
Sponsored | Coatings | May 14, 2015
Prismatic coatings accent the new Altara Center
This multi-use campus will contain a university, sports facilities, medical center, and world-class shopping
Mixed-Use | May 10, 2015
Construction on Orlando’s massive ‘innovation hub’ is finally starting
The $1 billion Creative Village development will create a business and education hub.
High-rise Construction | May 6, 2015
Two new designs submitted for New York City Riverside Center
Both designs reference the cantilevers and other elements featured in architect Christian de Portzamparc’s original masterplan for the complex, which has now been scrapped.
Building Owners | May 6, 2015
Hackathons and RFCs: Why one developer killed the RFP
In lieu of an RFP process, Skanska Commercial Development hosted a three-week "hackathon" to find an architect for its 2&U tower in Seattle.
Mixed-Use | May 5, 2015
Miami ‘innovation district’ will have 6.5 million sf of dense, walkable space
Designing a neighborhood from the ground-up, developers aim to create a dense, walkable district that fulfills what is lacking from Miami’s current auto-dependent layout.
Hotel Facilities | Apr 30, 2015
Atlanta Braves partner with Omni Hotels & Resorts to build hotel near new Suntrust Park
The Omni Atlanta Northwest Hotel will feature 16 floors with 260 guest rooms and suites, rooftop hospitality suites, 12,500 sf of meeting space, a signature restaurant, and an elevated pool deck and bar overlooking the plaza and ballpark.