KTGY Architecture and Planning has unveiled the designs for the Main Street mixed-use portion of Downtown Superior. The project will create a walkable 12-acre mixed-use location incorporating residential, commercial, civic, retail, and restaurants.
The mixed-use community has been inspired by the area’s coal mining history and uses a blend of materials including brick and black metal. The designs for the 10 residential, four commercial, and four mixed-use buildings will help establish a sense of place along the new Main Street between Marshall Road and Superior Drive. In total, the buildings will comprise 382 residential units and over 70,000 sf of commercial, retail, and restaurant space.
On the north side of Main Street, a five-story apartment building with structured parking sits adjacent to retail spaces. “The large ‘wrap’ building, which features 76 residential units and commercial retail, will be topped by a 5th story resident clubhouse and pool deck which will have panoramic views of the Flat Irons and the entire Front Range,” said Terry Willis, AIA, LEED AP, KTGY Principal in a release. “The above-grade parking garage in the wrap building provides ultimate convenience both for residents and patrons of the civic functions, retail and restaurants.”
See Also: Building sensors: A digital crystal ball
A landscaped paseo runs as a central spine between the apartment building and the park-front restaurant, ending on the northern end of the paseo and connecting residential units to the retail plaza. The central plaza will serve as the public town square and open to Main Street, engaging the first-floor commercial uses along its sides. The central plaza is designed to host concerts, markets, and community events.
A stand-alone retail building will anchor the plaza at the corner of Superior and Main Street. On the south side of Main Street, two stories of residential sit atop a first-floor commercial space.
Construction will begin in the second quarter of 2020 with the first phase of apartments and retail slated for completion by the end of the summer in 2021. The final phase is anticipated to complete in the second half of 2022.
The overall development plans for Downtown Superior include public sports fields as part of a new 46-acre public park system, offices, hotels, entertainment, civic additional residential, and medical facilities.
Related Stories
High-rise Construction | Jul 7, 2015
Bjarke Ingels designs Frankfurt skyscraper with a surprise in the middle
Several levels in the center of the 185-meter tower are shifted outward to allow for terraces with city views.
Cultural Facilities | Jun 10, 2015
Artists turn oil tankers into architecture
Four Dutch artists propose transforming tankers into monuments with mixed-use space.
Wood | Jun 2, 2015
Michael Green Architecture designs world's tallest wood building for Paris competition
“Just as Gustave Eiffel shattered our conception of what was possible a century and a half ago, this project can push the envelope of wood innovation with France in the forefront," said architect Michael Green of the project.
Smart Buildings | May 28, 2015
4 ways cold-climate cities can make the most of their waterfronts
Though cold-climate cities pose a unique challenge for waterfront development, with effective planning waterfront cities with freezing winter months can still take advantage of the spaces year-round.
Sponsored | Coatings | May 14, 2015
Prismatic coatings accent the new Altara Center
This multi-use campus will contain a university, sports facilities, medical center, and world-class shopping
Mixed-Use | May 10, 2015
Construction on Orlando’s massive ‘innovation hub’ is finally starting
The $1 billion Creative Village development will create a business and education hub.
High-rise Construction | May 6, 2015
Two new designs submitted for New York City Riverside Center
Both designs reference the cantilevers and other elements featured in architect Christian de Portzamparc’s original masterplan for the complex, which has now been scrapped.
Building Owners | May 6, 2015
Hackathons and RFCs: Why one developer killed the RFP
In lieu of an RFP process, Skanska Commercial Development hosted a three-week "hackathon" to find an architect for its 2&U tower in Seattle.
Mixed-Use | May 5, 2015
Miami ‘innovation district’ will have 6.5 million sf of dense, walkable space
Designing a neighborhood from the ground-up, developers aim to create a dense, walkable district that fulfills what is lacking from Miami’s current auto-dependent layout.
Hotel Facilities | Apr 30, 2015
Atlanta Braves partner with Omni Hotels & Resorts to build hotel near new Suntrust Park
The Omni Atlanta Northwest Hotel will feature 16 floors with 260 guest rooms and suites, rooftop hospitality suites, 12,500 sf of meeting space, a signature restaurant, and an elevated pool deck and bar overlooking the plaza and ballpark.