This audacious project involved the reimagining and repositioning of an outmoded, parking-lot-dominated office campus, formerly occupied by the National Geospatial Intelligence Agency, into a quiet, naturalistic setting for the Defense Intelligence Agency. The project brings together 16 intelligence agencies for education, training, and exchanges of data.
At the heart of the transformation is a new Z-shaped, 220,000-sf structure, the Centrum Building, which links the three existing buildings and serves as the vertebra of the entire campus. The existing buildings were re-skinned to create a cohesive exterior aesthetic for the 750,000-sf campus.
The sea of parking spaces was replaced by natural landscaping, which provides camouflage from the neighboring buildings, and a multi-story parking garage.
The rich metal panel exterior design was inspired by the site’s wooded surroundings. The deeply matted finish minimizes light reflection, strengthening the sense of camouflage.
Building Team – Submitting firm, design architect Leo A Daly Owner U.S. Defense Intelligence Agency Architects and engineers of record AECOM, EwingCole Interior architect DBI Architects Landscape architects Oehme van Sweden, Wiley|Wilson Program manager Markon Solutions Design-builder Contractor Whiting-Turner Contracting Co.
General Information – Size 750,000 sf Cost Withheld at client’s request Construction time April 2012 to May 2016 (projects ongoing through 2018) Delivery method Design-build
Related Stories
Building Team Awards | Jun 24, 2019
14 projects earn BD+C's 2019 Building Team Awards
The McDonald's Headquarters, the Rancho Los Amigos National Rehabilitation Center, and Pacific Visions at the Aquarium of the Pacific are three of the projects awarded with BD+C's 2019 Building Team Awards.
Building Team Awards | Jun 21, 2019
Up, up and away: Dutch hospitality chain completes the world's tallest modular hotel
Honorable mention: At 21 stories (15 of them modular), it is the world’s tallest modular hotel.
Building Team Awards | Jun 20, 2019
PPP gets the job done: Three-party deal saves time and money for client
Bronze Award: Weitz, acting as developer and design-builder, leased the land and borrowed the money for the project.
Building Team Awards | Jun 20, 2019
Making waves: The façade of Pacific Visions suggests the movement of water, day and night
Bronze Award: The new wing holds an exhibition space, a state-of-the-art 300-seat theater with a 32-foot-tall, 180-degree arc, 130-foot-long projection wall.
Building Team Awards | Jun 19, 2019
Unsung heroes: Two hurricanes couldn't stop this project team
Bronze Award: St. Lucie County’s population exploded to the point where the hospital needed lots more space.
Building Team Awards | Jun 19, 2019
Crime fighter: San Diego County's new forensic facility helps battle crime in three ways
Silver Award: The 158,000-sf addition collocates three crime-fighting functions.
Building Team Awards | Jun 18, 2019
All that urban jazz: Mixed-use center lends a zing to downtown Washington's skyline
Bureaucratic architecture, be damned!
Building Team Awards | Jun 18, 2019
Eyesore no more: People come together to expand a much-needed daycare center
Silver Award: Two problems quickly emerged: high concentrations of arsenic in the soil, and stormwater runoff into nearby wetlands and neighboring properties.
Building Team Awards | Jun 17, 2019
Campus renewal: Community effort saves a crucial healthcare resource
Silver Award: Taylor Design (architect) and SmithGroup (AOR) led an integrated design-build team anchored by McCarthy Building Companies (GC).
Building Team Awards | Jun 13, 2019
In the spotlight: Kinder High School for the Performing and Visual Arts shines a new beacon on Houston’s downtown
Gold Award: Kinder High School, which can accommodate 750 9th through 12th graders, is one of only three public schools in the U.S. that offer programs for both visual and performing arts.