flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Zaha Hadid Architects unveils 2 Murray Road in Hong Kong

Mixed-Use

Zaha Hadid Architects unveils 2 Murray Road in Hong Kong

The project reinterprets the structural forms and layering of a Bauhinia bud about to blossom.


By David Malone, Associate Editor | October 2, 2020
2 Murray road exterior facade

Rendering: Arqui9

Zaha Hadid Architects has announced the design of 2 Murray Road, a 36-story, 623-foot-tall project that will rise at the core of Hong Kong’s financial district. The project replaces a multi-story car park to create an urban oasis adjacent to the Chater Garden and is within walking distance to Central and Admiralty MTR metro stations.

The double-height foyer at ground level is arranged for access on multiple levels and welcomes staff and visitors with an interplay of natural light, planting, and organic forms leading up to the second floor public lobby on the city’s elevated walkway network. Suspended above the canopy of its surrounding trees, the lobby’s sculptural glass facade defines a variety of nested spaces. The color palette of these spaces differentiate key destinations within the tower.

 

2 Murray facadeRendering: Cosmocube.

 

A Sky Garden located on the refuge floor is an outdoor recreational space with a running track and an aquaponics planting network that acts as an effective biological air-purifying filter by consuming contaminants. The banqueting hall at the top of the tower offers panoramic views of the city’s surrounding skyline and can host a variety of public and corporate events. The space includes a glazed roof and facade. A high-tensile street structure provides wide span (up to 26 meters) naturally lit, column-free, Grade A office space with five meter floor-to-floor height. 

 

2 Murray foyer and lobby exteriorRendering: MIR.

 

The tower’s base is elevated above the ground to shelter courtyards and gardens cultivated with trees and plants, creating new civic plazas enveloped by nature. The outdoor areas flow into generous interior communal spaces. The curved glass facade enhances the connectivity between the building’s interior and the surrounding gardens and city.

The facade itself is designed to withstand the region’s summer typhoons. It is composed of 4-ply, double-laminated, double-curved insulated glass units to effectively insulate the building and reduce its cooling load and build resilience. These glass units are the first of their kind in Hong Kong.

 

2 Murray exterior top levelsRendering: Cosmocube.

 

Hybrid ventilation is controlled by the building’s automated management system and enables all office levels to be naturally ventilated. This natural ventilation can be supplemented when required with mechanical dehumidification and filtration to further enhance the indoor environment and air quality.

The building’s air quality monitoring system will detect the degree of occupancy in any interior and automatically adjust indoor air temperature, humidity, and fresh air volume to meet demand. The smart systems learn to predict daily occupancy trends to optimize energy demand, ensuring increased efficiencies with lower energy consumption.

Two weather stations will be installed at street level and roof level to monitor real-time outdoor conditions including PM10, PM2.5, ozone, daylight (solar irradiation), wind speed (m/s) rainfall (mm), temperature, humidity (%), and noise (dB). The weather stations will inform occupants of outdoor air quality and are connected to the building’s automated management system to adjust the tower’s hybrid ventilation as required.

A solar responsive ventilator (SRV) along the western perimeter of each floor enhances the comfort of the occupants. The SRV is powered by photovoltaics to create a channel of air that has the ability to adjust solar radiative heat to the perimeter zone.

 

2 Murray Road from ground levelRendering: Arqui9.

 

A 25% reduction in electricity demand will be achieved through the use of smart chiller plant optimization, high-efficiency HVAC equipment, and daylight sensors that reduce the artificial lighting during periods of sufficient natural light.

The project will rebuilt via a top-down construction method to accelerate the redevelopment program on-site by implementing deep basement and above-ground construction at the same time. The plot of land was purchased by developer Henderson Land for $3 billion in 2017, making it the most expensive plot of land ever purchased.

The design has achieved LEED Platinum and WELL Platinum pre-certification together with the highest three-star rating in CHina’s Green Building Rating Program.

 

2 Murray Road foyer and lobby interior spaceRendering: PixelFlakes.

 

Tags

Related Stories

Mixed-Use | Jan 29, 2024

12 U.S. markets where entertainment districts are under consideration or construction

The Pomp, a 223-acre district located 10 miles north of Fort Lauderdale, Fla., and The Armory, a 225,000-sf dining and entertainment venue on six acres in St Louis, are among the top entertainment districts in the works across the U.S.

Mixed-Use | Jan 26, 2024

Entertainment districts are no longer just about sports, dining, and music

Diversity of experiences is what makes entertainment districts tick these days. That’s one reason why offices continue to be included in district proposals. And in their efforts to emerge as year-round destinations, more districts are either including residential in their proposals or supporting existing districts with housing.

Mixed-Use | Jan 19, 2024

Trademark secures financing to develop Fort Worth multifamily community

National real estate developer, investor, and operator, Trademark Property Company, has closed on the land and secured the financing for The Vickery, a multifamily-led mixed-use community located on five acres at W. Vickery Boulevard and Hemphill Street overlooking Downtown Fort Worth.

Affordable Housing | Jan 18, 2024

Habitat tops off second apartment building at 43 Green

The co-developers of 43 Green celebrate the latest milestone for the $100 million, mixed-income, mixed-use project in Bronzeville: topping off Phase 2 while reaching full lease-up of the Phase 1 apartment building.

Adaptive Reuse | Jan 18, 2024

Coca-Cola packaging warehouse transformed into mixed-use complex

The 250,000-sf structure is located along a now defunct railroad line that forms the footprint for the city’s multi-phase Beltline pedestrian/bike path that will eventually loop around the city.

Sponsored | BD+C University Course | Jan 17, 2024

Waterproofing deep foundations for new construction

This continuing education course, by Walter P Moore's Amos Chan, P.E., BECxP, CxA+BE, covers design considerations for below-grade waterproofing for new construction, the types of below-grade systems available, and specific concerns associated with waterproofing deep foundations.

Sustainability | Jan 10, 2024

New passive house partnership allows lower cost financing for developers

The new partnership between PACE Equity and Phius allows commercial passive house projects to be automatically eligible for CIRRUS Low Carbon financing.

MFPRO+ Special Reports | Jan 4, 2024

Top 10 trends in multifamily rental housing

Demographic and economic shifts, along with work and lifestyle changes, have made apartment living preferable for a wider range of buyers and renters. These top 10 trends in multifamily housing come from BD+C's 2023 Multifamily Annual Report.

Mixed-Use | Nov 29, 2023

Mixed-use community benefits from city amenities and ‘micro units’

Salt Lake City, Utah, is home to a new mixed-use residential community that benefits from transit-oriented zoning and cleverly designed multifamily units.

Sustainability | Nov 20, 2023

8 strategies for multifamily passive house design projects

Stantec's Brett Lambert, Principal of Architecture and Passive House Certified Consultant, uses the Northland Newton Development project to guide designers with eight tips for designing multifamily passive house projects.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021