flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Ware Malcomb finds itself in the mix for multiple diverse projects

Architects

Ware Malcomb finds itself in the mix for multiple diverse projects

Its latest completion is an office/factory/warehouse combo for one of Marvin Window’s brands.


By John Caulfield, Senior Editor | January 5, 2021
Lobby of TruStile's new headquarters in Denver

The door manufacturer TruStile is moving into a new headquarters in Denver designed by Ware Malcomb, one of several projects the firm has completed over the past six or seven months. Image: Inside Out Studios

Despite a coronavirus pandemic that has delayed or postponed projects across typologies and markets, the design firm Ware Malcomb has managed to buck that trend with design work for new buildings and spaces that serve some of the country’s hardest-hit sectors, like retail and offices, as well as some, like industrial, that have prospered during the health crisis.

Since last spring, Ware Malcomb’s completed projects have included:

•In December, the relocation of Key Food Stores Co-op’s corporate offices from Staten Island, N.Y., to 38,000 sf of Class A office space in Old Bridge, N.J. The new digs, on two floors, includes a reception area, conference rooms, a fitness center, and wellness room. The space also features an executive suite, and a test kitchen. Aside from providing interior architecture and design services, Ware Malcomb’s in-house branding studio designed environmental graphics into the workspace and amenity areas.  Unity Construction Services was the project’s GC; CBRE was its broker and project manager.

•New office space for Airspace Technologies, the air transport shipping firm, located within the two-building, 235,000-sf Atlas at Carlsbad (Calif.) campus that Ware Malcomb helped to transform in 2017. Airspace Technologies is leasing 23,000 sf that are divided into three department “neighborhoods”: Design, Engineering, and Administrative. A centrally located reception, boardroom, and break area serves as a hub for employees. Ware Malcomb provided interior architecture and design services for this project, which was completed in October. The GC was Good & Roberts; the CM Hughes Marino; and the furniture supplier Cultura.

•Last summer, the 7,500-sf Vallejo First 5 Center opened as a learning and play space for children five years old or younger from low-income families. The space, inside the Vallejo (Calif.) Shopping Mall, has as its focal point a large indoor playground featuring a fantasy theme of bugs and the outdoors. Ware Malcomb provided the interior design architecture and design services, and Underwood Construction was the GC.

Entrance of Pulp Riot's office space

L'Oreal's Pulp Riot brand is now working out of new office space in Encino, Calif. Image: Haley Hill Photography

Workspace in Pulp Riot's new office

•New offices in Encino, Calif., that Ware Malcomb designed for L’Oreal’s Pulp Riot hair coloring product line. The 6,600-sf space encompasses a hair demo salon, conference rooms, open and flex offices, and a photo studio. It also serves as a training facility for stylists who come from around the country. The GC on this project, completed in July, was Pinnacle.

•Loloi Rugs’ newest facility, which opened in Atlanta last May, is a build-to-suit 646,380-sf building that incorporates a distribution center, warehouse, office space, and product showroom. Ware Malcomb designed 10,000 sf of interior office space and the 5,000-sf showroom. The offices, located on the periphery of the floorplate, have large windows and glass walls to maximize natural light exposure for the space. Ware Malcomb’s GC partner was Alston Construction.

Ware Malcomb designed the interior space and showroom for Loloi Rugs' new warehouse in Atlanta. Image: Johnny McLendon Photography

 

BIO-MASS BOILER A FIRST FOR ITS MARKET

Yesterday, Ware Malcomb announced the completion of the new Denver headquarters for TruStile, an industry leader in interior doors whose parent company is Marvin Windows & Doors. The headquarters includes 50,000 sf of office space and 260,000 sf of manufacturing/production space with a large outdoor amenity deck.

Bringing natural light into the building was an important design feature for TruStile's new headquarters. Image: Inside Out Studios

 

Ware Malcomb provided architecture, interior design, and engineering services for this project, which was built by Ryan Companies. The design team, at TruStile’s behest, ensured the layout of the open office and amenity areas were located near windows as much as possible. The production area is also visible from the building’s training room and various points in the office.

TruStile—which had been operating out of four buildings in Denver—has combined its operations into a single structure whose environmental features include a two-story mechanical building at its northern flank housing a bio-mass boiler that converts sawdust produced by the factory into energy for heating and cooling.

