The percent of apartment developers reporting construction delays remained essentially the same in the second iteration of the National Multifamily Housing Council’s (NMHC) Construction Survey--56% compared to 55% in the April 3 survey.
There was, however, a meaningful change in the percent of respondents reporting delays in construction starts, which portends potential for the COVID-19 pandemic to further exacerbate the nation’s affordable housing shortage. Of those reporting construction delays, fully 70% reported experiencing delays in starts, up 11 percentage points from the end of last month.
The NMHC Construction Survey is intended to gauge the magnitude of the disruption caused by the COVID-19 outbreak on multifamily construction. In addition to finding a majority are experiencing delays, it most notably determined that:
- 77% of respondents experiencing construction delays reported issues with permitting (compared to a similar 76% from the last survey);
- 28% noted a lack of materials is impacting their construction operations, up slightly from 24% at the end of March;
- 44% indicated that COVID-19 outbreak-related labor constraints are affecting construction operations, a marginal increase from 41% of respondents last round.
As the outbreak continues, firms are becoming more adaptive in their strategies. Three-quarters of the respondents (75%) indicated that they have implemented new policies to deal with the hurdles forming in the virus’s wake – compared to 73% last round – with many of those firms indicating they have implemented more than one approach.
NMHC will conduct this Survey on an ongoing basis for the foreseeable future to continue to provide an estimation of the impact of COVID-19 on multifamily construction.
View the full survey results here.
This Survey is one of a number of NMHC-produced resources focused on the COVID-19 outbreak. Additional resources, data and materials can be found here.
Related Stories
Glass and Glazing | May 8, 2020
Vitro Architectural Glass releases guide on decontaminating glass surfaces
The five-page technical document offers methods for cleaning and sanitizing glass surfaces.
Coronavirus | May 7, 2020
White paper clarifies steps, roles for use of metal composite material
Responsibilities of manufacturers, distributors, and fabricators outlined.
Coronavirus | May 7, 2020
Architects release new resource for safer re-occupancy of buildings
The American Institute of Architects (AIA) is releasing a new Re-occupancy Assessment Tool today that provides strategies for limiting exposure to COVID-19 in buildings.
Coronavirus | May 6, 2020
Reopening Main Street post-COVID-19 quarantine
Cities and communities will need to adjust public space to allow customers back in with distancing in mind.
Coronavirus | May 6, 2020
Making jobsites safer in the COVID-19 world
A leading construction manager and installer certification alliance share their insights.
Coronavirus | May 6, 2020
National Construction Association and Procore to release new data showing the impacts of the coronavirus on the constructionindustry
Data will be released on Friday, may 8 at 12 pm EDT.
Healthcare Facilities | May 5, 2020
Holt Construction, U.S. Army Corps of Engineers complete temporary hospital in two weeks
The project is located in Paramus, N.J.
Coronavirus | May 5, 2020
How will COVID-19 change the procurement of professional design services?
We can use this moment as a test-case to build greater flexibility into how we pursue, win and deliver capital projects, better preparing the industry to meet the next disruption.
Coronavirus | May 4, 2020
Design steps for reopening embattled hotels
TPG Architecture recommends post-coronavirus changes in three stages.
Coronavirus | Apr 30, 2020
Gilbane shares supply-chain status of products affected by coronavirus
Imported products seem more susceptible to delays