A new hospital in Ontario will nearly triple the care capacity of its existing facility—becoming the largest hospital in Canada.
In Mississauga, a suburb of Toronto, hospital system Trillium Health Partners (THP) will fully replace its Mississauga Hospital with a new facility that will increase the number of operating rooms from 14 to 23 and include more than 950 beds. At approximately 2.8 million square feet and 24 floors, the new Mississauga Hospital will feature modern hospital facilities and technology and reflect the latest standards in infection prevention and control.
THP’s emergency department, one of the busiest in Canada, will significantly expand to improve patient experience and reduce wait times. The hospital will house advanced diagnostic imaging facilities and a new pharmacy and clinical laboratory. And it will continue to deliver specialized care through regional programs, such as the regional center for advanced cardiac surgery and neurosurgery services, among others.
With design and engineering services by global integrated design firm Stantec, the new Mississauga Hospital will be a critical part of THP’s plan to provide healthcare that serves the growing community for decades to come.
“Critical health infrastructure, like Trillium Health Partners’ Mississauga site, are essential to advance quality healthcare in Ontario and keep our diverse communities healthy,” Suzanne Crysdale, Stantec principal, says in a statement.
Mississauga Hospital marks the second Stantec project for THP. In December, Stantec announced it will provide design and engineering services for a nine-floor, 600,000-square-foot patient tower with over 350 beds.
In recent years, Stantec has designed several major healthcare projects in Ontario, including Cortellucci Vaughan Hospital’s 1.2 million-square-foot facility; Cambridge Memorial Hospital’s patient care wing; Brockville General Hospital’s complex for continuing care, mental health, and rehabilitation; and Centre for Addiction and Mental Health’s redevelopment project.
Related Stories
| May 1, 2013
World’s tallest children’s hospital pushes BIM to the extreme
The Building Team for the 23-story Lurie Children’s Hospital in Chicago implements an integrated BIM/VDC workflow to execute a complex vertical program.
| Apr 22, 2013
Top 10 green building projects for 2013 [slideshow]
The AIA's Committee on the Environment selected its top ten examples of sustainable architecture and green design solutions that protect and enhance the environment.
| Feb 28, 2013
Greeening Silicon Valley: Samsung's new 1.1 million-sf HQ
Samsung Electronics' new 1.1 million sf San Jose campus will support at least 2,500 sales and R&D staff in the company's semiconductor and display businesses.
| Feb 27, 2013
Bronx residents get LEED Platinum public housing complex, rooftop farm
The New York City Housing Authority has opened Arbor House, a 124-unit LEED Platinum complex in the Morrisania neighborhood of the Bronx.
| Feb 22, 2013
Starbucks pilot program rolls out small, modular stores
Coffee giant Starbucks is rolling out mini-stores with maximum local flavor, as part of an international pilot program.
| Oct 23, 2012
Transwestern to develop industrial complex in Houston’s Energy Corridor
Transwestern, a commercial real estate firm, has acquired 30 acres in Houston’s Energy Corridor for a 384,900-sf industrial project, the company announced.
| Jul 25, 2012
Contract awarded for Gaillard Municipal Auditorium renovations in Charleston, S.C.
Seeking LEED Silver certification, the project will begin in August and is slated for completion in December 2014.
| Jul 24, 2012
Dragon Valley Retail at epicenter of Yongsan International Business District
Masterplanned by architect Daniel Libeskind, the Yongsan IBD encompasses ten city blocks and includes a collection of high-rise residences and commercial buildings.
| Jul 24, 2012
$20 Million expansion at New Orleans casino announced
150-room hotel project to include suites, fitness center, and meeting space.