Despite a coronavirus pandemic that has delayed or postponed projects across typologies and markets, the design firm Ware Malcomb has managed to buck that trend with design work for new buildings and spaces that serve some of the country’s hardest-hit sectors, like retail and offices, as well as some, like industrial, that have prospered during the health crisis.
Since last spring, Ware Malcomb’s completed projects have included:
•In December, the relocation of Key Food Stores Co-op’s corporate offices from Staten Island, N.Y., to 38,000 sf of Class A office space in Old Bridge, N.J. The new digs, on two floors, includes a reception area, conference rooms, a fitness center, and wellness room. The space also features an executive suite, and a test kitchen. Aside from providing interior architecture and design services, Ware Malcomb’s in-house branding studio designed environmental graphics into the workspace and amenity areas. Unity Construction Services was the project’s GC; CBRE was its broker and project manager.
•New office space for Airspace Technologies, the air transport shipping firm, located within the two-building, 235,000-sf Atlas at Carlsbad (Calif.) campus that Ware Malcomb helped to transform in 2017. Airspace Technologies is leasing 23,000 sf that are divided into three department “neighborhoods”: Design, Engineering, and Administrative. A centrally located reception, boardroom, and break area serves as a hub for employees. Ware Malcomb provided interior architecture and design services for this project, which was completed in October. The GC was Good & Roberts; the CM Hughes Marino; and the furniture supplier Cultura.
•Last summer, the 7,500-sf Vallejo First 5 Center opened as a learning and play space for children five years old or younger from low-income families. The space, inside the Vallejo (Calif.) Shopping Mall, has as its focal point a large indoor playground featuring a fantasy theme of bugs and the outdoors. Ware Malcomb provided the interior design architecture and design services, and Underwood Construction was the GC.
L'Oreal's Pulp Riot brand is now working out of new office space in Encino, Calif. Image: Haley Hill Photography
•New offices in Encino, Calif., that Ware Malcomb designed for L’Oreal’s Pulp Riot hair coloring product line. The 6,600-sf space encompasses a hair demo salon, conference rooms, open and flex offices, and a photo studio. It also serves as a training facility for stylists who come from around the country. The GC on this project, completed in July, was Pinnacle.
•Loloi Rugs’ newest facility, which opened in Atlanta last May, is a build-to-suit 646,380-sf building that incorporates a distribution center, warehouse, office space, and product showroom. Ware Malcomb designed 10,000 sf of interior office space and the 5,000-sf showroom. The offices, located on the periphery of the floorplate, have large windows and glass walls to maximize natural light exposure for the space. Ware Malcomb’s GC partner was Alston Construction.
Ware Malcomb designed the interior space and showroom for Loloi Rugs' new warehouse in Atlanta. Image: Johnny McLendon Photography
BIO-MASS BOILER A FIRST FOR ITS MARKET
Yesterday, Ware Malcomb announced the completion of the new Denver headquarters for TruStile, an industry leader in interior doors whose parent company is Marvin Windows & Doors. The headquarters includes 50,000 sf of office space and 260,000 sf of manufacturing/production space with a large outdoor amenity deck.
Bringing natural light into the building was an important design feature for TruStile's new headquarters. Image: Inside Out Studios
Ware Malcomb provided architecture, interior design, and engineering services for this project, which was built by Ryan Companies. The design team, at TruStile’s behest, ensured the layout of the open office and amenity areas were located near windows as much as possible. The production area is also visible from the building’s training room and various points in the office.
TruStile—which had been operating out of four buildings in Denver—has combined its operations into a single structure whose environmental features include a two-story mechanical building at its northern flank housing a bio-mass boiler that converts sawdust produced by the factory into energy for heating and cooling.
This site was constrained by its proximity to a 100-year floodplain. It required a development permit and a letter of map amendment and letter of map revision based on fill, known as a LOMR-F, whose issuance eliminates the federal flood insurance purchase requirement as a condition of federal or federally backed financing. This project also required a large underground detention system that was the first of its kind in Colorado.
ECOMMERCE IS DRIVING NEW PROJECTS
640 Columbia in Brooklyn, N.Y., will provide “last mile” distribution logistics for ecommerce. Image credit: Neoscape
Among the projects that Ware Malcomb currently has under construction is a multistory distribution center, known as 640 Columbia, which the firm developed in collaboration with DH Property Holdings and the GC firm Suffolk Construction.
