The percent of apartment developers reporting construction delays remained essentially the same in the second iteration of the National Multifamily Housing Council’s (NMHC) Construction Survey--56% compared to 55% in the April 3 survey.
There was, however, a meaningful change in the percent of respondents reporting delays in construction starts, which portends potential for the COVID-19 pandemic to further exacerbate the nation’s affordable housing shortage. Of those reporting construction delays, fully 70% reported experiencing delays in starts, up 11 percentage points from the end of last month.
The NMHC Construction Survey is intended to gauge the magnitude of the disruption caused by the COVID-19 outbreak on multifamily construction. In addition to finding a majority are experiencing delays, it most notably determined that:
- 77% of respondents experiencing construction delays reported issues with permitting (compared to a similar 76% from the last survey);
- 28% noted a lack of materials is impacting their construction operations, up slightly from 24% at the end of March;
- 44% indicated that COVID-19 outbreak-related labor constraints are affecting construction operations, a marginal increase from 41% of respondents last round.
As the outbreak continues, firms are becoming more adaptive in their strategies. Three-quarters of the respondents (75%) indicated that they have implemented new policies to deal with the hurdles forming in the virus’s wake – compared to 73% last round – with many of those firms indicating they have implemented more than one approach.
NMHC will conduct this Survey on an ongoing basis for the foreseeable future to continue to provide an estimation of the impact of COVID-19 on multifamily construction.
View the full survey results here.
This Survey is one of a number of NMHC-produced resources focused on the COVID-19 outbreak. Additional resources, data and materials can be found here.
Related Stories
Coronavirus | Jun 30, 2020
The great reset and our new work life
As many countries begin to return to the office, it’s a chance to ask ourselves: what do we truly value?
Coronavirus | Jun 26, 2020
Infection control in buildings in the age of the coronavirus
Controlling future infection spreads could become job one for most buildings and spaces.
Coronavirus | Jun 26, 2020
ICYMI The Weekly show: The hotel sector's 'competition for cleanliness' and workplace design amid COVID-19
This week on The Weekly (June 25 episode), BD+C editors spoke with leaders from Skidmore, Owings & Merrill, Henderson Engineers, and Shawmut Design & Construction on three timely topics.
Coronavirus | Jun 23, 2020
A look back at design standard shifts: ADA vs. COVID-19
The short story is official design guidelines are slow to be developed and made into law.
Coronavirus | Jun 23, 2020
WATG designs solution for isolating without sacrificing social connectivity
The design was inspired by oriel bay windows.
Coronavirus | Jun 22, 2020
Boldt creates an innovation task force to speed up safe opening of jobsites, 14 offices
Boldt creates an innovation task force to speed up safe opening of jobsites, 14 offices
Coronavirus | Jun 19, 2020
Experts address COVID-19's impact on nursing homes and schools on The Weekly
The June 18 episode of BD+C's "The Weekly" is available for viewing on demand.
Coronavirus | Jun 18, 2020
Brown University tops off first housing building in three decades
The facility, scheduled for completion next April, will combine a residence hall with student health services.
Coronavirus | Jun 17, 2020
HOK and Germfree partner to design mobile COVID-19 testing lab
Access to quick, reliable, and repeated testing has been one of the greatest challenges for businesses, institutions and individuals during the COVID-19 crisis.
Coronavirus | Jun 17, 2020
Guiding changes in the workplace: Past, present, and future
Since the COVID-19 pandemic, many companies are managing sudden change as they assess the impact on workplace design and how people use spaces.