flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Must see: 57-story modular skyscraper was completed in 19 days

Modular Building

Must see: 57-story modular skyscraper was completed in 19 days

After erecting the mega prefab tower in Changsha, China, modular builder BSB stated, “three floors in a day is China’s new normal.”


By Adilla Menayang, Assistant Digital Content Editor | March 10, 2015
A 57-floor Chinese skyscraper was completed in 19 days

The tower has an office space capacity for 4,000 employees and residential units for 800 households. Screenshot from BSB

With the use of modular pieces, Chinese builder BSB completed a 57-floor mixed-use tower in just 19 days, saying that “three floors in a day is China’s new normal.”

Inhabitat names it “the world’s tallest prefab tower.” Official pictures and a statement are yet to be released.

The tower, called Mini Sky City, is located in Changsha, in the Southeastern Chinese province of Hunan. It is part of the Sky City complex which is to include a 220-story tall skyscraper at 2,749 feet, but is yet to be completed,

According to Sploid, the construction company used 2 million-sf worth of modular blocks they manufactured themselves that are energy efficient. The tightly sealed blocks ensure an efficient use of HVAC systems, as well as protection from outside pollution.

A representative of the company told Sploid "that the use of modules reduced the use of concrete by 15,000 trucks, [which] almost eliminated all the release of dust in the air."

Mini Sky City has 19 atriums that are 33 feet tall each. It has the office space capacity for 4,000 employees, as well as residential units for 800 households.

Read more on Sploid.

 

Related Stories

Modular Building | Sep 25, 2018

Amazon invests in a prefab module supplier

Los Angeles-based Plant Prefab targets single- and multifamily construction.

Modular Building | Aug 6, 2018

More contractors are turning to offsite production for speed and quality

Skender launches an advanced manufacturing division. Katerra ups its bet on modular. Prefabrication comes to the rescue on multiple projects.

Modular Building | Jul 23, 2018

Offsite construction: Why it’s important for the survival of your firm

The industry is approaching its “heart attack moment,” with so many large projects that are chronically late, over budget, and unprofitable, writes FMI Capital Advisors’ Michael Swistun.

| May 30, 2018

Accelerate Live! talk: An AEC giant’s roadmap for integrating design, manufacturing, and construction

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), Skender CEO Mark Skender and Chief Design Officer Tim Swanson present the construction giant’s vision for creating a manufacturing-minded, vertically-integrated design-manufacturing-build business model.

| May 30, 2018

Accelerate Live! talk: From micro schools to tiny houses: What’s driving the downsizing economy?

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), micro-buildings design expert Aeron Hodges, AIA, explores the key drivers of the micro-buildings movement, and how the trend is spreading into a wide variety of building typologies.

Modular Building | Jan 12, 2017

The largest modular construction hotel project in New York City is starting to get pieced together

The hotel’s 300 rooms are made from 210 prefabricated pods from Polcom Modular.

Building Materials | Jan 9, 2017

Architects and researchers are developing new techniques for building in space

As setting foot on Mars becomes a more realistic goal, the search for how to best develop Architecture for the Red Planet is heating up.

Modular Building | Jul 22, 2016

PNC Bank’s 'Tiny Branch' opens on West Virginia University campus

The new branch doesn’t need much space for its ATM and new accounts and personal loans services.

Transit Facilities | Jun 12, 2016

Philippines’ oldest city getting its first public bus system

New York-based CAZA designed the modular bus stops with the city’s extreme weather conditions in mind.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021