flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gloucester Cathedral to install commercial sized solar PV system on its roof

Sustainability

Gloucester Cathedral to install commercial sized solar PV system on its roof

Mypower will install 150 solar panels on the roof, making it the oldest cathedral in the UK, and possible the world, with this type of solar power system.


By David Malone, Associate Editor | September 29, 2016

Gloucester Cathedral, a building famous for hosting the Coronation of King Henry III, being the final resting place of King Edward II, and, more recently, appearing in three Harry Potter films and an episode of Sherlock, is set to become the oldest cathedral in the UK to install a commercial sized solar PV system on its roof.

Thanks to money from the Heritage Lottery Fund, Gloucester Cathedral is about to undergo a £6million development project with the installation of solar PV front and center. Mypower, a Gloucestershire-based company, was awarded the contract to add 150 solar panels to the roof of the Cathedral. Specifically, the panels will be added to the 30-meter high Nave roof, which was built almost 1,000 years ago, and will be impossible to see from the surrounding area.

The Church of England’s Shrinking the Footprint campaign wants to reduce its carbon emissions by 80% by 2050. The Cathedral’s new 42kW solar array will contribute to the overall goal of the Church of England by reducing energy costs by 25% for the historic structure.

There are some significant shading issues, however, due to the Cathedral’s design. Mypower used animated graphics to demonstrate the shading at different times of the day and year in order to find the right balance between capital cost and electricity yield.

In early October, Mypower will begin installing the panels with commissioning following four weeks later.

Related Stories

Multifamily Housing | Oct 25, 2016

The Beacon will become the most sustainable residential tower in the world

Lumiere Developments says the building will generate enough energy to offer residents ‘Free Energy For Life.’

Urban Planning | Oct 20, 2016

Despite troubled development, Masdar City forges ahead

The detailed master plan for Phase 2 of Masdar City has been unveiled by CBT.

Green | Oct 12, 2016

Acting as a giant air purifier, this tower could help solve China’s pollution problem

The 23-ft tall tower operates almost entirely on wind energy.

Codes and Standards | Oct 10, 2016

New sustainable landscape development and management credential launched

GBCI offered the first testing opportunity Oct. 3 at Greenbuild

Codes and Standards | Oct 6, 2016

Obama administration will spend $80 million for smart cities initiatives

The technology is targeted for climate, transportation, resiliency.

Green | Oct 4, 2016

The Clear Orb is one of the shortlisted projects for 2016 Land Art Generator Initiative

Designed by Heerim Architects & Planners, The Clear Orb would produce just under 600 million gallons of clean water annually.

Sustainability | Oct 4, 2016

One World Trade Center officially awarded LEED Gold certification

The skyscraper received the certification despite a setback caused by Hurricane Sandy.

Industry Research | Oct 3, 2016

Structure Tone survey shows cost is still a major barrier to building green

Climate change, resilience and wellness are also growing concerns.

Sponsored | Coatings | Oct 3, 2016

Pioneers in achieving LEED certification

The Animal Community Center in Milpitas, Calif. sought to be the first LEED Gold building of its kind in the country.

Sustainability | Oct 3, 2016

Gensler-designed auto dealership to become world’s first to reach net zero

Toyota of Corvallis has also joined a few other Toyota dealerships around the country to achieve LEED Platinum certification.

boombox1
boombox2
native1

More In Category


Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021