flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Two residential towers break ground in Chicago’s Lakeshore East

High-rise Construction

Two residential towers break ground in Chicago’s Lakeshore East

bKL Architecture designed the towers.


By David Malone, Associate Editor | September 19, 2019
CIrrus condo tower entrance

All renderings courtesy Lendlease

Cirrus, a 47-story, 363-unit luxury condominium tower, and Cascade, an adjacent 37-story, 503-unit rental tower, recently broke ground in Chicago’s Lakeshore East community. The two towers, along with Cascade Park, a publicly accessible green space that will provide an activated connection to the lakefront and Chicago Riverwalk, are being developed simultaneously by Lendlease and Magellan Development Group.

Cirrus floor plans include one-, two-, three-, and four-bedroom layouts as well as two townhome residences at ground level and 15 penthouse residences, including one duplex, located on floors 42-47. Units will range in size from 650 sf to over 3,000 sf. All residences include floor-to-ceiling windows and kitchens with quartzite countertops, tile backsplashes, Bosch built-in recirculating hoods, and Franke stainless steel undermount sinks with disposal.

 

Cirrus condo towerCirrus Condominium Tower.

 

The Cirrus lobby features a wall of east-facing, floor-to-ceiling windows adjacent to a seating area and open, circular fireplace. The lobby connects to an outdoor terrace and separate pool deck with lounge seating, adjacent indoor wet lounge, cabanas, and transparent glass partitions. Other amenities include private workspaces and conference rooms, a social lounge with fireplace, and a conservatory overlooking Cascade Park. A wine cellar with tasting room, separate show and prep kitchens with a dining area and chef’s corner lounge, and an east-facing outdoor terrace with barbecue and fire pit on the 41st floor round out the building’s 48,000-sf of amenity space.

 

See Also: 2019 Multifamily Giants Report: Apartment construction keeps moving along, but affordable housing lags behind

 

Cirrus and Cascade shared indoor poolCirrus and Cascade shared indoor pool.

 

Residents of both Cirrus and Cascade will have access to an indoor lap pool, a heat therapy pool and splash pad, a children’s playroom, a fitness center with adjacent yoga/spin studio, an HIIT training area with locker rooms, massage and steam rooms, a game room with a golf simulator and billiards, a screening room, a music room, a multi-purpose community room, a dog-washing station, and an indoor dog run. Both towers will include deeded, below-grade parking spaces.

 

Cirrus and Cascade towersCirrus and Cascade towers.

 

Additionally, all residents will enjoy access to Cascade Park, a 0.8 acre green space designed by Claude Cormier + Associés. The park will slope down from Harbor Drive to the tower’s base, creating a new connection to the Lakefront Trail and Chicago Riverwalk.

Cirrus and Cascade are the first of three towers that Lendlease and Magellan plan to develop at the northeast corner of Lakeshore East. The first residences are scheduled to deliver in fall 2021.

 

Cirrus outdoor poolCirrus outdoor pool.

 

Cirrus social loungeCirrus social lounge.

 

Cirrus lobbyCirrus Tower lobby.

 

Two-bedroom two bath residenceTwo-bedroom/two-bath residence in Cirrus Tower.

Related Stories

High-rise Construction | Jun 5, 2015

Japanese policymakers discuss mandate for toilets in elevators

This quirky-sounding building code is a safety measure for the earthquake-prone nation.

Wood | Jun 2, 2015

Michael Green Architecture designs world's tallest wood building for Paris competition

“Just as Gustave Eiffel shattered our conception of what was possible a century and a half ago, this project can push the envelope of wood innovation with France in the forefront," said architect Michael Green of the project.  

High-rise Construction | May 6, 2015

Two new designs submitted for New York City Riverside Center

Both designs reference the cantilevers and other elements featured in architect Christian de Portzamparc’s original masterplan for the complex, which has now been scrapped.

High-rise Construction | May 6, 2015

Parks in the sky? Subterranean bike paths? Meet the livable city, designed in 3D

Today’s great cities must be resilient—and open—to many things, including the influx of humanity, writes Gensler co-CEO Andy Cohen. 

Building Owners | May 6, 2015

Hackathons and RFCs: Why one developer killed the RFP

In lieu of an RFP process, Skanska Commercial Development hosted a three-week "hackathon" to find an architect for its 2&U tower in Seattle.

High-rise Construction | Apr 30, 2015

World Trade Center developer looks to Bjarke Ingels for new tower design

Norman Foster’s design for 2 World Trade Center may be ousted, as developers are currently negotiating with Danish firm BIG to redesign the original scheme.

Hotel Facilities | Apr 29, 2015

OMA unveils design for the Netherlands' largest hotel

Once completed, and if approved, the structure will add three stacked cubes to the Amsterdam skyline.

Multifamily Housing | Apr 28, 2015

Mace and Make work on London's 40-story residential tower

The tower is one of six residential high-rises planned near London’s City Road, which is undergoing a mini construction boom.

High-rise Construction | Apr 23, 2015

Size matters in NYC, where several projects vie for the city’s tallest building honor

The latest renderings of 217 West 57th Street show a tower that would rise higher than the World Trade Center’s pinnacle, when elevations are included.

High-rise Construction | Apr 22, 2015

Architects propose sustainable ‘vertical city’ in the Sahara

Designers aim to make the 1,476-foot tower sustainable, relying on rainwater collection, solar power, and geothermal energy.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021