Legacy Tower at Miami Worldcenter, designed by Kobi Karp, has officially broken ground. The developer claims the project is the first of its kind in the world.
Legacy Tower is a 55-story, $500 million skyscraper that will stretch 600 feet into the sky. The project is described as a COVID-conscious, pandemic-ready, all-in-one, residential, hotel, and medical center skyscraper. It will create a one-of-a-kind residential, hospitality, health, and well-being urban ecosystem.
The project will feature 310 MicroLuxe residences, 219 hotel rooms, and 10 floors of medical facilities. The medical center, which will be dubbed The Blue Zones Medical Center, will span 120,000-sf across the 10 floors and cost $100 million. According to Royal Palm Companies CEO, Daniel Kodsi, the medical center will be the most technologically advanced health and well-being facility in the world. The medical center will include a diagnostic lab testing suite for preemptive health evaluations, an on-site lab, an on-site pharmacy and dispensary, surgery rooms, medically equipped hotel rooms for post-surgical patients, and MRI, CT Scan, mammography, x-ray, and ultrasound imaging facilities.
The hotel and residences space will feature a one-acre urban deck, lounges, restaurants, shops, a spa, a glass-enclosed atrium, and Downtown Miami’s largest hotel swimming pool.
Because the tower will feature a medical-wellness center, hotel, and residences all in one tower, it will create a pandemic-ready space that will allow residents and guests to easily shelter in place. Other COVID-conscious elements include hospital-grade ventilation systems throughout, UV robots, touches technology, voice-activated technology, a water filtration system, and antimicrobial material on all the furniture throughout the project. In the event of a public health emergency, Legacy will be equipped with medical gases and ventilators.
Following the groundbreaking, workers will start drilling deep into the limestone surface of downtown Miami and sink 125-foot-deep steel rebar piles into the ground to serve as the building’s legs. Vertical circulation, elevators, and staircases will be encased in reinforced concrete and move all the way down to the base of the building to create the building’s spine.
The project represents a partnership between Adventist Health, Blue Zones, Accor Hotels, and Royal Palm Companies. Legacy Tower is slated for completion in 2024.
Related Stories
Mixed-Use | Oct 7, 2024
New mixed-use tower by Studio Gang completes first phase of San Francisco waterfront redevelopment
Construction was recently completed on Verde, a new mixed-use tower along the San Francisco waterfront, marking the end of the first phase of the Mission Rock development. Verde is the fourth and final building of phase one of the 28-acre project that will be constructed in several phases guided by design principles developed by a design cohort led by Studio Gang.
Affordable Housing | Oct 4, 2024
3 new affordable housing projects for October 2024
As affordable housing continues to grow, more projects are looking to diversify their footprint by adding mixed-use components, community areas, and more.
Mixed-Use | Sep 19, 2024
A Toronto development will transform a 32-acre shopping center site into a mixed-use urban neighborhood
Toronto developers Mattamy Homes and QuadReal Property Group have launched The Clove, the first phase in the Cloverdale, a $6 billion multi-tower development. The project will transform Cloverdale Mall, a 32-acre shopping center in Toronto, into a mixed-use urban neighborhood.
Mixed-Use | Sep 10, 2024
Centennial Yards, a $5 billion mixed-use development in downtown Atlanta, tops out its first residential tower
Centennial Yards Company has topped out The Mitchell, the first residential tower of Centennial Yards, a $5 billion mixed-use development in downtown Atlanta. Construction of the apartment building is expected to be complete by the middle of next year, with first move-ins slated for summer 2025.
Codes and Standards | Sep 3, 2024
Atlanta aims to crack down on blighted properties with new tax
A new Atlanta law is intended to crack down on absentee landlords including commercial property owners and clean up neglected properties. The “Blight Tax” allows city officials to put levies on blighted property owners up to 25 times higher than current millage rates.
Building Technology | Aug 23, 2024
Top-down construction: Streamlining the building process | BD+C
Learn why top-down construction is becoming popular again for urban projects and how it can benefit your construction process in this comprehensive blog.
Mixed-Use | Aug 21, 2024
Adaptive reuse of a Sears store becomes luxury mixed-use housing
6 Corners Lofts at 4714 W Irving Park Road, Chicago, Ill., opened in March of 2024 as a 394,000-sf adaptive reuse project born out of a former Sears store.
Curtain Wall | Aug 15, 2024
7 steps to investigating curtain wall leaks
It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus.
Adaptive Reuse | Aug 14, 2024
Adaptive reuse revives a former warehouse in St. Louis
The Victor, as the building is now called, has nearly 400 residential apartments.
Adaptive Reuse | Aug 14, 2024
KPF unveils design for repositioning of Norman Foster’s 8 Canada Square tower in London
8 Canada Square, a Norman Foster-designed office building that’s currently the global headquarters of HSBC Holdings, will have large sections of its façade removed to create landscaped terraces. The project, designed by KPF, will be the world’s largest transformation of an office tower into a sustainable mixed-use building.