flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Ground-up mixed-use building completes near Wrigley Field

Mixed-Use

Ground-up mixed-use building completes near Wrigley Field

Hirsch/MPG Architecture + Planning designed the project.


By David Malone, Managing Editor | October 5, 2021
1111 W Addison exterior mixed-use space in Wrigleyville
Photos: Loggy Media

A new ground-up, four-story commercial project has recently completed at 1111 W. Addison in Wrigleyville, near the intersection of Addison and Clark Street.

The mixed-use project includes retail on the ground floor and a fitness center and bouldering center on the second through fourth floors. The 59,000-sf building is located just steps from Wrigley Field on the site of the old Wrigleyville Taco Bell (a new Taco Bell is located on the ground floor of the new building’s retail space).

Interior of 1111 W Addison

The 41,895-sf climbing gym is home to Movement Wrigleyville, a climbing, yoga, and fitness center. The center includes three floors of climbing walls wrapped around a central atrium, a yoga studio, locker rooms, various spaces with fitness equipment, and a support office.

In addition to Hirsch/MPG Architecture + Planning, the build team also included Summit Design + Build as the general contractor.

Tags

Related Stories

Mixed-Use | Nov 11, 2021

New mixed-use development breaks ground in Miami Beach

Domo Studio is designing the project and Origin Construction is the general contractor.

Mixed-Use | Oct 22, 2021

40 West 12th residential tower opens in Atlanta’s Midtown neighborhood

The project is part of the 1105 West Peachtree Development.

Multifamily Housing | Oct 20, 2021

Sacramento’s first luxury high-rise rental residences announced

Southern Land Company is developing the project.

Mixed-Use | Oct 11, 2021

Manhattan West opens the heart of New York City’s Far West Side

The project links several New York neighborhoods.

Mixed-Use | Sep 28, 2021

BIG designs new Farfetch HQ on the slopes of Leça River in Porto

The project is situated within the larger Fuse Valley site.

Mixed-Use | Aug 19, 2021

COVID-conscious, pandemic-ready skyscraper breaks ground in Miami

The project will be part of Miami Worldcenter.

Mixed-Use | Aug 4, 2021

Diamond Schmitt to lead design for Therme Canada | Ontario Place redevelopment

The project will be a year-round waterfront destination.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021