flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

World’s tallest detached-core building completes in Shenzhen

Mixed-Use

World’s tallest detached-core building completes in Shenzhen

Morphosis designed the project.


By David Malone, Associate Editor | June 2, 2021

Photo: Zhang Chao

Hanking Center, an 1,180-foot-tall mixed-use complex with a commercial office tower and retail center, has completed in Shenzhen, China. The 65-story tower is currently the tallest detached-core building in the world.

The slender profile of the tower emerges above a low-rise retail podium that features angled facets, shadowing the form of the tower above. A series of glass sky bridges and steel mega-braces knit the offset core to the main body of the tower. At ground level, the Center is accessible by multiple entrances and is set within a landscaped public plaza, ensuring a permeable site that invites the public into the retail podium.

The tower’s steel structural system and detached-core configuration, which positions the tower’s primary core on the building’s exterior, promotes higher efficiency and adaptability of interior floor plates. This enhances the tower’s ability to service the varying needs of its occupants. The detached-core configuration also allows for an innovative approach to internal circulation and the creation of social and work spaces that integrate public and private domains. Two secondary cores in the body provide additional structural reinforcement and house mechanical services such as freight and VIP elevators.

By shifting the primary movement and service core outside the main body of the tower, the design minimizes the building’s structural footprint while maximizing open spaces inside the tower. The exoskeletal frame bends and straightens to expand and contract interior floor sizes.

The open floor plates allow for enhanced natural light and airflow. Tenants move from circulation around the core to quieter perimeter offices, creating a public to private gradient. Folded angles are used to merge public components in the podium with private commercial space in the tower. Inside the retail podium, a tapered atrium draws natural light down into the mall creating an inviting interior environment for the public. A grand plaza and dimensional hardscape surrounds the tower’s podium to create a new neighborhood landmark that enhances public activity at the street level.

The project completed in 2018 with a gradual opening that continued into 2021.

Tags

Related Stories

Mixed-Use | Aug 4, 2021

Diamond Schmitt to lead design for Therme Canada | Ontario Place redevelopment

The project will be a year-round waterfront destination.

Mixed-Use | Jul 16, 2021

SOM to lead the design of the 2026 Milan-Cortina Olympic Village

The project is part of the updated Porta Romana railway yard master plan.

Mixed-Use | Jun 30, 2021

Design details released about new development in Seattle’s vibrant Belltown district

Connecting the building, called Archetype, to the street, neighborhood, and bay is a key imperative.

Mixed-Use | Jun 21, 2021

Design team of Gensler and Manning selected to design The River District

The mixed-use neighborhood will be built along the Mississippi River in New Orleans.

Mixed-Use | Jun 17, 2021

London’s former Old War Office building set to become hotel and residences

The building had been closed to the public for over a century.

Mixed-Use | Jun 14, 2021

SB Architects and LandDesign unveil design for Rivana at Innovation Station

The development is located 25 miles west of downtown Washington, D.C.

Mixed-Use | Jun 10, 2021

Safdie Architects unveils design for ORCA Toronto

The project comprises nine towers in total.

Mixed-Use | Jun 7, 2021

Henning Larsen designs an active community hub for London

The project will be the firm’s first in London.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021