flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Constructing an energy-efficient and secure global defense building

Sponsored Content Curtain Wall

Constructing an energy-efficient and secure global defense building

EFCO was approached during a search for highly durable and aesthetically appealing curtain wall and storefront products and used 3-D software technology to design the framing system and determine the size, radius and angle of the project building’s curved glass


By Pella EFCO Commercial Solutions | April 25, 2016

The striking exterior of the BAE Systems facility can be seen for miles. The company’s complex is made up of a four-story office building with an attached 55,000-square-foot prototyping facility. One of the world’s largest global defense, security and aerospace system contractors, BAE Systems developed a plan to consolidate current operations in a highly secure, efficient, modern facility while focusing on employee and customer comfort and accessibility.

 

Construction needed to move quickly due to the impending frigid Michigan winter. With the clock ticking, all teams were challenged to work together to keep the Sterling Heights facility on track and on budget.

 

EFCO was approached during the search for highly durable and aesthetically appealing curtain wall and storefront products. Stepping up to the design challenge and the extra-tight timeline, EFCO used 3-D software technology to design the framing system and determine the size, radius and angle of the building’s curved glass. EFCO also created custom angled horizontals to allow the exterior covers to remain parallel to the ground.

 

The selection of EFCO 5600 curtain wall gave the state-of-art custom exterior its modern appeal, and S433 storefronts and D500 entrance doors provided the desired maximum security. Working through an extremely complex project with an ambitious timeline, EFCO was able to deliver on time and on budget.

 

Project Details

Project: BAE Systems
Location: Sterling Heights, Michigan
Building Type: Business
Type of Construction: New Construction
Primary Opening Type: Curtain Wall
Material Type: Aluminum
Product Type: EFCO 5600 Curtain Wall, S433 Storefront, and D500 Entrances
Architect: Smith Group 

 

Learn more about Pella EFCO Commercial Solutions.

 

 

 

Related Stories

Curtain Wall | Apr 11, 2017

Masters of geometry

Three firms that specialize in façades that curve, twist, and turn see themselves as artisans of the unthinkable.

Sponsored | Curtain Wall | Mar 24, 2016

Prescription for Safety: Fire-Rated Stairwell Provides Light and Life Safety for Medical Center

Visual connectivity between workspaces and natural light, both to be created without sacrificing safety, were focal points in the development of the Clinical Services Pavilion at Cincinnati Children's Medical Center

Curtain Wall | Nov 4, 2015

Curved glass curtains will give Washington, D.C., office building more views and floor space

Around 900 fluted glass panes will cover 2050 M Street, which will contain television studios for CBS.

Sponsored | Curtain Wall | Jul 27, 2015

Steel Curtain Wall System is a Landmark for Justice in Butte County

The curtain wall and cupola mirror the shape of surrounding landforms

Sponsored | Fire-Rated Products | Apr 14, 2015

Fire resistive curtain wall brings maximum light, views and safety to Aspen Art Museum

The curtain wall used for the Shigeru Ban-designed museum provides maximum daylight while protecting the art from fire

Sponsored | | Mar 3, 2015

New York’s Fulton Center relies on TGP for light-flooded, underground transit hub

Fire-rated curtain wall systems filled this subterranean hub with natural light.

Sponsored | | Jan 27, 2015

High-performance insulation brings design freedom, energy efficiency to urban redevelopment project

When developers of Uptown Bay City (Bay City, Mich.) began transforming the former industrial site into a mixed-use, self-sustaining riverfront community, they faced a design challenge. How could they incorporate greater expanses of glass to maximize views of the waterfront without the trade-off in energy efficiency?

| Dec 28, 2014

Robots, drones, and printed buildings: The promise of automated construction

Building Teams across the globe are employing advanced robotics to simplify what is inherently a complex, messy process—construction.

| Oct 2, 2014

Effective use of building enclosure mock-ups within the commissioning process

Engineers from SSR offer advice and guidelines on implementing building enclosure mockups on any project.

| Jul 17, 2014

A harmful trade-off many U.S. green buildings make

The Urban Green Council addresses a concern that many "green" buildings in the U.S. have: poor insulation.

boombox1
boombox2
native1

More In Category



Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021