flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Must see: 57-story modular skyscraper was completed in 19 days

Modular Building

Must see: 57-story modular skyscraper was completed in 19 days

After erecting the mega prefab tower in Changsha, China, modular builder BSB stated, “three floors in a day is China’s new normal.”


By Adilla Menayang, Assistant Digital Content Editor | March 10, 2015
A 57-floor Chinese skyscraper was completed in 19 days

The tower has an office space capacity for 4,000 employees and residential units for 800 households. Screenshot from BSB

With the use of modular pieces, Chinese builder BSB completed a 57-floor mixed-use tower in just 19 days, saying that “three floors in a day is China’s new normal.”

Inhabitat names it “the world’s tallest prefab tower.” Official pictures and a statement are yet to be released.

The tower, called Mini Sky City, is located in Changsha, in the Southeastern Chinese province of Hunan. It is part of the Sky City complex which is to include a 220-story tall skyscraper at 2,749 feet, but is yet to be completed,

According to Sploid, the construction company used 2 million-sf worth of modular blocks they manufactured themselves that are energy efficient. The tightly sealed blocks ensure an efficient use of HVAC systems, as well as protection from outside pollution.

A representative of the company told Sploid "that the use of modules reduced the use of concrete by 15,000 trucks, [which] almost eliminated all the release of dust in the air."

Mini Sky City has 19 atriums that are 33 feet tall each. It has the office space capacity for 4,000 employees, as well as residential units for 800 households.

Read more on Sploid.

 

Related Stories

| Dec 29, 2014

New mobile unit takes the worry out of equipment sterilization during healthcare construction [BD+C's 2014 Great Solutions Report]

Infection control, a constant worry for hospital administrators and clinical staffs, is heightened when the hospital is undergoing a major construction project. Mobile Sterilization Solutions, a mobile sterile-processing department, is designed to simplify the task. The technology was named a 2014 Great Solution by the editors of Building Design+Construction.

| Dec 28, 2014

Robots, drones, and printed buildings: The promise of automated construction

Building Teams across the globe are employing advanced robotics to simplify what is inherently a complex, messy process—construction.

| Dec 28, 2014

AIA course: Enhancing interior comfort while improving overall building efficacy

Providing more comfortable conditions to building occupants has become a top priority in today’s interior designs. This course is worth 1.0 AIA LU/HSW.

| Dec 28, 2014

Workplace design trends: Make way for the Millennials

Driven by changing work styles, mobile technology, and the growing presence of Millennials, today’s workplaces are changing, mostly for the better. We examine the top office design trends. 

Sponsored | | Dec 22, 2014

Harnessing the power of wind energy

Wind is generating a great deal of attention these days. I’m talking about wind power that occurs naturally in the atmosphere that is then converted into mechanical energy and then into electricity. SPONSORED CONTENT

Sponsored | | Dec 16, 2014

Deconstructing 2014

With 2014 coming to a close, we decided to take a look back at the year in construction. SPONSORED CONTENT

| Dec 2, 2014

Nashville planning retail district made from 21 shipping containers

OneC1TY, a healthcare- and technology-focused community under construction on 18.7 acres near Nashville, Tenn., will include a mini retail district made from 21 shipping containers, the first time in this market containers have been repurposed for such use. 

Sponsored | | Nov 26, 2014

A conversation with Paul Raiford, Director of Energy Services

Q&A with Paul Raiford, Director of Energy Services with Williams Scotsman. SPONSORED CONTENT

| Nov 24, 2014

Must see: Plans released for underwater city that could house 5,000 people

The design centers around a floating, 500-meter-wide sphere linked to a resource center on the ocean floor via a 15-kilometer, helix-shaped path. 

Sponsored | | Nov 19, 2014

Build green while you work green

Leading general contractors, including Skanska USA and Turner Construction, are implementing sustainable modular jobsite offices throughout the country. SPONSORED CONTENT

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021