Tremco Commercial Sealants & Waterproofing has unveiled its new state-of-the-art, fully automated Sustainable Building Solutions Test Facility.
The facility is designed for controlled testing of air and moisture infiltration/exfiltration in air barrier systems and building enclosures. Such penetrations lead to energy loss, structural deterioration, and poor indoor air quality. Developed in collaboration with the Air Barrier Association of America (ABAA) and working in conjunction with building scientists at Oak Ridge National Laboratory (ORNL), the Sustainable Building Solutions Test Facility is a technically advanced and fully automated laboratory designed to measure energy loss and sustainability of the built environment.
“This test facility is a testament to Tremco’s commitment to the sustainability of the built environment,” said Chuck Houk, president of Tremco Commercial Sealants & Waterproofing. “Most building envelope problems are moisture-related, either caused by air leakage or exterior moisture penetration. The testing done at this facility will help to ensure building materials are performing at optimal levels and eliminate some of the trial and error as well as risk associated with building design and construction.”
Components tested at the facility will be exposed to different levels of wind conditioning and moisture to determine resistance to specific elements, including rain, high winds, and other environmental conditions. Specifically the facility will conduct ASTM E2357, E283, and E331 tests. It will do so using 300 to 400 channels for simultaneous data control, precise measurement devices, and infrared photography.
In addition to testing air barrier assemblies, the facility has the capability to test the following connection points between air/vapor building protection systems to assure continuity throughout the building enclosure:
- Roof-to-wall tie-ins
- Foundation-to-wall tie-ins
- Corners
- Window-to-wall interfaces
- Penetrations
Related Stories
| Dec 5, 2011
Summit Design+Build begins renovation of Chicago’s Esquire Theatre
The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.
| Dec 5, 2011
Fraser Brown MacKenna wins Green Gown Award
Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building.
| Dec 5, 2011
Gables Residential brings mixed-use building to Houston's Tanglewood area
The design integrates a detailed brick and masonry facade, acknowledging the soft pastel color palette of the surrounding Mediterranean heritage of Tanglewood.
| Dec 2, 2011
What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20
Nominate a colleague, peer, or even yourself. Applications available here.
| Nov 29, 2011
First EPD awarded to exterior roof and wall products manufacturer
EPD is a standardized, internationally recognized tool for providing information on a product’s environmental impact.
| Nov 29, 2011
Suffolk Construction breaks ground on Boston residential tower
Millennium Place III is a $220 million, 256-unit development that will occupy a full city block in Boston’s Downtown Crossing.
| Nov 28, 2011
Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.
Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.