flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Detroit's tallest tower to rise at site of former J.L Hudson's Department Store

High-rise Construction

Detroit's tallest tower to rise at site of former J.L Hudson's Department Store

SHoP Architects and Hamilton Anderson Associates will design the 52-story building.


By David Malone, Associate Editor | March 3, 2017

Rendering courtesy of SHoP Architects Bedrock Detroit

J.L. Hudson’s Department Store was one of the premier locations in the heart of downtown Detroit in the 1970s and 1980s. After closing in 1983, however, it has sat as one of the few vacant sites in downtown Detroit.

But the site is about to be vacant no longer, as a new design from SHoP Architects and Hamilton Anderson Associates calls for a 52-story mixed-use building to rise and create a new destination location in the heart of Detroit.

The building, which will stretch 734-feet into the sky and become Detroit’s tallest tower, will offer 250 residential units totaling 441,500 GSF. A nine-story, 176-foot podium will contain another 733,823 GSF for use as commercial, office, technology, and arts and culture space. An additional three stories will be located below grade and comprise more commercial space and 700 parking spots. About two-thirds of the first underground floor will be used as a market. The remainder of the first underground floor, as well as the second and third floors, will be used for parking. In total, the building will provide 1.2 million GSF.

The Hudson’s Site building will be one of the largest construction projects in Detroit in decades and will attempt to once again turn the Woodward Avenue site into a premier location in the city. The new mixed-use tower is expected to attract visitors, create thousands of jobs, and lure talent, business, and investment opportunities. Bedrock Detroit, the project’s developer, estimates the project will create 5,800 jobs during the construction phase and 3,000 new permanent jobs. It is also estimated the Hudson’s Site project will create $560 million in annual economic output.

The Downtown Development Authority was presented with plans for the site and has approved the timeline for the groundbreaking of the development by Dec. 1, 2017.

 

Rendering courtesy of SHoP Architects and Bedrock Detroit.

 

Rendering courtesy of SHoP Architects and Bedrock Detroit.

 

Rendering courtesy of Bedrock Detroit.

 

Rendering courtesy of SHoP Architects and Bedrock Detroit.

 

Rendering courtesy of SHoP Architects and Bedrock Detroit.

Related Stories

High-rise Construction | Jan 18, 2019

‘Paramount’ will become Nashville’s tallest tower

Goettsch Partners is the project’s architect.

High-rise Construction | Jan 14, 2019

AS+GG-designed tower will be the tallest in China

The tower is at the center of the Shimao Longgang Master Plan.

High-rise Construction | Jan 10, 2019

Indoor-outdoor amenities open leasing value at a San Francisco skyscraper

The amenities that set this 605-foot-tall building apart are its 50,000 sf of outdoor and open spaces that include 14 skydecks and large terraces on its 12th and 28th floors.

High-rise Construction | Dec 13, 2018

Record number of 'supertall' towers were completed in 2018

Citic Tower in Beijing and Vincom Landmark 81 in Ho Chi Minh City are among 18 "supertall" skyscrapers completed this year—a record number, according to the Council on Tall Buildings and Urban Habitat. 

High-rise Construction | Aug 27, 2018

The world’s tallest buildings with dampers

The CTBUH created the list as part of a recent study.

High-rise Construction | Aug 8, 2018

Bjarke Ingels Group’s new Shenzhen tower includes a folded building envelope

The new skyscraper is the home of Shenzhen Energy Company.

Multifamily Housing | Aug 7, 2018

Even after redevelopment, the iconic 'Chicago Tribune' sign will remain at 435 N. Michigan Ave.

The newspaper and the building's new owners reached a settlement.

Lighting | Aug 1, 2018

Willis Tower upgrades antenna lighting

The new lights will save Willis Tower more than 70% in antenna-lighting energy costs.

High-rise Construction | Jul 31, 2018

A 350-foot waterfall splashes down from a skyscraper in China

The tower is located in Guiyang’s central business district.

High-rise Construction | Jul 10, 2018

SOM-designed 100 Leadenhall Street will be one of the tallest buildings in the U.K.

The tower will rise in the City of London’s eastern cluster.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021