Gloucester Cathedral, a building famous for hosting the Coronation of King Henry III, being the final resting place of King Edward II, and, more recently, appearing in three Harry Potter films and an episode of Sherlock, is set to become the oldest cathedral in the UK to install a commercial sized solar PV system on its roof.
Thanks to money from the Heritage Lottery Fund, Gloucester Cathedral is about to undergo a £6million development project with the installation of solar PV front and center. Mypower, a Gloucestershire-based company, was awarded the contract to add 150 solar panels to the roof of the Cathedral. Specifically, the panels will be added to the 30-meter high Nave roof, which was built almost 1,000 years ago, and will be impossible to see from the surrounding area.
The Church of England’s Shrinking the Footprint campaign wants to reduce its carbon emissions by 80% by 2050. The Cathedral’s new 42kW solar array will contribute to the overall goal of the Church of England by reducing energy costs by 25% for the historic structure.
There are some significant shading issues, however, due to the Cathedral’s design. Mypower used animated graphics to demonstrate the shading at different times of the day and year in order to find the right balance between capital cost and electricity yield.
In early October, Mypower will begin installing the panels with commissioning following four weeks later.
Related Stories
Multifamily Housing | Oct 25, 2016
The Beacon will become the most sustainable residential tower in the world
Lumiere Developments says the building will generate enough energy to offer residents ‘Free Energy For Life.’
Urban Planning | Oct 20, 2016
Despite troubled development, Masdar City forges ahead
The detailed master plan for Phase 2 of Masdar City has been unveiled by CBT.
Green | Oct 12, 2016
Acting as a giant air purifier, this tower could help solve China’s pollution problem
The 23-ft tall tower operates almost entirely on wind energy.
Codes and Standards | Oct 10, 2016
New sustainable landscape development and management credential launched
GBCI offered the first testing opportunity Oct. 3 at Greenbuild
Codes and Standards | Oct 6, 2016
Obama administration will spend $80 million for smart cities initiatives
The technology is targeted for climate, transportation, resiliency.
Green | Oct 4, 2016
The Clear Orb is one of the shortlisted projects for 2016 Land Art Generator Initiative
Designed by Heerim Architects & Planners, The Clear Orb would produce just under 600 million gallons of clean water annually.
Sustainability | Oct 4, 2016
One World Trade Center officially awarded LEED Gold certification
The skyscraper received the certification despite a setback caused by Hurricane Sandy.
Industry Research | Oct 3, 2016
Structure Tone survey shows cost is still a major barrier to building green
Climate change, resilience and wellness are also growing concerns.
Sponsored | Coatings | Oct 3, 2016
Pioneers in achieving LEED certification
The Animal Community Center in Milpitas, Calif. sought to be the first LEED Gold building of its kind in the country.
Sustainability | Oct 3, 2016
Gensler-designed auto dealership to become world’s first to reach net zero
Toyota of Corvallis has also joined a few other Toyota dealerships around the country to achieve LEED Platinum certification.