flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

December 2012: New Project Portfolio

December 2012: New Project Portfolio

New L.A. Fire Station makes sparks along Hollywood Boulevard; senior memory care center opens its doors to Wisconsin communities; and expansion adds 760,000-sf facility to children’s of Alabama hospital.


January 4, 2013
This article first appeared in the December 2012 issue of BD+C.

New L.A. Fire Station makes sparks along Hollywood Boulevard

The new Regional Fire Station No. 82 in Los Angeles was designed by RRM Design Group to complement the eclectic blend of architecture found along Hollywood Boulevard. The three-story, 32,000-sf station contains three heavy-apparatus bays, three paramedic bays, administrative offices, living quarters, and underground parking. A vegetated roofing system captures and treats on-site rainwater before it flows into the storm drainage system. The Building Team also includes Cornerstone Structural Engineering; Brummel, Myrick and Associates (mechanical); Thoma Electric (electrical); KOA Corp. (civil engineering); and Morillo Construction.

[pagebreak]

Senior memory care center opens its doors to Wisconsin communities

After eight months of construction, the new 29,500-sf Waterford (Wis.) Memory Care facility opened its doors to surrounding communities in July. Planned, designed, and built by PDC Midwest, the 31-bed center is situated adjacent to the existing Waterford Senior Living facility. An open dining room and activity spaces take advantage of natural daylight from large skylights. The center also features a large parlor with a stone fireplace, hair salon, and spa. A secured outdoor space allows residents to enjoy the natural beauty of the property.

[pagebreak]

Expansion adds 760,000-sf facility to children’s of Alabama hospital

The Benjamin Russell Hospital for Children is a 12-story, 760,000-sf, $400 million expansion at Children’s of Alabama, the state’s only freestanding pediatric hospital. Located one block north of the existing facility, the new hospital increases Children’s licensed beds from 275 to 332, with an additional 48 bassinets for neonatal intensive care. KLMK Group served as project manager. Other Building Team members included partnerships between HKS Inc. and Giattina Aycock Studio (architect) and Hoar Construction and KBR (construction manager).

[pagebreak]

New location in Lower Manhattan earns LEED Gold for Arup’s office

After relocating to a larger space in January 2012, the New York City office of engineering and consulting firm Arup received LEED Gold certification in October. The 100,000-sf space in Lower Manhattan consists of four floors connected by an internal stairway. Extensive use of LED lighting and daylighting cuts energy consumption, and low-flow toilets contribute to the office’s water efficiency. The project also received points for responsible materials procurement, such as a timber wall in the reception area that was repurposed from the Coney Island boardwalk.

Related Stories

| Jan 28, 2014

2014 predictions for skyscraper construction: More twisting towers, mega-tall projects, and 'superslim' designs

Experts from the Council on Tall Buildings and Urban Habitat release their 2014 construction forecast for the worldwide high-rise industry. 

| Jan 21, 2014

2013: The year of the super-tall skyscraper

Last year was the second-busiest ever in terms of 200-meter-plus building completions, with 73 towers, according to a report by the Council on Tall Buildings and Urban Habitat.

| Aug 30, 2013

Modular classrooms gaining strength with school boards

With budget, space needs, and speed-to-market pressures bearing down on school districts, modular classroom assemblies are often a go-to solution.

| May 1, 2013

World’s tallest children’s hospital pushes BIM to the extreme

The Building Team for the 23-story Lurie Children’s Hospital in Chicago implements an integrated BIM/VDC workflow to execute a complex vertical program.

| Apr 22, 2013

Top 10 green building projects for 2013 [slideshow]

The AIA's Committee on the Environment selected its top ten examples of sustainable architecture and green design solutions that protect and enhance the environment.

| Apr 19, 2013

Must see: Shell of gutted church on stilts, 40 feet off the ground

Construction crews are going to extremes to save the ornate brick façade of the Provo (Utah) Tabernacle temple, which was ravaged by a fire in December 2010.

| Apr 16, 2013

5 projects that profited from insulated metal panels

From an orchid-shaped visitor center to California’s largest public works project, each of these projects benefited from IMP technology.

| Apr 12, 2013

Nation's first 'food forest' planned in Seattle

Seattle's Beacon Food Forest project is transforming a seven-acre lot in the city’s Beacon Hill neighborhood into a self-sustaining, edible public park.

| Apr 10, 2013

23 things you need to know about charter schools

Charter schools are growing like Topsy. But don’t jump on board unless you know what you’re getting into.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021