flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NMHC Multifamily Construction Survey shows significant delays in apartment construction

Coronavirus

NMHC Multifamily Construction Survey shows significant delays in apartment construction

Survey asked construction firms how the spread of COVID-19 is affecting construction permitting, starts, completions, materials and labor.


By NMHC | April 17, 2020

Courtesy Pixabay

The percent of apartment developers reporting construction delays remained essentially the same in the second iteration of the National Multifamily Housing Council’s (NMHC) Construction Survey--56% compared to 55% in the April 3 survey. 

There was, however, a meaningful change in the percent of respondents reporting delays in construction starts, which portends potential for the COVID-19 pandemic to further exacerbate the nation’s affordable housing shortage. Of those reporting construction delays, fully 70% reported experiencing delays in starts, up 11 percentage points from the end of last month.

The NMHC Construction Survey is intended to gauge the magnitude of the disruption caused by the COVID-19 outbreak on multifamily construction. In addition to finding a majority are experiencing delays, it most notably determined that:

  • 77% of respondents experiencing construction delays reported issues with permitting (compared to a similar 76% from the last survey);
  • 28% noted a lack of materials is impacting their construction operations, up slightly from 24% at the end of March;
  • 44% indicated that COVID-19 outbreak-related labor constraints are affecting construction operations, a marginal increase from 41% of respondents last round.

As the outbreak continues, firms are becoming more adaptive in their strategies. Three-quarters of the respondents (75%) indicated that they have implemented new policies to deal with the hurdles forming in the virus’s wake – compared to 73% last round – with many of those firms indicating they have implemented more than one approach.

NMHC will conduct this Survey on an ongoing basis for the foreseeable future to continue to provide an estimation of the impact of COVID-19 on multifamily construction.

View the full survey results here.

This Survey is one of a number of NMHC-produced resources focused on the COVID-19 outbreak. Additional resources, data and materials can be found here.

Related Stories

Coronavirus | May 28, 2020

Cushman & Wakefield report examines work-at-home pros and cons

The office, now part of a larger workplace ecosystem, still reinforces employees’ connections with their companies.

Coronavirus | May 27, 2020

Clean is the new Green as U.S. hospitality sector inches closer to reopening

Three design firms share their takes on what will make customers more comfortable about returning.

Coronavirus | May 26, 2020

Multifamily developers report mounting delays in permitting and starts due to coronavirus pandemic

More than half (53%) of multifamily developer respondents reported construction delays in the jurisdictions where they operate, according to the third edition of the National Multifamily Housing Council (NMHC) COVID-19 Construction Survey.

Coronavirus | May 26, 2020

9 tips for mastering virtual public meetings during the COVID-19 pandemic

Mike Aziz, AIA, presents 9 tips for mastering virtual public meetings during the COVID-19 pandemic.

Coronavirus | May 22, 2020

Designing a health facility for the next pandemic

Planning with intent is the key to readiness, states Eppstein Uhen Architects, the guide’s author.

Coronavirus | May 22, 2020

COVID-19: Healthcare designers look to the future of medical facilities in light of coronavirus pandemic

The American College of Healthcare Architects (ACHA) has released the key findings of a survey of its members revealing their insights on the future of healthcare architecture and the role of design in the context of the COVID-19 healthcare crisis.

Coronavirus | May 18, 2020

Will empty hotels provide an answer for affordable housing shortage?

A Los Angeles-based startup sees the Midwest as most fertile for adaptive reuse.

Coronavirus | May 18, 2020

Infection control in office buildings: Preparing for re-occupancy amid the coronavirus

Making workplaces safer will require behavioral resolve nudged by design.

Coronavirus | May 18, 2020

Global design firms collaborate on new COVID-19 mobile testing lab to bring testing to vulnerable communities worldwide

Perkins and Will, Schmidt Hammer Lassen Architects, and Arup Group develop scalable solutions for increased testing capacity within high-density and under-served neighborhoods. 

Coronavirus | May 11, 2020

Experts offer a 13-point plan to reduce coronavirus deaths in nursing homes

Two nationally recognized experts in the design of senior living facilities offer a 13-point plan to protect our frailest citizens.

boombox1
boombox2
native1

More In Category


MFPRO+ Special Reports

Top 10 trends in affordable housing

Among affordable housing developers today, there’s one commonality tying projects together: uncertainty. AEC firms share their latest insights and philosophies on the future of affordable housing in BD+C's 2023 Multifamily Annual Report.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021