Located on 4.5 acres in Brooklyn, N.Y., the 370,000-sf facility—which follows an industrial design prototype that Ware Malcomb came up with in 2017 for land-constrained sites—will provide so-called “last mile” logistics for the delivery of online purchases. The facility will include a warehouse, office space, two levels of truck docks, a mezzanine with parking, and dedicated elevator service on the third floor. An attached 77,853-sf parking structure will accommodate up to 184 vehicles for employees.
Since 2017, Ware Malcomb has designed approximately 20 million sf of industrial distribution projects in North America. The Brooklyn facility is scheduled for completion in the fourth quarter of 2021. Its building team includes SMBH Structural Engineering (SE), WB Engineers and Consultants (MEP/FP), and Bohler Engineering (CE).
Related Stories
MFPRO+ News | Jun 3, 2024
Seattle mayor wants to scale back energy code to spur more housing construction
Seattle’s mayor recently proposed that the city scale back a scheduled revamping of its building energy code to help boost housing production. The proposal would halt an update to the city’s multifamily and commercial building energy code that is scheduled to take effect later this year.
Mass Timber | May 31, 2024
Mass timber a big part of Western Washington University’s net-zero ambitions
Western Washington University, in Bellingham, Wash., 90 miles from Seattle, is in the process of expanding its ABET-accredited programs for electrical engineering, computer engineering and science, and energy science. As part of that process, the university is building Kaiser Borsari Hall, the 54,000-sf new home for those academic disciplines that will include teaching labs, research labs, classrooms, collaborative spaces, and administrative offices.
Construction Costs | May 31, 2024
Despite challenges, 2024 construction material prices continue to stabilize
Gordian’s Q2 2024 Quarterly Construction Cost Insights Report indicates that supply chain issues notwithstanding, many commodities are exhibiting price normalization.
University Buildings | May 30, 2024
Washington University School of Medicine opens one of the world’s largest neuroscience research buildings
In St. Louis’ Cortex Innovation District, Washington University School of Medicine recently opened its new Jeffrey T. Fort Neuroscience Research Building. Designed by CannonDesign and Perkins&Will, the 11-story, 609,000-sf facility is one of the largest neuroscience buildings in the world.
Architects | May 30, 2024
AE firm Goodwyn Mills Cawood merges with Southland Engineering
Architecture and engineering firm Goodwyn Mills Cawood (GMC) is further expanding its services through a strategic merger with engineering firm Southland Engineering in Cartersville, Ga.
K-12 Schools | May 30, 2024
Inclusive design strategies to transform learning spaces
Students with disabilities and those experiencing mental health and behavioral conditions represent a group of the most vulnerable students at risk for failing to connect educationally and socially. Educators and school districts are struggling to accommodate all of these nuanced and, at times, overlapping conditions.
MFPRO+ New Projects | May 29, 2024
Two San Francisco multifamily high rises install onsite water recycling systems
Two high-rise apartment buildings in San Francisco have installed onsite water recycling systems that will reuse a total of 3.9 million gallons of wastewater annually. The recycled water will be used for toilet flushing, cooling towers, and landscape irrigation to significantly reduce water usage in both buildings.
Healthcare Facilities | May 28, 2024
Healthcare design: How to improve the parking experience for patients and families
Parking is likely a patient’s—and their families—first and last touch with a healthcare facility. As such, the arrival and departure parking experience can have a profound impact on their experience with the healthcare facility, writes Beth Bryan, PE, PTOE, PTP, STP2, Principal, Project Manager, Walter P Moore.
Urban Planning | May 28, 2024
‘Flowing’ design emphasizes interaction at Bellevue, Wash., development
The three-tower 1,030,000-sf office and retail development designed by Graphite Design Group in collaboration with Compton Design Office for Vulcan Real Estate is attracting some of the world’s largest names in tech and hospitality.
MFPRO+ News | May 28, 2024
ENERGY STAR NextGen Certification for New Homes and Apartments launched
The U.S. Environmental Protection Agency recently launched ENERGY STAR NextGen Certified Homes and Apartments, a voluntary certification program for new residential buildings. The program will increase national energy and emissions savings by accelerating the building industry’s adoption of advanced, energy-efficient technologies, according to an EPA news release.