flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Zaha Hadid Architects unveils 2 Murray Road in Hong Kong

Mixed-Use

Zaha Hadid Architects unveils 2 Murray Road in Hong Kong

The project reinterprets the structural forms and layering of a Bauhinia bud about to blossom.


By David Malone, Associate Editor | October 2, 2020
2 Murray road exterior facade

Rendering: Arqui9

Zaha Hadid Architects has announced the design of 2 Murray Road, a 36-story, 623-foot-tall project that will rise at the core of Hong Kong’s financial district. The project replaces a multi-story car park to create an urban oasis adjacent to the Chater Garden and is within walking distance to Central and Admiralty MTR metro stations.

The double-height foyer at ground level is arranged for access on multiple levels and welcomes staff and visitors with an interplay of natural light, planting, and organic forms leading up to the second floor public lobby on the city’s elevated walkway network. Suspended above the canopy of its surrounding trees, the lobby’s sculptural glass facade defines a variety of nested spaces. The color palette of these spaces differentiate key destinations within the tower.

 

2 Murray facadeRendering: Cosmocube.

 

A Sky Garden located on the refuge floor is an outdoor recreational space with a running track and an aquaponics planting network that acts as an effective biological air-purifying filter by consuming contaminants. The banqueting hall at the top of the tower offers panoramic views of the city’s surrounding skyline and can host a variety of public and corporate events. The space includes a glazed roof and facade. A high-tensile street structure provides wide span (up to 26 meters) naturally lit, column-free, Grade A office space with five meter floor-to-floor height. 

 

2 Murray foyer and lobby exteriorRendering: MIR.

 

The tower’s base is elevated above the ground to shelter courtyards and gardens cultivated with trees and plants, creating new civic plazas enveloped by nature. The outdoor areas flow into generous interior communal spaces. The curved glass facade enhances the connectivity between the building’s interior and the surrounding gardens and city.

The facade itself is designed to withstand the region’s summer typhoons. It is composed of 4-ply, double-laminated, double-curved insulated glass units to effectively insulate the building and reduce its cooling load and build resilience. These glass units are the first of their kind in Hong Kong.

 

2 Murray exterior top levelsRendering: Cosmocube.

 

Hybrid ventilation is controlled by the building’s automated management system and enables all office levels to be naturally ventilated. This natural ventilation can be supplemented when required with mechanical dehumidification and filtration to further enhance the indoor environment and air quality.

The building’s air quality monitoring system will detect the degree of occupancy in any interior and automatically adjust indoor air temperature, humidity, and fresh air volume to meet demand. The smart systems learn to predict daily occupancy trends to optimize energy demand, ensuring increased efficiencies with lower energy consumption.

Two weather stations will be installed at street level and roof level to monitor real-time outdoor conditions including PM10, PM2.5, ozone, daylight (solar irradiation), wind speed (m/s) rainfall (mm), temperature, humidity (%), and noise (dB). The weather stations will inform occupants of outdoor air quality and are connected to the building’s automated management system to adjust the tower’s hybrid ventilation as required.

A solar responsive ventilator (SRV) along the western perimeter of each floor enhances the comfort of the occupants. The SRV is powered by photovoltaics to create a channel of air that has the ability to adjust solar radiative heat to the perimeter zone.

 

2 Murray Road from ground levelRendering: Arqui9.

 

A 25% reduction in electricity demand will be achieved through the use of smart chiller plant optimization, high-efficiency HVAC equipment, and daylight sensors that reduce the artificial lighting during periods of sufficient natural light.

The project will rebuilt via a top-down construction method to accelerate the redevelopment program on-site by implementing deep basement and above-ground construction at the same time. The plot of land was purchased by developer Henderson Land for $3 billion in 2017, making it the most expensive plot of land ever purchased.

The design has achieved LEED Platinum and WELL Platinum pre-certification together with the highest three-star rating in CHina’s Green Building Rating Program.

 

2 Murray Road foyer and lobby interior spaceRendering: PixelFlakes.

 

Tags

Related Stories

| Aug 11, 2010

ASHRAE introduces building energy label prototype

Most of us know the fuel efficiency of our cars, but what about our buildings? ASHRAE is working to change that, moving one step closer today to introducing its building energy labeling program with release of a prototype label at its 2009 Annual Conference in Louisville, Ky.

| Aug 11, 2010

Urban Land Institute honors five 'outstanding' developments in Europe, Middle East, and Africa

Five outstanding developments have been selected as winners of the Urban Land Institute (ULI) 2009 Awards for Excellence: Europe, Middle East, and Africa (EMEA) competition. This year, the competition also included the announcement of two special award winners. The Awards for Excellence competition is widely regarded as the land use industry’s most prestigious recognition program.

| Aug 11, 2010

Cannon Design’s European-inspired Sparkling Hill Resort breaks ground

Cannon Design, a leading international architectural, engineering and planning firm, is pleased to announce that the firm’s Sparkling Hill Resort and Wellness Hotel in Vernon, BC, has broken ground.

| Aug 11, 2010

10 tips for mitigating influenza in buildings

Adopting simple, common-sense measures and proper maintenance protocols can help mitigate the spread of influenza in buildings. In addition, there are system upgrades that can be performed to further mitigate risks. Trane Commercial Systems offers 10 tips to consider during the cold and flu season.

| Aug 11, 2010

Skanska, Turner most active in U.S. hotel construction, according to BD+C's Giants 300 report

A ranking of the Top 50 Hotel Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

AECOM, Arup, Gensler most active in commercial building design, according to BD+C's Giants 300 report

A ranking of the Top 100 Commercial Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

New book provides energy efficiency guidance for hotels

Recommendations on achieving 30% energy savings over minimum code requirements are contained in the newly published Advanced Energy Design Guide for Highway Lodging.   The energy savings guidance for design of new hotels provides a first step toward achieving a net-zero-energy building.

| Aug 11, 2010

AGC unveils comprehensive plan to revive the construction industry

The Associated General Contractors of America unveiled a new plan today designed to revive the nation’s construction industry. The plan, “Build Now for the Future: A Blueprint for Economic Growth,” is designed to reverse predictions that construction activity will continue to shrink through 2010, crippling broader economic growth.

| Aug 11, 2010

PCL Construction, HITT Contracting among nation's largest commercial building contractors, according to BD+C's Giants 300 report

A ranking of the Top 50 Commercial Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021