This site was constrained by its proximity to a 100-year floodplain. It required a development permit and a letter of map amendment and letter of map revision based on fill, known as a LOMR-F, whose issuance eliminates the federal flood insurance purchase requirement as a condition of federal or federally backed financing. This project also required a large underground detention system that was the first of its kind in Colorado.

ECOMMERCE IS DRIVING NEW PROJECTS

640 Columbia, a new distribution center in Brooklyn, N.Y.

640 Columbia in Brooklyn, N.Y., will provide “last mile”  distribution logistics for ecommerce. Image credit: Neoscape

 

Among the projects that Ware Malcomb currently has under construction is a multistory distribution center, known as 640 Columbia, which the firm developed in collaboration with DH Property Holdings and the GC firm Suffolk Construction.

Located on 4.5 acres in Brooklyn, N.Y., the 370,000-sf facility—which follows an industrial design prototype that Ware Malcomb came up with in 2017 for land-constrained sites—will provide so-called “last mile” logistics for the delivery of online purchases. The facility will include a warehouse, office space, two levels of truck docks, a mezzanine with parking, and dedicated elevator service on the third floor. An attached 77,853-sf parking structure will accommodate up to 184 vehicles for employees.

Since 2017, Ware Malcomb has designed approximately 20 million sf of industrial distribution projects in North America. The Brooklyn facility is scheduled for completion in the fourth quarter of 2021. Its building team includes SMBH Structural Engineering (SE), WB Engineers and Consultants (MEP/FP), and Bohler Engineering (CE).

Related Stories

Government Buildings | May 10, 2024

New federal buildings must be all-electric by 2030

A new Biden Administration rule bans the use of fossil fuels in new federal buildings beginning in 2030. The announcement came despite longstanding opposition to the rule by the natural gas industry. 

Sustainable Development | May 10, 2024

Nature as the city: Why it’s time for a new framework to guide development

NBBJ leaders Jonathan Ward and Margaret Montgomery explore five inspirational ideas they are actively integrating into projects to ensure more healthy, natural cities.

Mass Timber | May 8, 2024

Portland's Timberview VIII mass timber multifamily development will offer more than 100 affordable units

An eight-story, 72,000-sf mass timber apartment building in Portland, Ore., topped out this winter and will soon offer over 100 affordable units. The structure is the tallest affordable housing mass timber building and the first Type IV-C affordable housing building in the city. 

Architects | May 8, 2024

Ivan O’Garro, AIA joins LEO A DALY as a vice president

Integrated design firm LEO A DALY welcomes Ivan O’Garro, AIA, as a vice president and managing principal of its Atlanta studio.

K-12 Schools | May 7, 2024

World's first K-12 school to achieve both LEED for Schools Platinum and WELL Platinum

A new K-12 school in Washington, D.C., is the first school in the world to achieve both LEED for Schools Platinum and WELL Platinum, according to its architect, Perkins Eastman. The John Lewis Elementary School is also the first school in the District of Columbia designed to achieve net-zero energy (NZE). 

Healthcare Facilities | May 6, 2024

Hospital construction costs for 2024

Data from Gordian breaks down the average cost per square foot for a three-story hospital across 10 U.S. cities.

Biophilic Design | May 6, 2024

The benefits of biophilic design in the built environment

Biophilic design in the built environment supports the health and wellbeing of individuals, as they spend most of their time indoors.

MFPRO+ Special Reports | May 6, 2024

Top 10 trends in affordable housing

Among affordable housing developers today, there’s one commonality tying projects together: uncertainty. AEC firms share their latest insights and philosophies on the future of affordable housing in BD+C's 2023 Multifamily Annual Report.

Retail Centers | May 3, 2024

Outside Las Vegas, two unused office buildings will be turned into an open-air retail development

In Henderson, Nev., a city roughly 15 miles southeast of Las Vegas, 100,000 sf of unused office space will be turned into an open-air retail development called The Cliff. The $30 million adaptive reuse development will convert the site’s two office buildings into a destination for retail stores, chef-driven restaurants, and community entertainment.

Codes and Standards | May 3, 2024

New York City considering bill to prevent building collapses

The New York City Council is considering a proposed law with the goal of preventing building collapses. The Billingsley Structural Integrity Act is a response to the collapse of 1915 Billingsley Terrace in the Bronx last December. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021