This audacious project involved the reimagining and repositioning of an outmoded, parking-lot-dominated office campus, formerly occupied by the National Geospatial Intelligence Agency, into a quiet, naturalistic setting for the Defense Intelligence Agency. The project brings together 16 intelligence agencies for education, training, and exchanges of data.
At the heart of the transformation is a new Z-shaped, 220,000-sf structure, the Centrum Building, which links the three existing buildings and serves as the vertebra of the entire campus. The existing buildings were re-skinned to create a cohesive exterior aesthetic for the 750,000-sf campus.
The sea of parking spaces was replaced by natural landscaping, which provides camouflage from the neighboring buildings, and a multi-story parking garage.
The rich metal panel exterior design was inspired by the site’s wooded surroundings. The deeply matted finish minimizes light reflection, strengthening the sense of camouflage.
Building Team – Submitting firm, design architect Leo A Daly Owner U.S. Defense Intelligence Agency Architects and engineers of record AECOM, EwingCole Interior architect DBI Architects Landscape architects Oehme van Sweden, Wiley|Wilson Program manager Markon Solutions Design-builder Contractor Whiting-Turner Contracting Co.
General Information – Size 750,000 sf Cost Withheld at client’s request Construction time April 2012 to May 2016 (projects ongoing through 2018) Delivery method Design-build
Related Stories
Building Team Awards | May 22, 2018
LA's game changer: Wilshire Grand Center
Silver Award: This billion-dollar mixed-use tower will alter the Los Angeles skyline in more ways.
Building Team Awards | May 21, 2018
Campus builder: Everett University Center at Washington State University
Silver Award: WSU kicks off its new branch campus with a high-tech innovation center designed to engage students, businesses, and the community.
Building Team Awards | May 21, 2018
Promise fulfilled: Park West, Texas A&M University
Silver Award: A P3-driven team completes this mega off-campus student housing complex ahead of its fast-track schedule.
Building Team Awards | May 18, 2018
Prognosis: Positive: Rutgers University-Camden Nursing and Science Building
Gold Award: Can a new nursing school breathe life into America’s third-poorest city?
Building Team Awards | May 17, 2018
Patient priorities: Cleveland Clinic Taussig Cancer Center
Gold Award: Cleveland Clinic’s new cancer center is a transparent, collaborative hub for improved patient experiences and enhanced communication with caregivers.
Building Team Awards | May 16, 2018
Game, set, match: United States Tennis Association National Campus
Gold Award: With 100 courts and more than 260,000 sf of vertical construction, the USTA National Campus is a sanctuary for tennis enthusiasts.
Building Team Awards | May 15, 2018
High court, big impact: San Diego Central Courthouse
Gold Award: San Diego’s high-rise courthouse increases access to justice for citizens by consolidating 71 court departments.
Building Team Awards | May 14, 2018
Sweat equity marks landscaping effort
The design was grounded in therapeutic landscape and environmental psychology theory.
Building Team Awards | May 14, 2018
Rethinking prison design: Iowa Correctional Institution for Women
Platinum Award: Iowa's new women's correctional institution offers a revolutionary model for rehabilitating female inmates.
Building Team Awards | May 14, 2018
Dream delivered: McCormick Square Marriott Marquis and Wintrust Arena
Platinum Award: A daring hotel and sports development in Chicago’s South Loop aims to invigorate the city’s convention business.