A design team consisting of Michael Van Valkenburgh Associates, Cooper Robertson, and James Carpenter Design Associates with Trivers Associates and Haley Sharpe Design won the international competition for the opportunity to expand and renovate the Eero Saarinen-designed Gateway Arch Museum in St. Louis.
The expanded Gateway Arch Museum, designed by Cooper Robertson and James Carpenter Design Associates, has a dramatic entrance and plaza that is nestled into the historic landscape. The design includes new public spaces, a great entry hall that leads to re-imagined exhibitions and the fully renovated original Saarinen building beneath the Arch.
Nearly 45,000 sf of new museum space has been added and over 100,000 sf of existing space has been reconfigured into new exhibition galleries, public education facilities, and visitor amenities. The new Gateway Arch Museum extends west towards downtown St. Louis with a new entrance and plaza that connects to the redesigned and expanded Luther Ely Smith Square, which now spans over a depressed interstate highway.
Rendering courtesy Cooper Robertson.
The museum’s public spaces and surroundings are fully integrated into the overall plan for the Dan Kiley-designed 91-acre Park. The Museum and Park now connect directly to the 1862 Old Courthouse in downtown St. Louis.
“The Museum design is fully integrated into the National Register-listed landscape,” says Cooper Robertson’s Scott Newman, in a release. “The new entrance is precisely inserted into the topography, allowing visitors to enter the building through the landscape rather than descending underground. As one enters, a luminous great hall is revealed with views deep into the Museum’s monumentally scaled exhibits below, elevating and enlivening the visitor experience, while respecting Dan Kiley’s original Park design.”
According to the Gateway Arch Park Foundation, the nonprofit group behind the project, one of the main goals of the renovation and expansion is to create closer and more robust connections between the Gateway Arch Museum, the landscape of the Jefferson National Expansion Memorial, and the city of St. Louis as a whole.
McCarthy Building Companies is the general contractor for the project.
The Museum will open to the public this year with an official dedication ceremony planned for July 2018.
UPdate
EarthCam has released a new time-lapse video showing the construction of the Gateway Arch Museum project. The one minute video shows the construction of the museum between February 2014 and March 2018.
Courtesy EarthCam.
Related Stories
AEC Tech Innovation | Jul 4, 2024
Caution competes with inevitability at conference exploring artificial intelligence for design and construction
Hosted by PSMJ, AEC Innovate in Boston found an AEC industry anxiously at the threshold of change.
Building Team | Jul 3, 2024
So you want to get published: What’s next?
In the AEC industry, securing media attention is no longer a niche endeavor but an essential component of a holistic marketing strategy.
Laboratories | Jul 3, 2024
New science, old buildings: Renovating for efficiency, flexibility, and connection
What does the research space of the future look like? And can it be housed in older buildings—or does it require new construction?
MFPRO+ New Projects | Jul 2, 2024
Miami residential condo tower provides a deeded office unit for every buyer
A new Miami residential condo office tower sweetens the deal for buyers by providing an individual, deeded and furnished office with each condo unit purchased. One Twenty Brickell Residences, a 34-story, 240-unit tower, also offers more than 60,000 sf of exclusive residential amenities.
Student Housing | Jul 1, 2024
Two-tower luxury senior living community features wellness and biophilic elements
A new, two-building, 27-story senior living community in Tysons, Va., emphasizes wellness and biophilic design elements. The Mather, a luxury community for adults aged 62 and older, is situated on a small site surrounded by high-rises.
Office Buildings | Jul 1, 2024
Mastering office layouts: 5 primary models for maximum efficiency and productivity
When laying out an office, there are many factors to consider. It’s important to maximize the space, but it’s equally important to make sure the design allows employees to work efficiently.
Smart Buildings | Jul 1, 2024
GSA to invest $80 million on smart building technologies at federal properties
The U.S. General Services Administration (GSA) will invest $80 million from the Inflation Reduction Act (IRA) into smart building technologies within 560 federal buildings. GSA intends to enhance operations through granular controls, expand available reporting with more advanced metering sources, and optimize the operator experience.
Sustainability | Jul 1, 2024
Amazon, JPMorgan Chase among companies collaborating with ILFI to advance carbon verification
Four companies (Amazon, JPMorgan Chase, JLL, and Prologis) are working with the International Living Future Institute to support development of new versions of Zero Carbon Certification.
K-12 Schools | Jul 1, 2024
New guidelines for securing schools and community spaces released by the Door Security and Safety Foundation
The Door Security and Safety Foundation (DSSF), in collaboration with Door and Hardware Institute (DHI), recently released of “Are Your Door Openings Secure?.” The document provides guidelines to equip school administrators, building management personnel, and community leaders with a clear roadmap to create a secure and safe environment.
Products and Materials | Jun 30, 2024
Top products from AIA 2024
This month, Building Design+Construction editors are bringing you the top products displayed at the 2024 AIA Conference on Architecture & Design. Nearly 550 building product manufacturers showcased their products—here are 17 that caught our eye.