Leo A Daly led the reconstruction of the historic Burlington Station, Omaha, Neb. The 1898 Greek Revival train terminal, which was listed on the National Register of Historic Places in 1974, had been abandoned for nearly four decades. The client, KETV-7, a Hearst Television–owned station, wanted a downtown location with quick access to the interstate system and sufficient ceiling heights to accommodate the technological upgrades the ABC affiliate needed to stay competitive.
The Building Team installed new mechanical systems to save energy, minimize wall penetrations, and retain views of historic elements. A ’50s-era parking deck and an unsound passenger concourse, taxi drive, and plaza were demolished. The masonry envelope was stabilized and restored with salvaged matching brick. Six cast-iron columns in the baggage room were replaced with eight steel columns supported by concrete micro-piles sunk 80 feet into bedrock.
Before. Courtesy of Leo A Daly.
PROJECT SUMMARY
Silver Award Winner | Omaha, Neb.
Building Team: Leo A Daly (submitting firm, architect, SE, CE); Hearst Television (owner); Broadcast Building Co. (CM/owner’s representative); DFW Consulting Group (MEP); McGill Restoration (masonry); PML (stucco contractor); Lund-Russ Constructors (GC).
Details: 47,000 sf. Construction cost: Confidential. Construction time: September 2013 to October 2015. Delivery method: Design-bid-build.
Related Stories
Reconstruction Awards | Nov 16, 2015
Lumberyard turned into Chicago charter school
While the existing structures were in poor condition, the Building Team preserved and restored 75% of the spaces and incorporated historic elements in the final design of the Intrinsic School on Chicago's Northwest side.
Reconstruction Awards | Nov 12, 2015
Columbia Grammar and Preparatory School grows with the times
The 251-year-old NYC school was a design-build project that overcame issues like tight space and zoning appeals during its redevelopment.
Reconstruction Awards | Nov 10, 2015
Restoration of the Whitney Building provides hope for Detroit
Four years ago, Whitney Partners purchased the 253,000-sf Whitney for $3.3 million. Their mission was to turn the 19-story structure into a mixed-use hotel, rental apartment, and retail center that would serve as a reminder of more prosperous times in Detroit’s past.
Reconstruction Awards | Nov 9, 2015
University of Chicago uses space economically with Saieh Hall
The five-story, 100,000-sf seminary was converted into a modern education facility that would be fully integrated into the university’s Hyde Park campus. The project demonstrated the university’s commitment to finding a balance between new construction and adaptive reuse of historically significant buildings.
Reconstruction Awards | Nov 9, 2015
King of kings: Classic brooklyn movie theater stages a return engagement
The theater, which withstood vacancy, neglect and vandalism, has been redeveloped with a goal: balance preservation with the creation of a modern performance space.