flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Reconstruction Awards: Marwen

Reconstruction Awards

Reconstruction Awards: Marwen

Marwen currently offers 100 studio courses to 850 underserved students from 295 schools and 53 zip codes.


By BD+C Staff | November 16, 2016

The Building Team for the Marwen arts campus gutted portions of the space to create a much-needed new vehicular entry and loggia. © Steve Hall / Hedrich Blessing

Marwen is a nonprofit visual arts education center on Chicago’s Near North Side. Founded in 1987 by entrepreneur Steven Berkowitz, Marwen currently offers 100 studio courses to 850 underserved students (grades 6-12) from 295 schools and 53 zip codes. Two-thirds of the students are female; 95% of the students come from low-income families. Marwen also provides free college and career counseling to high schoolers: 91% of graduates get accepted to college.

Wheeler Kearns Architects led the Marwen renovation and expansion. The chief problem was a lack of public presence to the campus. The Building Team created a new vehicular entry courtyard  that allowed for the relocation of the main entrance and the addition of a 950-sf steel-and-glass loggia.

Integrated thermal breaks in the loggia’s steel structure minimize energy loss. An underfloor air distribution system was installed to reduce energy consumption and improve indoor air quality. The new loggia provides a safe and visible gathering space for students and new public gallery space to showcase student work.

 

Basement Mixed Media Studio. Natural light is borrowed via clerestory windows adjacent to the Fashion/Fiber Studio. Steve Hall / Hedrich Blessing.

 

PROJECT SUMMARY 

 

Silver Award Winner | Chicago, Ill.

Building Team: Wheeler Kearns Architects (submitting firm, architect); Thornton Tomasetti (SE); Terra Engineering (CE); Wolff Landscape Architects; Lux Populi (lighting); and Power Construction Co. (GC).

Details: 16,060 sf. Construction cost: $3.4 million. Construction time: January to October 2015.  Delivery method: Design-build.

Related Stories

Reconstruction Awards | Nov 16, 2015

Lumberyard turned into Chicago charter school

While the existing structures were in poor condition, the Building Team preserved and restored 75% of the spaces and incorporated historic elements in the final design of the Intrinsic School on Chicago's Northwest side.

Reconstruction Awards | Nov 12, 2015

Columbia Grammar and Preparatory School grows with the times

The 251-year-old NYC school was a design-build project that overcame issues like tight space and zoning appeals during its redevelopment.

Reconstruction Awards | Nov 10, 2015

Restoration of the Whitney Building provides hope for Detroit

Four years ago, Whitney Partners purchased the 253,000-sf Whitney for $3.3 million. Their mission was to turn the 19-story structure into a mixed-use hotel, rental apartment, and retail center that would serve as a reminder of more prosperous times in Detroit’s past.

Reconstruction Awards | Nov 9, 2015

University of Chicago uses space economically with Saieh Hall

The five-story, 100,000-sf seminary was converted into a modern education facility that would be fully integrated into the university’s Hyde Park campus. The project demonstrated the university’s commitment to finding a balance between new construction and adaptive reuse of historically significant buildings.

Reconstruction Awards | Nov 9, 2015

King of kings: Classic brooklyn movie theater stages a return engagement

The theater, which withstood vacancy, neglect and vandalism, has been redeveloped with a goal: balance preservation with the creation of a modern performance space.

boombox1
boombox2
native1

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021