flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NMHC Multifamily Construction Survey shows significant delays in apartment construction

Coronavirus

NMHC Multifamily Construction Survey shows significant delays in apartment construction

Survey asked construction firms how the spread of COVID-19 is affecting construction permitting, starts, completions, materials and labor.


By NMHC | April 17, 2020

Courtesy Pixabay

The percent of apartment developers reporting construction delays remained essentially the same in the second iteration of the National Multifamily Housing Council’s (NMHC) Construction Survey--56% compared to 55% in the April 3 survey. 

There was, however, a meaningful change in the percent of respondents reporting delays in construction starts, which portends potential for the COVID-19 pandemic to further exacerbate the nation’s affordable housing shortage. Of those reporting construction delays, fully 70% reported experiencing delays in starts, up 11 percentage points from the end of last month.

The NMHC Construction Survey is intended to gauge the magnitude of the disruption caused by the COVID-19 outbreak on multifamily construction. In addition to finding a majority are experiencing delays, it most notably determined that:

  • 77% of respondents experiencing construction delays reported issues with permitting (compared to a similar 76% from the last survey);
  • 28% noted a lack of materials is impacting their construction operations, up slightly from 24% at the end of March;
  • 44% indicated that COVID-19 outbreak-related labor constraints are affecting construction operations, a marginal increase from 41% of respondents last round.

As the outbreak continues, firms are becoming more adaptive in their strategies. Three-quarters of the respondents (75%) indicated that they have implemented new policies to deal with the hurdles forming in the virus’s wake – compared to 73% last round – with many of those firms indicating they have implemented more than one approach.

NMHC will conduct this Survey on an ongoing basis for the foreseeable future to continue to provide an estimation of the impact of COVID-19 on multifamily construction.

View the full survey results here.

This Survey is one of a number of NMHC-produced resources focused on the COVID-19 outbreak. Additional resources, data and materials can be found here.

Related Stories

Coronavirus | Jun 30, 2020

The great reset and our new work life

As many countries begin to return to the office, it’s a chance to ask ourselves: what do we truly value?

Coronavirus | Jun 26, 2020

Infection control in buildings in the age of the coronavirus

Controlling future infection spreads could become job one for most buildings and spaces.

Coronavirus | Jun 26, 2020

ICYMI The Weekly show: The hotel sector's 'competition for cleanliness' and workplace design amid COVID-19

This week on The Weekly (June 25 episode), BD+C editors spoke with leaders from Skidmore, Owings & Merrill, Henderson Engineers, and Shawmut Design & Construction on three timely topics.

Coronavirus | Jun 23, 2020

A look back at design standard shifts: ADA vs. COVID-19

The short story is official design guidelines are slow to be developed and made into law. 

Coronavirus | Jun 23, 2020

WATG designs solution for isolating without sacrificing social connectivity

The design was inspired by oriel bay windows.

Coronavirus | Jun 22, 2020

Boldt creates an innovation task force to speed up safe opening of jobsites, 14 offices

Boldt creates an innovation task force to speed up safe opening of jobsites, 14 offices

Coronavirus | Jun 19, 2020

Experts address COVID-19's impact on nursing homes and schools on The Weekly

The June 18 episode of BD+C's "The Weekly" is available for viewing on demand. 

Coronavirus | Jun 18, 2020

Brown University tops off first housing building in three decades

The facility, scheduled for completion next April, will combine a residence hall with student health services.

Coronavirus | Jun 17, 2020

HOK and Germfree partner to design mobile COVID-19 testing lab

Access to quick, reliable, and repeated testing has been one of the greatest challenges for businesses, institutions and individuals during the COVID-19 crisis.

Coronavirus | Jun 17, 2020

Guiding changes in the workplace: Past, present, and future

Since the COVID-19 pandemic, many companies are managing sudden change as they assess the impact on workplace design and how people use spaces.

boombox1
boombox2
native1

More In Category


MFPRO+ Special Reports

Top 10 trends in affordable housing

Among affordable housing developers today, there’s one commonality tying projects together: uncertainty. AEC firms share their latest insights and philosophies on the future of affordable housing in BD+C's 2023 Multifamily Annual Report.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021