This audacious project involved the reimagining and repositioning of an outmoded, parking-lot-dominated office campus, formerly occupied by the National Geospatial Intelligence Agency, into a quiet, naturalistic setting for the Defense Intelligence Agency. The project brings together 16 intelligence agencies for education, training, and exchanges of data.
At the heart of the transformation is a new Z-shaped, 220,000-sf structure, the Centrum Building, which links the three existing buildings and serves as the vertebra of the entire campus. The existing buildings were re-skinned to create a cohesive exterior aesthetic for the 750,000-sf campus.
The sea of parking spaces was replaced by natural landscaping, which provides camouflage from the neighboring buildings, and a multi-story parking garage.
The rich metal panel exterior design was inspired by the site’s wooded surroundings. The deeply matted finish minimizes light reflection, strengthening the sense of camouflage.
Building Team – Submitting firm, design architect Leo A Daly Owner U.S. Defense Intelligence Agency Architects and engineers of record AECOM, EwingCole Interior architect DBI Architects Landscape architects Oehme van Sweden, Wiley|Wilson Program manager Markon Solutions Design-builder Contractor Whiting-Turner Contracting Co.
General Information – Size 750,000 sf Cost Withheld at client’s request Construction time April 2012 to May 2016 (projects ongoing through 2018) Delivery method Design-build
Related Stories
| Aug 29, 2022
Montana becomes first U.S. state to approve 3D printing in construction
Montana is the first U.S. state to give broad regulatory approval for 3D printing in building construction.
Architects | Apr 22, 2022
Top 10 green building projects for 2022
The American Institute of Architects' Committee on the Environment (COTE) has announced its COTE Top Ten Awards for significant achievements in advancing climate action.
Concrete Technology | Apr 19, 2022
SGH’s Applied Science & Research Center achieves ISO 17025 accreditation for concrete testing procedures
Simpson Gumpertz & Heger’s (SGH) Applied Science & Research Center recently received ISO/IEC17025 accreditation from the American Association for Laboratory Accreditation (A2LA) for several concrete testing methods.
2021 Building Team Awards | Jan 14, 2022
First public-private partnership project in Veterans Administration history saves $34 million in costs
LEO A DALY and McCarthy Building Companies head the project team for the Omaha VA Ambulatory Care Center in BD+C’s 2021 Building Team Awards.
Building Team Awards | Dec 8, 2021
A performing arts center celebrates a legendary rocker and his birthplace
Buddy Holly Hall in Texas receives BD+C’s Silver Building Team Award.
Building Team Awards | Dec 7, 2021
A rapid response to a health emergency
Baptist Hospital of Miami’s 233-bed Hope Tower receives BD+C’s Bronze Building Team Award
Building Team Awards | Dec 3, 2021
Putting science on display, thanks to a design-build approach
UC Riverside’s Plant Growth Environments Facility receives BD+C’s Bronze Building Team Award.
Building Team Awards | Dec 2, 2021
An academic ‘precinct’ brings arts and sciences together
Wofford College’s Chandler Center for Environmental Studies receives BD+C’s Silver Building Team Award.
Building Team Awards | Dec 1, 2021
Denver sets the bar for water reclamation and reuse
A new administration building for the city’s water utility company scores Platinum in BD+C’s 2021 Building Team Awards.
2021 Building Team Awards | Nov 17, 2021
Caltech's new neuroscience building unites scientists, engineers to master the human brain
The Tianqiao and Chrissy Chen Institute for Neuroscience at the California Institute of Technology in Pasadena wins a Gold Award in BD+C's 2021 Building Team Awards.