After 15 years of disuse, the Googie architecture-inspired TWA Flight Center at New York’s John F. Kennedy International Airport will be transformed into a hotel.
Gizmodo reports that the city’s Port Authority chose a renovation proposal from Jet Blue this week. The $265 million construction project got backing from Governor Andrew Cuomo this summer.
The hotel will have 505 rooms, 40,000 sf of meeting space, as many as eight restaurants, and a 10,000 sf observation deck that overlooks the runway. The old terminal will serve as the hotel’s lobby, and the rest of the rooms will be set back in a new building, according to Crain’s New York. Construction will begin in 2016, and the hotel is expected to open in 2018.
The terminal was designed by Finnish architect Eero Saarinen and built in the early 1960s. The roof helped to make the building stand out. Composed of four counterbalanced shells made of thin concrete, it looked like a bird taking flight, as Gizmodo wrote.
The TWA terminal was also one of the first airport terminals to use some of the most ubiquitous technologies. It utilized baggage carousels, automatic doors, jetways, and electronic departure time boards that were constantly updated.
Many photos of the terminal’s retro-futuristic interior can be seen on Curbed NY.
Photo: Seamus Murray/Creative Commons
Photo: Brett Weinstein/Wikimedia Commons
Photo: julesho/Creative Commons
Related Stories
| Jan 31, 2013
More severe wind storms should prompt nationwide reexamination of building codes, says insurance expert
The increased number and severity of storms with high winds nationally should prompt a reexamination of building codes in every community, says Mory Katz, vice president, Verisk Insurance Solutions Commercial Property, Jersey City, N.J.
| Aug 28, 2012
McCarthy begins construction on transportation center at Bob Hope Airport
Designed to meet LEED silver certification standards, the facility will feature unique, above ground base isolators that will resist a maximum credible earthquake.
| Jun 14, 2012
Viscardi joins LEO A DALY as VP, corporate director of aviation programs
Viscardi will be responsible for providing the vision and strategy for growing the firm’s aviation practice, identifying and establishing new clients, as well as maintaining existing client relationships.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 30, 2012
Construction milestone reached for $1B expansion of San Diego International Airport
Components of the $9-million structural concrete construction phase included a 700-foot-long, below-grade baggage-handling tunnel; metal decks covered in poured-in-place concrete; slab-on-grade for the new terminal; and 10 exterior architectural columns––each 56-feet tall and erected at a 14-degree angle.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| Mar 29, 2012
U.K.’s Manchester Airport tower constructed in nine days
Time-lapse video shows construction workers on the jobsite for 222 continuous hours.
| Mar 27, 2012
Skanska hires aviation construction expert Bob Postma
Postma will manage Skanska’s nationwide in-house team of airport construction experts who lead the industry in building and renovating airport facilities and their essential features.
| Jan 4, 2012
New LEED Silver complex provides space for education and research
The academic-style facility supports education/training and research functions, and contains classrooms, auditoriums, laboratories, administrative offices and library facilities, as well as spaces for operating highly sophisticated training equipment.