flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

JFK Airport's dormant TWA terminal will be reborn as a hotel

Airports

JFK Airport's dormant TWA terminal will be reborn as a hotel

New York City's Port Authority approved a proposal to revamp the ahead-of-its-time, midcentury structure.


By Mike Chamernik, Associate Editor | September 23, 2015
JFK Airport's dormant TWA terminal will be reborn as a hotel

TWA terminal at John F. Kennedy International Airport in New York City. Dmitry Avdeev/Wikimedia Commons

After 15 years of disuse, the Googie architecture-inspired TWA Flight Center at New York’s John F. Kennedy International Airport will be transformed into a hotel.

Gizmodo reports that the city’s Port Authority chose a renovation proposal from Jet Blue this week. The $265 million construction project got backing from Governor Andrew Cuomo this summer.

The hotel will have 505 rooms, 40,000 sf of meeting space, as many as eight restaurants, and a 10,000 sf observation deck that overlooks the runway. The old terminal will serve as the hotel’s lobby, and the rest of the rooms will be set back in a new building, according to Crain’s New York. Construction will begin in 2016, and the hotel is expected to open in 2018.

The terminal was designed by Finnish architect Eero Saarinen and built in the early 1960s. The roof helped to make the building stand out. Composed of four counterbalanced shells made of thin concrete, it looked like a bird taking flight, as Gizmodo wrote.

The TWA terminal was also one of the first airport terminals to use some of the most ubiquitous technologies. It utilized baggage carousels, automatic doors, jetways, and electronic departure time boards that were constantly updated.

Many photos of the terminal’s retro-futuristic interior can be seen on Curbed NY.

 

Photo: Seamus Murray/Creative Commons

Photo: Brett Weinstein/Wikimedia Commons

Photo: julesho/Creative Commons

Related Stories

| Aug 11, 2010

Great Solutions: Healthcare

11. Operating Room-Integrated MRI will Help Neurosurgeons Get it Right the First Time A major limitation of traditional brain cancer surgery is the lack of scanning capability in the operating room. Neurosurgeons do their best to visually identify and remove the cancerous tissue, but only an MRI scan will confirm if the operation was a complete success or not.

| Aug 11, 2010

Great Solutions: Collaboration

9. HOK Takes Videoconferencing to A New Level with its Advanced Collaboration Rooms To help foster collaboration among its 2,212 employees while cutting travel time, expenses, and carbon emissions traveling between its 24 office locations, HOK is fitting out its major offices with prototype videoconferencing rooms that are like no other in the U.

| Aug 11, 2010

2009 Judging Panel

A Matthew H. Johnson, PE Associate Principal Simpson Gumpertz & HegerWaltham, Mass. B K. Nam Shiu, SE, PEVP Walker Restoration Consultants Elgin, Ill. C David P. Callan, PE, CEM, LEED APSVPEnvironmental Systems DesignChicago D Ken Osmun, PA, DBIA, LEED AP Group President, ConstructionWight & Company Darien, Ill.

| Aug 11, 2010

Inspiring Offices: Office Design That Drives Creativity

Office design has always been linked to productivity—how many workers can be reasonably squeezed into a given space—but why isn’t it more frequently linked to creativity? “In general, I don’t think enough people link the design of space to business outcome,” says Janice Linster, partner with the Minneapolis design firm Studio Hive.

| Aug 11, 2010

BIM school, green school: California's newest high-performance school

Nestled deep in the Napa Valley, the city of American Canyon is one of a number of new communities in Northern California that have experienced tremendous growth in the last five years. Located 42 miles northeast of San Francisco, American Canyon had a population of just over 9,000 in 2000; by 2008, that figure stood at 15,276, with 28% of the population under age 18.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021