flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Zaha Hadid Architects unveils 2 Murray Road in Hong Kong

Mixed-Use

Zaha Hadid Architects unveils 2 Murray Road in Hong Kong

The project reinterprets the structural forms and layering of a Bauhinia bud about to blossom.


By David Malone, Associate Editor | October 2, 2020
2 Murray road exterior facade

Rendering: Arqui9

Zaha Hadid Architects has announced the design of 2 Murray Road, a 36-story, 623-foot-tall project that will rise at the core of Hong Kong’s financial district. The project replaces a multi-story car park to create an urban oasis adjacent to the Chater Garden and is within walking distance to Central and Admiralty MTR metro stations.

The double-height foyer at ground level is arranged for access on multiple levels and welcomes staff and visitors with an interplay of natural light, planting, and organic forms leading up to the second floor public lobby on the city’s elevated walkway network. Suspended above the canopy of its surrounding trees, the lobby’s sculptural glass facade defines a variety of nested spaces. The color palette of these spaces differentiate key destinations within the tower.

 

2 Murray facadeRendering: Cosmocube.

 

A Sky Garden located on the refuge floor is an outdoor recreational space with a running track and an aquaponics planting network that acts as an effective biological air-purifying filter by consuming contaminants. The banqueting hall at the top of the tower offers panoramic views of the city’s surrounding skyline and can host a variety of public and corporate events. The space includes a glazed roof and facade. A high-tensile street structure provides wide span (up to 26 meters) naturally lit, column-free, Grade A office space with five meter floor-to-floor height. 

 

2 Murray foyer and lobby exteriorRendering: MIR.

 

The tower’s base is elevated above the ground to shelter courtyards and gardens cultivated with trees and plants, creating new civic plazas enveloped by nature. The outdoor areas flow into generous interior communal spaces. The curved glass facade enhances the connectivity between the building’s interior and the surrounding gardens and city.

The facade itself is designed to withstand the region’s summer typhoons. It is composed of 4-ply, double-laminated, double-curved insulated glass units to effectively insulate the building and reduce its cooling load and build resilience. These glass units are the first of their kind in Hong Kong.

 

2 Murray exterior top levelsRendering: Cosmocube.

 

Hybrid ventilation is controlled by the building’s automated management system and enables all office levels to be naturally ventilated. This natural ventilation can be supplemented when required with mechanical dehumidification and filtration to further enhance the indoor environment and air quality.

The building’s air quality monitoring system will detect the degree of occupancy in any interior and automatically adjust indoor air temperature, humidity, and fresh air volume to meet demand. The smart systems learn to predict daily occupancy trends to optimize energy demand, ensuring increased efficiencies with lower energy consumption.

Two weather stations will be installed at street level and roof level to monitor real-time outdoor conditions including PM10, PM2.5, ozone, daylight (solar irradiation), wind speed (m/s) rainfall (mm), temperature, humidity (%), and noise (dB). The weather stations will inform occupants of outdoor air quality and are connected to the building’s automated management system to adjust the tower’s hybrid ventilation as required.

A solar responsive ventilator (SRV) along the western perimeter of each floor enhances the comfort of the occupants. The SRV is powered by photovoltaics to create a channel of air that has the ability to adjust solar radiative heat to the perimeter zone.

 

2 Murray Road from ground levelRendering: Arqui9.

 

A 25% reduction in electricity demand will be achieved through the use of smart chiller plant optimization, high-efficiency HVAC equipment, and daylight sensors that reduce the artificial lighting during periods of sufficient natural light.

The project will rebuilt via a top-down construction method to accelerate the redevelopment program on-site by implementing deep basement and above-ground construction at the same time. The plot of land was purchased by developer Henderson Land for $3 billion in 2017, making it the most expensive plot of land ever purchased.

The design has achieved LEED Platinum and WELL Platinum pre-certification together with the highest three-star rating in CHina’s Green Building Rating Program.

 

2 Murray Road foyer and lobby interior spaceRendering: PixelFlakes.

 

Tags

Related Stories

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 23, 2012

Summit Design+Build selected as GC for Chicago restaurant

Little Goat will truly be a multifunctional space.  Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.

| Apr 30, 2012

HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project

HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.

| Apr 20, 2012

Shawmut completes Yard House Restaurant in Boston

12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.

| Apr 6, 2012

Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning

The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.

| Apr 4, 2012

JCJ Architecture designs New York City's first casino

Aqueduct Racetrack complex transformed into modern entertainment destination.

| Apr 3, 2012

Luxury hotel 'groundscraper' planned in abandoned quarry

Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.

| Mar 16, 2012

Temporary fix to CityCenter's Harmon would cost $2 million, contractor says

By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021