flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

High Tech High International used to be a military facility

High Tech High International used to be a military facility

San Diego, Calif.


By Barbara Horwitz-Bennett | August 11, 2010
This article first appeared in the 200510 issue of BD+C.

High Tech High International, reconstructed inside a 1952 Navy metal foundry training facility, incorporates the very latest in teaching technology with a centerpiece classroom known as the UN Theater, which is modeled after the UN chambers in New York.

The interior space, which looks more like a hip advertising studio than a public high school, provides informal, flexible seating areas, abundant windows to create a connection to the outside world, and flexible studio areas supporting alternative teaching methods.

As part of a larger mixed-use development on the site of Liberty Station—a former U.S. Navy training base in San Diego—converting the old metal foundry into a public high school required the Building Team to remove old machinery, cover wall penetrations, and bridge large underfloor cisterns.

Fortunately, the front of the original building, a two-story open space with large windows, lent itself to the creation of a light-filled, open lobby area, called the Commons, used for school gatherings, performances, and art exhibits. A trendy-looking catwalk extends across the space, flanked by administrative offices and conference rooms with large windows. The exposed HVAC and lighting systems add to the high-tech industrial feel of the space.

Also above the Commons floor is a curving staircase that wraps around the UN Theater. With its state-of-the-art presentation technology, this internationally themed space has become a sought-after meeting place for private groups, making it a revenue generator for the school.

The classrooms are arranged in grade-specific clusters around a studio area, with each classroom connected to the teacher's office. Twenty-five-foot sliding partitions, which double as marker boards and projection screens, support team teaching.

Prior to the design phase, the Building Team held an intensive design workshop with all major players, including the students. Design-build was chosen as the delivery method to allow for the design process to coincide with this collaboration, in addition to the historical analysis of the site and foundry.

"Because of the degree of community involvement and the various interest groups involved, it required that the architect and contractor be very much engaged early on," said panel judge Terry Krause, Berglund Construction, Chicago.

To create a globally focused school, the Building Team chose environmentally sensitive materials, such as OSB as finish cladding for the exterior of the UN Theater drum structure, Forest Stewardship Council-certified wood, and Kirei board, an engineered panel made from stalks of the sorghum plant, for the reception desk.

Now entering its second academic year, this 28,000-sf charter school, built at a cost of $4.2 million, supports both structured and informal student/faculty interaction with its unique layout of classrooms, studios, informal seating areas, and multi-purpose spaces.

Related Stories

K-12 Schools | Apr 7, 2017

Is an alternative project delivery method right for your K-12 school district?

With California’s increasingly busy—and costly—construction market, it’s becoming more difficult to predict costs with a typical design-bid-build delivery method.

K-12 Schools | Mar 9, 2017

The future of education facilities: Creating spaces where learning happens everywhere

The art of designing schools lies not in just understanding what makes a functional classroom, but in how successful we are in creating a wide array of educational options for teachers and students within the school environment.

K-12 Schools | Mar 9, 2017

School branding: The impact on identity and engagement

What is school branding and why is it important? HMC Architects’ James Krueger and Barbara Perez weigh in on the topic.

K-12 Schools | Feb 22, 2017

Through the principal's eyes: A look at K-12 architecture

Anderson-Livsey is a K-5 school located about 30 minutes East of Atlanta in Gwinnett County and has an enrollment of 785 students. 

K-12 Schools | Feb 8, 2017

'Fabrication Hall' introduces Wyoming high school students to career paths

The hall offers bountiful natural light with enough space to build large-scale projects.

Architects | Jan 19, 2017

Harley Ellis Devereaux merges with Deems Lewis McKinley

The combination is expected to bolster HED’s presence in northern California and the K-12 sector.

K-12 Schools | Dec 14, 2016

Expanding possibilities for America's K-12 schools

Bigger buildings, more outdoor space, and greater involvement from the private sector are among the trends marking the new generation of schools. 

K-12 Schools | Dec 12, 2016

Building a nation of super schools

AEC teams are being asked to design and build schools with enough flexibility to adapt to changing pedagogies.

School Construction | Oct 23, 2016

As construction rebounds, education sector spending flattens

Post-recession slump suggests a settling in at a “normal” level similar to the mid aughts.

Great Solutions | Aug 23, 2016

Novel construction approach speeds K-12 school projects

The Folia system uses pre-engineered components to deliver school buildings at 20% less cost. 

boombox1
boombox2
native1

More In Category



K-12 Schools

Designing for dyslexia: How architecture can address neurodiversity in K-12 schools

Architects play a critical role in designing school environments that support students with learning differences, particularly dyslexia, by enhancing social and emotional competence and physical comfort. Effective design principles not only benefit students with dyslexia but also improve the learning experience for all students and faculty. This article explores how key design strategies at the campus, classroom, and individual levels can foster confidence, comfort, and resilience, thereby optimizing educational outcomes for students with dyslexia and other learning differences.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021