flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

A wind energy system—without the blades—can be placed on commercial building rooftops

Sustainability

A wind energy system—without the blades—can be placed on commercial building rooftops

Aeromine Technologies’ bladeless system captures and amplifies a building’s airflow like airfoils on a race car.


By Novid Parsi, Contributing Editor | February 8, 2023
Photo courtesy Aeromine
Aeromine has no external moving parts and no vibration. Like airfoils on a race car, the technology captures and amplifies a building’s airflow. Photo courtesy Aeromine

Typically, “wind energy” conjures up images of massive turbines in large fields or out at sea. Aeromine Technologies has created a bladeless wind energy system that sits on the rooftops of commercial properties and provides onsite renewable energy. The motionless system integrates with a building’s existing electrical and rooftop solar systems.

In January, AEC Angels, an investment platform focused on emerging technologies in the architecture, engineering, and construction sectors, announced that it has endorsed Aeromine and that AEC Angels member Thornton Tomasetti has invested in the Houston-based company. AEC Angels is an alliance of industry veterans that evaluate and invest in early-stage companies with promising technological advances. Its members also include STO Building Group, Syska Hennessy, and SHoP Architects.

“Aeromine’s proprietary and innovative technology makes the promise of bringing the performance of wind energy to the built environment a reality that can increase on site generation 100-200% for any given project when paired with solar and battery storage,” Grant McCullagh, director at Thornton Tomasetti and AEC Angels’ managing director, said in a statement.

Building-integrated wind turbine with zero external moving parts

Aeromine has no external moving parts and no vibration. Like airfoils on a race car, the technology captures and amplifies a building’s airflow. Needing 10% of the roof space used by solar panels, the stationary and silent Aeromine unit can generate energy at any time and in any weather. Aeromine systems typically comprise 20-40 units on a building’s edge, facing the predominant wind direction. 

Aeromine Technologies says its system is up to 50% more productive than other renewable energy alternatives. Combining Aeromine with rooftop solar can generate up to 100% of a building’s onsite energy needs, while reducing the need for energy storage.

Companies piloting Aeromine’s technology include BASF Corporation, which is testing the wind energy system at its manufacturing plant in Wyandotte, Mich.

Here is how the bladeless wind energy system works:

Aeromine_UNIT2

Related Stories

Building Team | Jun 27, 2017

Bruner Foundation announces 2017 Rudy Bruner Award for Urban Excellence gold and silver medalists

The SteelStacks Arts and Cultural Campus in Bethlehem, Pa., receives the gold medal and $50,000.

Green | Jun 23, 2017

Want a healthy building? Follow this primer on two new wellness standards

Since its development in the 1990s, the LEED rating system has been applied to over 19.1 billion total commercial square feet. 

Codes and Standards | Jun 21, 2017

World Green Building Council: All buildings must be net zero by 2050 to avert 2°C rise

Building efficiency essential to tempering global climate change.

Green | Jun 16, 2017

Could this become London’s greenest building?

Curl la Tourelle Head Architecture wants to create a school powered by the River Thames.

Green | Jun 15, 2017

45-meter spiraling tower lets you walk above the trees

A 600-meter treetop path culminates with a 45-meter-tall spiraling observation deck.

Wood | Jun 13, 2017

The first timber high-rise in the U.S. set for construction in Portland

The building’s design, building materials, and commercial tenants are all focused on the key aspect of sustainability.

Building Team Awards | Jun 13, 2017

Secluded sanctuary: Alnoba leadership training center

Leadership training center becomes New England’s first Passive House building.

Wood | Jun 6, 2017

Shigeru Ban-designed residential structure poised to become world’s tallest hybrid timber building

The wood, concrete, and glass building will rise approximately 233 feet when finished.

| May 30, 2017

Accelerate Live! talk: Health-generating buildings, Marcene Kinney, Angela Mazzi, GBBN Architects

Architects Marcene Kinney and Angela Mazzi share design hacks pinpointing specific aspects of the built environment that affect behavior, well-being, and performance.

Multifamily Housing | May 22, 2017

Zaha Hadid Architects residential development takes a page from a classic Bradbury tale

The buildings are on an elevated platform and the surrounding walkways are suspended so as not to disturb the surrounding ecosystems.

boombox1
boombox2
native1

More In Category


Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021