Zaha Hadid Architects has announced the design of 2 Murray Road, a 36-story, 623-foot-tall project that will rise at the core of Hong Kong’s financial district. The project replaces a multi-story car park to create an urban oasis adjacent to the Chater Garden and is within walking distance to Central and Admiralty MTR metro stations.
The double-height foyer at ground level is arranged for access on multiple levels and welcomes staff and visitors with an interplay of natural light, planting, and organic forms leading up to the second floor public lobby on the city’s elevated walkway network. Suspended above the canopy of its surrounding trees, the lobby’s sculptural glass facade defines a variety of nested spaces. The color palette of these spaces differentiate key destinations within the tower.
Rendering: Cosmocube.
A Sky Garden located on the refuge floor is an outdoor recreational space with a running track and an aquaponics planting network that acts as an effective biological air-purifying filter by consuming contaminants. The banqueting hall at the top of the tower offers panoramic views of the city’s surrounding skyline and can host a variety of public and corporate events. The space includes a glazed roof and facade. A high-tensile street structure provides wide span (up to 26 meters) naturally lit, column-free, Grade A office space with five meter floor-to-floor height.
Rendering: MIR.
The tower’s base is elevated above the ground to shelter courtyards and gardens cultivated with trees and plants, creating new civic plazas enveloped by nature. The outdoor areas flow into generous interior communal spaces. The curved glass facade enhances the connectivity between the building’s interior and the surrounding gardens and city.
The facade itself is designed to withstand the region’s summer typhoons. It is composed of 4-ply, double-laminated, double-curved insulated glass units to effectively insulate the building and reduce its cooling load and build resilience. These glass units are the first of their kind in Hong Kong.
Rendering: Cosmocube.
Hybrid ventilation is controlled by the building’s automated management system and enables all office levels to be naturally ventilated. This natural ventilation can be supplemented when required with mechanical dehumidification and filtration to further enhance the indoor environment and air quality.
The building’s air quality monitoring system will detect the degree of occupancy in any interior and automatically adjust indoor air temperature, humidity, and fresh air volume to meet demand. The smart systems learn to predict daily occupancy trends to optimize energy demand, ensuring increased efficiencies with lower energy consumption.
Two weather stations will be installed at street level and roof level to monitor real-time outdoor conditions including PM10, PM2.5, ozone, daylight (solar irradiation), wind speed (m/s) rainfall (mm), temperature, humidity (%), and noise (dB). The weather stations will inform occupants of outdoor air quality and are connected to the building’s automated management system to adjust the tower’s hybrid ventilation as required.
A solar responsive ventilator (SRV) along the western perimeter of each floor enhances the comfort of the occupants. The SRV is powered by photovoltaics to create a channel of air that has the ability to adjust solar radiative heat to the perimeter zone.
Rendering: Arqui9.
A 25% reduction in electricity demand will be achieved through the use of smart chiller plant optimization, high-efficiency HVAC equipment, and daylight sensors that reduce the artificial lighting during periods of sufficient natural light.
The project will rebuilt via a top-down construction method to accelerate the redevelopment program on-site by implementing deep basement and above-ground construction at the same time. The plot of land was purchased by developer Henderson Land for $3 billion in 2017, making it the most expensive plot of land ever purchased.
The design has achieved LEED Platinum and WELL Platinum pre-certification together with the highest three-star rating in CHina’s Green Building Rating Program.
Rendering: PixelFlakes.
Related Stories
Mixed-Use | Oct 7, 2024
New mixed-use tower by Studio Gang completes first phase of San Francisco waterfront redevelopment
Construction was recently completed on Verde, a new mixed-use tower along the San Francisco waterfront, marking the end of the first phase of the Mission Rock development. Verde is the fourth and final building of phase one of the 28-acre project that will be constructed in several phases guided by design principles developed by a design cohort led by Studio Gang.
Affordable Housing | Oct 4, 2024
3 new affordable housing projects for October 2024
As affordable housing continues to grow, more projects are looking to diversify their footprint by adding mixed-use components, community areas, and more.
Mixed-Use | Sep 19, 2024
A Toronto development will transform a 32-acre shopping center site into a mixed-use urban neighborhood
Toronto developers Mattamy Homes and QuadReal Property Group have launched The Clove, the first phase in the Cloverdale, a $6 billion multi-tower development. The project will transform Cloverdale Mall, a 32-acre shopping center in Toronto, into a mixed-use urban neighborhood.
Mixed-Use | Sep 10, 2024
Centennial Yards, a $5 billion mixed-use development in downtown Atlanta, tops out its first residential tower
Centennial Yards Company has topped out The Mitchell, the first residential tower of Centennial Yards, a $5 billion mixed-use development in downtown Atlanta. Construction of the apartment building is expected to be complete by the middle of next year, with first move-ins slated for summer 2025.
Codes and Standards | Sep 3, 2024
Atlanta aims to crack down on blighted properties with new tax
A new Atlanta law is intended to crack down on absentee landlords including commercial property owners and clean up neglected properties. The “Blight Tax” allows city officials to put levies on blighted property owners up to 25 times higher than current millage rates.
Building Technology | Aug 23, 2024
Top-down construction: Streamlining the building process | BD+C
Learn why top-down construction is becoming popular again for urban projects and how it can benefit your construction process in this comprehensive blog.
Mixed-Use | Aug 21, 2024
Adaptive reuse of a Sears store becomes luxury mixed-use housing
6 Corners Lofts at 4714 W Irving Park Road, Chicago, Ill., opened in March of 2024 as a 394,000-sf adaptive reuse project born out of a former Sears store.
Curtain Wall | Aug 15, 2024
7 steps to investigating curtain wall leaks
It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus.
Adaptive Reuse | Aug 14, 2024
Adaptive reuse revives a former warehouse in St. Louis
The Victor, as the building is now called, has nearly 400 residential apartments.
Adaptive Reuse | Aug 14, 2024
KPF unveils design for repositioning of Norman Foster’s 8 Canada Square tower in London
8 Canada Square, a Norman Foster-designed office building that’s currently the global headquarters of HSBC Holdings, will have large sections of its façade removed to create landscaped terraces. The project, designed by KPF, will be the world’s largest transformation of an office tower into a sustainable mixed-use building.