flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Tremco Commercial Sealants & Waterproofing Unveils Sustainable Building Solutions Test Facility

Tremco Commercial Sealants & Waterproofing Unveils Sustainable Building Solutions Test Facility

State-of-the-art facility provides a controlled testing environment of air and moisture infiltration/exfiltration in air barrier systems and building enclosures


By Posted by Raissa Rocha, Associate Editor | June 18, 2012

Tremco Commercial Sealants & Waterproofing has unveiled its new state-of-the-art, fully automated Sustainable Building Solutions Test Facility.

The facility is designed for controlled testing of air and moisture infiltration/exfiltration in air barrier systems and building enclosures. Such penetrations lead to energy loss, structural deterioration, and poor indoor air quality. Developed in collaboration with the Air Barrier Association of America (ABAA) and working in conjunction with building scientists at Oak Ridge National Laboratory (ORNL), the Sustainable Building Solutions Test Facility is a technically advanced and fully automated laboratory designed to measure energy loss and sustainability of the built environment.

“This test facility is a testament to Tremco’s commitment to the sustainability of the built environment,” said Chuck Houk, president of Tremco Commercial Sealants & Waterproofing. “Most building envelope problems are moisture-related, either caused by air leakage or exterior moisture penetration. The testing done at this facility will help to ensure building materials are performing at optimal levels and eliminate some of the trial and error as well as risk associated with building design and construction.”

Components tested at the facility will be exposed to different levels of wind conditioning and moisture to determine resistance to specific elements, including rain, high winds, and other environmental conditions. Specifically the facility will conduct ASTM E2357, E283, and E331 tests. It will do so using 300 to 400 channels for simultaneous data control, precise measurement devices, and infrared photography.

In addition to testing air barrier assemblies, the facility has the capability to test the following connection points between air/vapor building protection systems to assure continuity throughout the building enclosure:

  • Roof-to-wall tie-ins
  • Foundation-to-wall tie-ins
  • Corners
  • Window-to-wall interfaces
  • Penetrations

Related Stories

| Apr 25, 2012

Thornton Tomasetti/Fore Solutions provides consulting for Biologics Support Center

Project receives LEED Gold Certification.

| Apr 23, 2012

Innovative engineering behind BIG’s Vancouver Tower

Buro Happold’s structural design supports the top-heavy, complex building in a high seismic zone; engineers are using BIM technology to design a concrete structure with post-tensioned walls.

| Apr 20, 2012

Registration open for Solar Power International 2012 in Orlando

President Bill Clinton to deliver keynote address at ?largest solar energy event in the Americas.

| Apr 19, 2012

KTGY Group’s Arista Uptown Apartments in Broomfield, Colo. completed

First of eight buildings highlights unique amenities.

| Mar 22, 2012

Hawaiian architecture firm chooses FRP trellis system over traditional materials

MGA Architecture plans to add five more trellis systems on the neighboring building. 

| Mar 6, 2012

EwingCole completes first design-build project for the USMA

The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.

| Feb 2, 2012

Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012

Winning projects will be featured in the May issue of BD+C. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â