flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

A Houston office park gets a new life as a private day school

K-12 Schools

A Houston office park gets a new life as a private day school

Shepley Bulfinch designed the 75,000-sf campus.


By David Malone, Associate Editor | October 2, 2017
​View from classrooms (Building A) to learning platforms and play area at the Awty International School in Houston

​View from classrooms (Building A) to learning platforms and play area at the Awty International School in Houston. Photo: Shepley Bulfinch

A new 75,000-sf Early Learning Campus, designed specifically for The Awty International School’s pre-K through first grade students, recently opened in Houston. Shepley Bulfinch’s design created the new campus from a vacant 30-year-old office park that sits on a 5.25-acre site.

The office park had three existing buildings in a U-shaped configuration that created a natural enclosed pocket for Shepley Bulfinch to focus the learning and enrichment facilities for the 345 pre-K, kindergarten, and first grade students. Two-thirds of the existing parking lot in this pocket was replaced with synthetic turf to create a 20,000-sf outdoor play space. The remaining third was left for use as a visitor parking lot. This green space features outdoor classrooms, flexible learning spaces, and a European-style plaza with benches and pavers. All but four of the campus’s 26 classrooms open up to this fenced green space.

The outdoor play and learning area has a bicycle/tricycle path winding around play structures and under bridges, two playgrounds, a small soccer field, and basketball and play courts. There are also student gardens and covered pavilions with wooden decks to help facilitate outdoor learning.

 

​View from multipurpose room across Boulevard towards Building C Entry at the Awty International School in Houston​View from multipurpose room across Boulevard towards Building C Entry at the Awty International School in Houston. Photo: Shepley Bulfinch.

 

In order to make the existing office buildings feel like a school environment for young children, the exterior glass, sign bands, and soffit panels were removed and the buildings were clad with vertical perforated multi-colored translucent resin panels. The outdoor classrooms use the same resin panels for roofing in a shingled pattern. Security fencing, check-in points, and separate entries and circulation for carpool drop-off, visitors, and faculty improve vehicular circulation and campus safety.

In addition to the 26 classrooms, there are also two multi-purpose rooms, art and music rooms, a teaching kitchen, a library, a media room, and dining facilities for students and faculty. A two-story gymnasium features a rock-climbing wall, multipurpose courts for basketball and volleyball, and a performance stage. The classrooms are linked via internal doors through all three buildings and large glass windows, skylights, and open spaces provide plentiful natural light.

J.E. Dunn Construction was the general contractor for the project while Cardno and Burns DeLatte & McCoy, Inc. handled structural engineering and MEP engineering duties respectively.

Related Stories

K-12 Schools | Jan 22, 2018

Innovative learning environments and our ‘Heschong Mahone moment’

An education market think tank proposes a radical research concept for evaluating learning environments.

K-12 Schools | Dec 6, 2017

Designing K-12 schools from the inside out

A step-by-step process finds better answers, saves money, and produces measurable results.

K-12 Schools | Nov 16, 2017

Future-proofing higher education: Understanding generation Z

There are three driving issues behind this next generation: demographic change, behavioral change, and the power to choose.

Engineers | Nov 2, 2017

CannonDesign expands its presence in Colorado with BWG acquisition

Future mergers could be in the offing.

K-12 Schools | Oct 31, 2017

Exploring empathy in architecture: Put yourself in your student’s shoes

People are enigmatic and inherently complex, which can make it difficult to design for a larger population.

K-12 Schools | Oct 28, 2017

A new elementary school in Cambridge, Mass., aims at being a pilot for that city’s NZE commitment

The building’s programming will provide more access to the community at large. 

Higher Education | Oct 26, 2017

Where campus meets corporate design

A building is much more than its appearance; it’s how the user will behave inside of it that determines its adaptability.

Giants 400 | Oct 9, 2017

Job-ready learning: The newest K-12 schools nudge students toward careers

Some long-term K-12 trends—like beefing up safety and security, and designing for more natural light and outdoor learning space—are still in vogue.

Giants 400 | Oct 9, 2017

Top 80 K-12 construction firms

Gilbane Building Co., Balfour Beatty US, and Skanska USA top BD+C’s ranking of the nation’s largest K-12 sector contractors and construction management firms, as reported in the 2017 Giants 300 Report.

Giants 400 | Oct 6, 2017

Top 40 K-12 engineering firms

AECOM, IMEG/KJWW/TTG, and STV top BD+C’s ranking of the nation’s largest K-12 sector engineering and EA firms, as reported in the 2017 Giants 300 Report.

boombox1
boombox2
native1

More In Category



K-12 Schools

Designing for dyslexia: How architecture can address neurodiversity in K-12 schools

Architects play a critical role in designing school environments that support students with learning differences, particularly dyslexia, by enhancing social and emotional competence and physical comfort. Effective design principles not only benefit students with dyslexia but also improve the learning experience for all students and faculty. This article explores how key design strategies at the campus, classroom, and individual levels can foster confidence, comfort, and resilience, thereby optimizing educational outcomes for students with dyslexia and other learning differences.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021