This audacious project involved the reimagining and repositioning of an outmoded, parking-lot-dominated office campus, formerly occupied by the National Geospatial Intelligence Agency, into a quiet, naturalistic setting for the Defense Intelligence Agency. The project brings together 16 intelligence agencies for education, training, and exchanges of data.
At the heart of the transformation is a new Z-shaped, 220,000-sf structure, the Centrum Building, which links the three existing buildings and serves as the vertebra of the entire campus. The existing buildings were re-skinned to create a cohesive exterior aesthetic for the 750,000-sf campus.
The sea of parking spaces was replaced by natural landscaping, which provides camouflage from the neighboring buildings, and a multi-story parking garage.
The rich metal panel exterior design was inspired by the site’s wooded surroundings. The deeply matted finish minimizes light reflection, strengthening the sense of camouflage.
Building Team – Submitting firm, design architect Leo A Daly Owner U.S. Defense Intelligence Agency Architects and engineers of record AECOM, EwingCole Interior architect DBI Architects Landscape architects Oehme van Sweden, Wiley|Wilson Program manager Markon Solutions Design-builder Contractor Whiting-Turner Contracting Co.
General Information – Size 750,000 sf Cost Withheld at client’s request Construction time April 2012 to May 2016 (projects ongoing through 2018) Delivery method Design-build
Related Stories
Architects | Jan 18, 2016
EHDD’s Monterey Bay Aquarium wins AIA Twenty-five Year Award
The aquarium set new technical standards for the building type, which still influence today, such as the flow-through seawater-based heat pump system, naturalistic exhibitions, and corrosion protection.
Building Team Awards | Apr 10, 2015
14 projects that push AEC teaming to the limits
From Lean construction to tri-party IPD to advanced BIM/VDC coordination, these 14 Building Teams demonstrate the power of collaboration in delivering award-winning buildings. These are the 2015 Building Team Award winners.
Building Team Awards | Apr 10, 2015
Prefab saves the day for Denver hospital
Mortenson Construction and its partners completed the 831,000-sf, $623 million Saint Joseph Hospital well before the January 1, 2015, deadline, thanks largely to their extensive use of offsite prefabrication.
Building Team Awards | Apr 10, 2015
Anaheim’s soaring intermodal hub
Anaheim's Regional Transportations Intermodal Center is the largest ETFE project in North America.
Building Team Awards | Apr 10, 2015
Virtual collaboration helps complete a hospital in 24 months
PinnacleHealth needed a new hospital STAT! This team delivered it in two years, start to finish.
Building Team Awards | Apr 10, 2015
New arts venue reinvigorates Virginia Tech's campus
The STV-led Building Team creates a world-class performance and arts venue with learning and entrepreneurial dimensions.
Building Team Awards | Apr 9, 2015
Multifaced fitness center becomes campus landmark
A sloped running track and open-concept design put this Building Team to the test.
Building Team Awards | Apr 9, 2015
Nation's first LEED-certified bus depot
A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.
Building Team Awards | Apr 9, 2015
Setting the bar for port-of-entry design
Whenever you eat a tomato from Mexico, there’s a one-in-three chance it came through this LEED Gold gateway.
Building Team Awards | Apr 9, 2015
Big D’s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C
Dallas’s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.