flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Exclusive villas and spa in China will be built at the center of a lake

Hotel Facilities

Exclusive villas and spa in China will be built at the center of a lake

The only connection between the complex and the mainland will be a narrow pedestrian bridge.


By David Malone, Associate Editor | March 7, 2016

Rendering courtesy Luxigon

Schmidt Hammer Lassen Architects has taken the idea of a structure being built ā€œon the lakeā€ quite literally with its recently revealed plans for a granite clubhouse and spa complex located directly on top of a lake. The 34,014-sf space will be built at the center of a lake in the southern China district of GaoYao and will eventually become an art gallery, spa, and lounge, serving residents of nearby exclusive villas, according to Dezeen.

The goal is not to make the structure look as if it is sitting on top of the lake but, instead, to make it an integrated part of the lake.

The complex will consist of three concave blocks with each block being connected to another via one of its corners. From above, the overall design looks like a giant lobster with two meaty claws, which is fitting, considering its aquatic locale. Specifically, the building will be located on the edge ofĀ a weir that controls the lake level. The only connection between the complex and the mainland will be a narrow pedestrian bridge.

The building will use its location in the center of a lake and its framed panoramic views in an effort to quickly connect visitors to the surrounding landscape. To make the most of these panoramic views, a Feng Shui expert was brought in to determine the buildingā€™s orientation within the build site and the direction of its entrances.

Due to the beauty the surrounding mountainous landscape offers, an open, column-free layout will be used in tandem with floor-to-ceiling glazing.

The buildingā€™s three parts will feature different amenities and facilities, but will be visually linked by light oak floors and gray granite walls that will be carried throughout the complex.

The complex is expected to be completed in early 2017 and is currently under construction.

Ā 

Rendering: Luxigon

Related Stories

Hotel Facilities | Oct 22, 2019

Modular, collapsable hotel pods can be built in citiesā€™ interstitial spaces

Connectic by Cooper Carry recently won the 2019 Radical Innovation Award.

Hotel Facilities | Sep 24, 2019

A series of glass ā€˜igloosā€™ create the worldā€™s northernmost hotel

Luxury Action, a private travel company, is behind the project.

Giants 400 | Sep 5, 2019

Top 85 Hotel Sector Construction Firms for 2019

Suffolk, Yates Companies, AECOM, Swinerton, and Turner top the rankings of the nation's largest hotel sector contractors and construction management firms, as reported inĀ Building Design+Construction's 2019 Giants 300 Report.

Giants 400 | Sep 5, 2019

Top 70 Hotel Sector Engineering Firms for 2019

NV5, EXP, Jensen Hughes, KPFF, and Thornton Tomasetti head the rankings of the nation's largest hotel sector engineering and engineering architecture (EA) firms, as reported inĀ Building Design+Construction's 2019 Giants 300 Report.

Giants 400 | Sep 5, 2019

Top 110 Hotel Sector Architecture Firms for 2019

Gensler, WATG, HKS, HBG Design, and Steelman Partners top the rankings of the nation's largest hotel sector architecture and architecture engineering (AE) firms, as reported inĀ Building Design+Construction's 2019 Giants 300 Report.

AEC Innovators | Aug 27, 2019

7 AEC industry disruptors and their groundbreaking achievements

From building prefab factories in the sky to incubating the next generation of AEC tech startups, our 2019 class of AEC Innovators demonstrates that the industry is poised for a shakeup. Meet BD+Cā€™s 2019 AEC Innovators.

AEC Innovators | Aug 13, 2019

Stacking the deck: Marriott International embraces modular construction

The hotel giant has more than 50 projects in the works that incorporate prefab guestrooms or bathrooms.

Hotel Facilities | Jul 31, 2019

Hotels are taking steps to curtail their energy and water appetites

But owners and operators must be on the same page to achieve meaningful sustainability, says a new ULI report.

Building Tech | Jun 26, 2019

Modular construction can deliver projects 50% faster

Modular construction can deliver projects 20% to 50% faster than traditional methods and drastically reshape how buildings are delivered, according to a new report from McKinsey & Co.

Design Innovation Report | Jun 25, 2019

2019 Design Innovation Report: Super labs, dream cabins, office boardwalks, faƧades as art

9 projects that push the limits of architectural design, space planning, and material innovation.

boombox1
boombox2
native1

More In Category



3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of ā€œprintingā€ structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the worldā€™s first 3D-printed hotel is under construction at an existing hotel and campground site.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Ā