In 2013, Texas A&M University College of Engineering launched its “25 by 25 initiative,” whose goal is to more than double its enrollment to 25,000 students by 2025 without incurring significant infrastructure costs. All this while simultaneously creating a 21st-century engineering education model focused on technology-enabled learning, hands-on projects, and collaborative and multidisciplinary learning spaces.
The first step was the renovation and expansion of the old Zachry building, a 1970s-era precast box. The revivified structure, now the largest academic building on campus, has become a gateway that has added two five-story additions totaling 225,000 sf. Its common labs have open floor plans organized by themes rather than by standalone departments.
To make the building look like new construction, the project team, led by architect TreanorHL, removed the entire load-bearing precast concrete façade. Permanent steel framing was installed prior to removal, which eliminated the need for about 90% of temporary shoring. The team also reused 80% of materials from the original structure.
The atrium and staircase are activated by natural light, flexible seating, glass walls, and a skylight.
Visual transparency into the learning studios, labs, maker spaces, and outdoor green spaces activates the building’s interior. A new central atrium connects a learning staircase and a 165-foot-long, 3,500-sf split-level skylight that runs down the atrium’s spine.
To support new ways of learning and instruction, the design team collaborated with a national furniture manufacturer to develop custom group tables whose monitors can be raised and lowered on demand. Users can switch between tables and displays to selectively share and display inputs from any point in the room, from distance learning, and via interactive touchscreens (T1V) in each learning studio. These components and concepts were tested in an offsite prototype classroom prior to installation.
The Zachry Engineering Education Complex received the Gold Medal Engineering Excellence Award and the Eminent Conceptor Award from the American Council of Engineering.
GOLD AWARD WINNER
BUILDING TEAM TreanorHL (submitting firm, architect) Texas A&M University (owner/developer) JQ Infrastructure (SE, CE) Shah Smith & Associates (MEP) Coleman & Associates (landscape architect) Vaughn Construction (GC, CM) DETAILS 530,000 sf Total cost $171 million Construction time August 2016 to July 2018 Delivery method CM at risk
Related Stories
Reconstruction Awards | Nov 27, 2017
The birthplace of General Motors
The automotive giant salvages the place from which it sprang, 131 years ago.
Reconstruction Awards | Nov 21, 2017
Mama mia! What a pizzeria!: It started as a bank nearly a century ago, now it’s a pizza parlor with plenty of pizzazz
The first floor features a zinc bar and an authentic Neapolitan pizza oven.
Reconstruction Awards | Nov 21, 2017
Honor Guard: San Francisco’s historic Veterans Building pays homage to those who served in World War I and other foreign wars
The Veterans Building houses the War Memorial staff, the city’s Arts Commission, the Opera’s learning center and practice/performance node, the Green Room reception venue, and the 916-seat Herbst Theatre.
Reconstruction Awards | Nov 20, 2017
Eyes wide open: Students can see their new home’s building elements
The two-phase project revamped an opaque, horseshoe-shaped labyrinth of seven buildings from the ’60s and ’70s.
Reconstruction Awards | Nov 17, 2017
Gray lady no more: A facelift erases a landmark’s wrinkles, but not her heritage
The Building Team restored the granite and terra cotta façade and reclaimed more than 500 double-hung windows.
Reconstruction Awards | Nov 17, 2017
Elegance personified: New life for a neglected but still imposing retail/office space
The building was in such disrepair that much of the reconstruction budget had to go toward structural, mechanical, and electrical infrastructure improvements.
Reconstruction Awards | Nov 16, 2017
Back to the '20s: Coney Island gets a new eatery reminiscent of the past
This project included the restoration of the landmark Childs Restaurant.
Reconstruction Awards | Nov 15, 2017
Foyer fantastique: Faded images provide the key to a historic theater's lobby restoration
The restoration relied heavily on historic photos and drawings.
Reconstruction Awards | Nov 14, 2017
Hallowed ground: A Mormon temple rises from the ashes of a fire-ravaged historic tabernacle
Parts of the tabernacle’s exterior shell were the only things that survived the blaze.
Reconstruction Awards | Nov 13, 2017
Harlem Renaissance: A vacant school provides much-needed housing and a clubhouse for children
Word that PS 186 might be demolished brought out the preservationists, whose letter-writing campaign gained the support of the New York Landmarks Conservancy.